When drainage fails
Bleeding directly into the pressurized catch left 74.889 m³ on the aisle. A 40 mm low spot left 42.328 m³. A 0.15% flash-mass control left 4,964.1 m³; the modeled level exceeds the assumed deck containment.
Two crude-oil transfer trains over 72 hours. The panel replays simulated incidents using eight unavailable piston pairs per train. All oil limits cover both trains together.
Emergency crude transfer and containment over 72 hours. The paired system combines movable buyer tanks, a dry drive, a shored catch beneath each loading yard and passive gas displacement.
Of 20 complete simulated missions, 0 passed, 0 failed and 20 remain unverified. The aisle measurement tracks oil inside one yard. The exterior limit covers both trains through hour 72.
Bleeding directly into the pressurized catch left 74.889 m³ on the aisle. A 40 mm low spot left 42.328 m³. A 0.15% flash-mass control left 4,964.1 m³; the modeled level exceeds the assumed deck containment.
A mechanically compelled disconnect seated before failure admitted zero. In the separate unexpected-loss test the dock latch admitted at most 34.53 L when both weights read healthy. False physical follower travel admitted 1,437.14 L.
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Original inlet at the scheduled stop | Not applicable |
| Unannounced loss at the original inlet | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Safe total-loss isolation and containment | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Original inlet at the scheduled stop | Not applicable |
| Unannounced loss at the original inlet | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Safe total-loss isolation and containment | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Required flow or scheduled stop | Pass |
| Original inlet at the scheduled stop | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Genuine received oil | Not applicable |
| Final sale quality | Not applicable |
| Finite stock, energy and movement | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Wet pathways separated from buyer inventory | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The registered incident assigns a loaded-capture duty. A separate yard model imposes simultaneous damage to the loaded vehicles at hour 60 and follows their oil through hour 72.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Loaded liquid and gas capture through hour 72 | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Original inlet at the scheduled stop | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Short loaded-roof pressure test | Pass |
| Loaded-yard oil and water mass balance | Pass |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Original inlet at the scheduled stop | Not applicable |
| Unannounced loss at the original inlet | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Safe total-loss isolation and containment | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Original inlet at the scheduled stop | Not applicable |
| Unannounced loss at the original inlet | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Safe total-loss isolation and containment | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Original inlet at the scheduled stop | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Original inlet at the scheduled stop | Not applicable |
| Unannounced loss at the original inlet | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Safe total-loss isolation and containment | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Original inlet at the scheduled stop | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
Complete mission Unverified
Loaded-yard damage trial The registered incident assigns a loaded-capture duty. A separate yard model imposes simultaneous damage to the loaded vehicles at hour 60 and follows their oil through hour 72.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Loaded liquid and gas capture through hour 72 | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Original inlet at the scheduled stop | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Short loaded-roof pressure test | Pass |
| Loaded-yard oil and water mass balance | Pass |
Complete mission Unverified
Loaded-yard damage trial The registered incident assigns a loaded-capture duty. A separate yard model imposes simultaneous damage to the loaded vehicles at hour 60 and follows their oil through hour 72.
| Requirement | Result |
|---|---|
| Unannounced loss at the original inlet | Unverified |
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Loaded liquid and gas capture through hour 72 | Unverified |
| Safe total-loss isolation and containment | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Original inlet at the scheduled stop | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Short loaded-roof pressure test | Pass |
| Loaded-yard oil and water mass balance | Pass |
Complete mission Unverified
Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.
| Requirement | Result |
|---|---|
| Oil crossing the site boundary | Unverified |
| Installed support response | Unverified |
| Wet pathways separated from buyer inventory | Unverified |
| Required flow or scheduled stop | Pass |
| Genuine received oil | Pass |
| Final sale quality | Pass |
| Finite stock, energy and movement | Pass |
| Train losses and gas access | Pass |
| Gallery gas temperature and pressure | Pass |
| Hot-water and pipe pressure | Pass |
| Rolling-hour water ingress | Pass |
| Counted paired excavation | Pass |
| Conditional exterior trace oil | Pass |
| Original inlet at the scheduled stop | Not applicable |
| Unannounced loss at the original inlet | Not applicable |
| Short loaded-roof pressure test | Not applicable |
| Loaded liquid and gas capture through hour 72 | Not applicable |
| Safe total-loss isolation and containment | Not applicable |
| Loaded-yard oil and water mass balance | Not applicable |
A 3.75 m deep shored cellar, sixteen gravity legs and a closed variable-volume nitrogen holder serve each buyer. Each leg starts dry. Liquid from the aisle pushes its initial gas into a finite primer pouch.
Both assignments of 73% and 100% gas access use the same twenty incident clocks with eight piston pairs unavailable per train. Ground preparation, gas charging and structures are included in the selected estimate.
The one-litre limit applies to both trains together through hour 72. Oil on a loading aisle has a known location inside the model. Its eventual path across the site boundary requires separate evidence.
The two buyers share one exterior allowance. The timed leakage calculation follows the loaded carts from hour zero, then follows liquid pressure in the aisle and catch through hour 72. It assumes specified pore lengths, viscosity and geometry.
Emergency crude transfer and containment after damage. The design target is to deliver 40% of normal flow for 72 hours to an intact buyer and stop delivery to a failed buyer while containing the oil already on site.
Buyer fails during flow Both weights read healthy. The independent tank-level trip admitted 117.19 L. In a separate bench calculation a direct mechanical comparison limited transfer to 34.53 L. A mechanically compelled disconnect seated before loss admitted zero.
The acceptance boundary is the original buyer inlet. Oil crossing after loss counts even if a downstream structure catches it. Volumes below are reference litres across both buyers.
A dock-mounted differential compares a shaft driven by actual inlet displacement with a follower on the liquid surface of the final tank. A magnetic pickup through a sealed wall transmits the follower motion to a spring latch. If delivered oil gets ahead of retained oil, the latch removes the inlet valve hold-open force. Weights and digital indications have no mechanical authority.
A fixed dry drive ratio of 1.00510 meters customer-quality stock through three alternating cylinders. Two independent buyers receive the combined flow. Each pressure rule was tested with 73% gas access on either train and 100% on the other.
The 12 mm support plate, movable receivers and two pipe lengths are charged to one material and fluid budget. Each train carries eight unavailable piston pairs. Only the modeled layouts and pressure rules receive credit.
Closing the dock isolates the parked vehicles from further supply. A common failure can still breach the oil they already contain. A separate whole-yard catch was tested with heat, displaced gas and finite return passages.
| Incident | Delivery duty | Lowest genuine flow | Water pressure above saturation | Peak gallery gas | Full case |
|---|---|---|---|---|---|
| 01 · Source closing energy lost and conventional valves jammed | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 02 · Terminal closing energy lost and conventional valves jammed | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 03 · Source and terminal closing energy lost with jammed conventional valves | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 04 · Trigger inlets blocked with jammed conventional valves | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 05 · Pilots blocked with jammed conventional valves | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 06 · Sleeves torn with jammed conventional valves | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 07 · Sleeve closing force tripled with jammed conventional valves | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 08 · 5 mm² seat gaps with jammed conventional valves | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 09 · Three route boundaries lost | 72 h | 400.158531 m³/h | 4.149 kPa | 115.828 °C | Open |
| 10 · Independent heat envelope penetrated | 72 h | 400.158531 m³/h | 4.149 kPa | 115.828 °C | Open |
| 11 · Closed catch boundary lost | Immediate isolation | No sale due | 4.149 kPa | 115.828 °C | Open |
| 12 · Loaded collapse and outer-vault loss at 60 h | 60 h | 400.158531 m³/h | 2.333 kPa | 115.828 °C | Open |
| 13 · 100 mm source-gas wall breach | 72 h | 400.158531 m³/h | 4.149 kPa | 115.828 °C | Open |
| 14 · Gas heat transfer degraded | 72 h | 400.158531 m³/h | 4.229 kPa | 116.067 °C | Open |
| 15 · Catch heat transfer reduced at 60 h | 60 h | 400.158531 m³/h | 4.149 kPa | 115.828 °C | Open |
| 16 · Local pocket outer boundary lost | 72 h | 400.158531 m³/h | 4.149 kPa | 115.828 °C | Open |
| 17 · Catch heat transfer lost at 60 h | 60 h | 400.158531 m³/h | 4.149 kPa | 115.828 °C | Open |
| 18 · Enclosure gas starts at 86°C | 60 h | 400.158531 m³/h | 2.316 kPa | 115.828 °C | Open |
| 19 · Catcher shield fully open | 60 h | 400.158531 m³/h | 2.333 kPa | 115.828 °C | Open |
| 20 · All current quality evidence falsified | 72 h | 400.158531 m³/h | 4.229 kPa | 116.067 °C | Open |
For the pipe supported on steel bearing plates, the model replayed the assigned delivery and isolation duties for all 20 incidents. The mobile buyer tank and outer catches have their own site and resource assumptions. All results are simulated. Every incident still has an open 72-hour requirement.
The bearing plates bring paired excavation from 72,112,952.4 to 72,130,332.5 m³. The worst rolling hour admits 0.665048 L of water across both installations.
The pipe grid bears directly on 12 mm steel plates and solid shims. The model charges their weight, added resistance, surfaces and excavation. The original buyer and roof remain in this matched test.
The 5.5 m gallery supplies the remote circulation equipment. A restricted train has 919 available parcels out of 1,262. The local held-gas volume is one quarter of its assigned capacity.
A tank parks beside the buyer inlet, fills at a short dock, seals and moves to a parking bay. A dry follower measures the rise of oil in the tank. All delivered product remains on site through hour 72.
Cases 12, 18 and 19 each stop delivery at hour 60. The stock histories give about 12,826 m³ of hot buyer oil per station. The incident model adds 1,531 m³ of intercepted water with the drains blocked.
Two independent covered perimeter catches were tested with the measured times, wall locations and volumes of liquid leaving the simulated inner curb. Both layouts use fixed storage. No pumping or drainage was credited.
| Incident | Sale duty | Lowest genuine flow | Water pressure above saturation | Peak gallery gas | Full 72-hour case |
|---|---|---|---|---|---|
| 01 · Source closing energy lost and conventional valves jammed | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 02 · Terminal closing energy lost and conventional valves jammed | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 03 · Source and terminal closing energy lost with jammed conventional valves | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 04 · Trigger inlets blocked with jammed conventional valves | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 05 · Pilots blocked with jammed conventional valves | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 06 · Sleeves torn with jammed conventional valves | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 07 · Sleeve closing force tripled with jammed conventional valves | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 08 · 5 mm² seat gaps with jammed conventional valves | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 09 · Three route boundaries lost | 72 h | 400.044194 m³/h | 4.149 kPa | 115.828 °C | Open |
| 10 · Independent heat envelope penetrated | 72 h | 400.044194 m³/h | 4.149 kPa | 115.828 °C | Open |
| 11 · Closed catch boundary lost | 0 h | No sale due | 4.149 kPa | 115.828 °C | Open |
| 12 · Loaded collapse and outer-vault loss at 60 h | 60 h | 400.044194 m³/h | 2.333 kPa | 115.828 °C | Open |
| 13 · 100 mm source-gas wall breach | 72 h | 400.044194 m³/h | 4.149 kPa | 115.828 °C | Open |
| 14 · Gas heat transfer degraded | 72 h | 400.044194 m³/h | 4.229 kPa | 116.067 °C | Open |
| 15 · Catch heat transfer reduced at 60 h | 60 h | 400.044194 m³/h | 4.149 kPa | 115.828 °C | Open |
| 16 · Local pocket outer boundary lost | 72 h | 400.044194 m³/h | 4.149 kPa | 115.828 °C | Open |
| 17 · Catch heat transfer lost at 60 h | 60 h | 400.044194 m³/h | 4.149 kPa | 115.828 °C | Open |
| 18 · Enclosure gas starts at 86°C | 60 h | 400.044194 m³/h | 2.316 kPa | 115.828 °C | Open |
| 19 · Catcher shield fully open | 60 h | 400.044194 m³/h | 2.333 kPa | 115.828 °C | Open |
| 20 · All current quality evidence falsified | 72 h | 400.044194 m³/h | 4.229 kPa | 116.067 °C | Open |
Six incidents require 72 hours of delivery. Five require 60 hours of delivery followed by isolation. Nine require immediate isolation. All twenty require containment through hour 72. An open case has one or more unverified conditions.
Three 35 L cylinders at each buyer overlap their delivery strokes. At second 20, each original inlet carries 75 hot L/s. The buyer then loses incoming oil while its weight reading stays falsely healthy. The simulation counts all oil that crosses either inlet after the loss, including oil caught downstream.
| Both installations together | Three-cylinder simulation | Limit |
|---|---|---|
| Water in the worst rolling hour | 0.665048 L | 0.699 L |
| Exterior oil over 72 hours · clean components | 0.999523 L | 1 L |
| Exterior oil with 10 mg/m² of mobile residue on the new equipment | 1.000257 L | 1 L · exceeds limit |
| Counted excavation | 72,112,952.4 m³ | 72,200,000 m³ |
| Incident | Delivery hours | Lowest genuine flow, m³/h | Off-spec / tested lots | Outstanding checks | Full case |
|---|---|---|---|---|---|
| 01 · Source closing energy lost and conventional valves jammed | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 02 · Terminal closing energy lost and conventional valves jammed | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 03 · Source and terminal closing energy lost with jammed conventional valves | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 04 · Trigger inlets blocked with jammed conventional valves | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 05 · Pilots blocked with jammed conventional valves | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 06 · Sleeves torn with jammed conventional valves | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 07 · Sleeve closing force tripled with jammed conventional valves | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 08 · 5 mm² seat gaps with jammed conventional valves | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 09 · Three route boundaries lost | 72 | 400.044 | 0 / 2,672 | Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protection | Open |
| 10 · Independent heat envelope penetrated | 72 | 400.044 | 0 / 2,672 | Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protection | Open |
| 11 · Closed catch boundary lost | 0 | — | No sale | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter | Open |
| 12 · Loaded collapse and outer-vault loss at 60 h | 60 | 400.044 | 0 / 2,224 | Exterior oil and bulk spill retention · Response of the new foundations · Loaded liquid and gas containment · Unobserved loss past the receiver meter · Gas moisture and product protection | Open |
| 13 · 100 mm source-gas wall breach | 72 | 400.044 | 0 / 2,672 | Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protection | Open |
| 14 · Gas heat transfer degraded | 72 | 400.044 | 0 / 2,672 | Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protection | Open |
| 15 · Catch heat transfer reduced at 60 h | 60 | 400.044 | 0 / 2,224 | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter · Gas moisture and product protection | Open |
| 16 · Local pocket outer boundary lost | 72 | 400.044 | 0 / 2,672 | Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protection | Open |
| 17 · Catch heat transfer lost at 60 h | 60 | 400.044 | 0 / 2,224 | Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter · Gas moisture and product protection | Open |
| 18 · Enclosure gas starts at 86°C | 60 | 400.044 | 0 / 2,224 | Exterior oil and bulk spill retention · Response of the new foundations · Loaded liquid and gas containment · Unobserved loss past the receiver meter · Gas moisture and product protection | Open |
| 19 · Catcher shield fully open | 60 | 400.044 | 0 / 2,224 | Exterior oil and bulk spill retention · Response of the new foundations · Loaded liquid and gas containment · Unobserved loss past the receiver meter · Gas moisture and product protection | Open |
| 20 · All current quality evidence falsified | 72 | 400.044 | 0 / 2,672 | Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protection | Open |
A mechanical collar requires fresh shaft travel before oil can enter the buyer. Select when the receiver loses its ability to accept oil. The measured volume is the amount crossing the original buyer inlet after that loss, summed across both buyers.
The catch stays silent. Residual motion ends before the collar earns enough fresh travel to open. Both buyer inlets remain seated.
With the 6.8 m wall, overhead gas paths and pulse cells, the combined model budgets 0.665047 L/h of water, 0.999504 L of exterior oil in 72 h and 72,112,894.8 m³ of excavation. The oil total assumes the stated gas purity and retention of bulk oil. A wave overtopped the wall when the oil initially occupied 55% of the usable floor.
| Incident | Delivery duty, h | Lowest genuine flow, m³/h | Off-spec / tested portions | Oil after registered silent stop, m³ | Full incident |
|---|---|---|---|---|---|
| 01 · Source closing energy lost and conventional valves jammed | 0 | — | No sale | 0.000 | Open |
| 02 · Terminal closing energy lost and conventional valves jammed | 0 | — | No sale | 0.000 | Open |
| 03 · Source and terminal closing energy lost with jammed conventional valves | 0 | — | No sale | 0.000 | Open |
| 04 · Trigger inlets blocked with jammed conventional valves | 0 | — | No sale | 0.000 | Open |
| 05 · Pilots blocked with jammed conventional valves | 0 | — | No sale | 0.000 | Open |
| 06 · Sleeves torn with jammed conventional valves | 0 | — | No sale | 0.000 | Open |
| 07 · Sleeve closing force tripled with jammed conventional valves | 0 | — | No sale | 0.000 | Open |
| 08 · 5 mm² seat gaps with jammed conventional valves | 0 | — | No sale | 0.000 | Open |
| 09 · Three route boundaries lost | 72 | 400.118 | 0 / 2,672 | — | Open |
| 10 · Independent heat envelope penetrated | 72 | 400.118 | 0 / 2,672 | — | Open |
| 11 · Closed catch boundary lost | 0 | — | No sale | 0.000 | Open |
| 12 · Loaded collapse and outer-vault loss at 60 h | 60 | 400.118 | 0 / 2,224 | 0.000 | Open |
| 13 · 100 mm source-gas wall breach | 72 | 400.118 | 0 / 2,672 | — | Open |
| 14 · Gas heat transfer degraded | 72 | 400.118 | 0 / 2,672 | — | Open |
| 15 · Catch heat transfer reduced at 60 h | 60 | 400.118 | 0 / 2,224 | 0.000 | Open |
| 16 · Local pocket outer boundary lost | 72 | 400.118 | 0 / 2,672 | — | Open |
| 17 · Catch heat transfer lost at 60 h | 60 | 400.118 | 0 / 2,224 | 0.000 | Open |
| 18 · Enclosure gas starts at 86°C | 60 | 400.118 | 0 / 2,224 | 0.000 | Open |
| 19 · Catcher shield fully open | 60 | 400.118 | 0 / 2,224 | 0.000 | Open |
| 20 · All current quality evidence falsified | 72 | 400.118 | 0 / 2,672 | — | Open |
20 of 20 scheduled controller tests passed. The buyer inlet closes for six seconds each minute. The 40% flow target is assessed over each full minute. Hardware pressure and whole-site containment are separate checks.
Both buyers share a limit of 0.699 L in any rolling hour. With the six-second hold, the highest modeled water content of a sold portion was 0.6177%.
| Incident | Delivery duty, h | No hold, m³/h | Six-second hold, m³/h | Off-spec / tested with hold | Retained-key comparison, m³ | Full case |
|---|---|---|---|---|---|---|
| 01 · Source closing energy lost and conventional valves jammed | 0 | — | — | No sale | 1.131 | Open |
| 02 · Terminal closing energy lost and conventional valves jammed | 0 | — | — | No sale | 1.131 | Open |
| 03 · Source and terminal closing energy lost with jammed conventional valves | 0 | — | — | No sale | 1.131 | Open |
| 04 · Trigger inlets blocked with jammed conventional valves | 0 | — | — | No sale | 1.131 | Open |
| 05 · Pilots blocked with jammed conventional valves | 0 | — | — | No sale | 1.131 | Open |
| 06 · Sleeves torn with jammed conventional valves | 0 | — | — | No sale | 1.131 | Open |
| 07 · Sleeve closing force tripled with jammed conventional valves | 0 | — | — | No sale | 1.131 | Open |
| 08 · 5 mm² seat gaps with jammed conventional valves | 0 | — | — | No sale | 1.131 | Open |
| 09 · Three route boundaries lost | 72 | 400.432 | 400.118 | 0 / 2,672 | — | Open |
| 10 · Independent heat envelope penetrated | 72 | 400.432 | 400.118 | 0 / 2,672 | — | Open |
| 11 · Closed catch boundary lost | 0 | — | — | No sale | 1.131 | Open |
| 12 · Loaded collapse and outer-vault loss at 60 h | 60 | 400.432 | 400.118 | 0 / 2,224 | 1.171 | Open |
| 13 · 100 mm source-gas wall breach | 72 | 400.432 | 400.118 | 0 / 2,672 | — | Open |
| 14 · Gas heat transfer degraded | 72 | 400.432 | 400.118 | 0 / 2,672 | — | Open |
| 15 · Catch heat transfer reduced at 60 h | 60 | 400.432 | 400.118 | 0 / 2,224 | 1.171 | Open |
| 16 · Local pocket outer boundary lost | 72 | 400.432 | 400.118 | 0 / 2,672 | — | Open |
| 17 · Catch heat transfer lost at 60 h | 60 | 400.432 | 400.118 | 0 / 2,224 | 1.171 | Open |
| 18 · Enclosure gas starts at 86°C | 60 | 400.432 | 400.118 | 0 / 2,224 | 1.171 | Open |
| 19 · Catcher shield fully open | 60 | 400.432 | 400.118 | 0 / 2,224 | 1.171 | Open |
| 20 · All current quality evidence falsified | 72 | 400.432 | 400.118 | 0 / 2,672 | — | Open |
Each buyer has three finite 35 L seller cylinders. One empties, a second takes over as the first slows, and the third refills. Their flow overlaps for 120 ms. The gas buffer and pump stay at the original 10 m supply rise.
| Test or component | Simulation result |
|---|---|
| Permission to deliver | Two physical authorizations limit how many seller strokes can be outstanding. A receipt must come from the buyer-side displacement meter before a third stroke begins. The 200 ms rolling comparison can trip the common valve earlier. A separate spill flap can trip that same valve if oil is lost beyond the meter. Neither channel uses the buyer’s weight. |
| Service across the named cases | With eight piston pairs down per train, the lowest genuine full-minute rate was 400.044211 m³/h. All 175,680 required paired minutes across four settings passed. Six cases owe 72 hours of sale, five owe 60 hours and nine owe immediate isolation. A minute with the smallest margin has room for only 0.737 L of additional paired shortfall. |
| A repeatable stop | The programmed seat lead is 20 ms before the minute reset, with ±5 ms allowed. Stored oil stays behind blanked outlets. A new minute needs fresh displacement and current permission. The system reserves 3.4 hot L per buyer at startup. If the seat closes after the reset, some oil can enter a failed receiver. |
| Commercial load | Each of the three cylinders at each buyer undergoes about 146,880 cycles over a full 72 h service duty. The evidence includes refill and valve timing. Seal endurance, seating under pressure and installed performance remain untested. |
The simulated loss starts while both buyer inlets are flowing at 75 hot L/s. Falling weight contributes no useful signal. The same 10 m installation, cylinder timing and original buyer boundary apply to each of the following locally observable and hidden losses.
| Test or component | Simulation result |
|---|---|
| Diversion before the receiving pickup | The meter stops advancing and the common valve starts closing after 35 ms. The ideal crossing is 10.71 reference L. With the modeled trapped liquid and pipe response, 12.91 L crosses. All of it is counted as failed-buyer transfer. |
| Diversion after the pickup | The scale still reads healthy and the real inlet meter keeps moving. When the spill reaches the independent flap, the linkage trips after 0.135 s. Including the same hydraulic closing response, 27.77 reference L crosses before isolation. |
| Hidden internal path | A downstream diversion that also leaves the spill flap dry admits 1.437143 reference m³ through residual drive and closure. A continuing drive admitted 6.786017 m³ in a separate one-minute test. A motion signal can be truthful while actual receipt is zero. |
| Jammed common seat | When the buyer pickup stopped but the closing seat jammed, outstanding strokes admitted 117.23 reference L in the displacement test. Permitting a third unchecked stroke raised this to 183.76 L. Stored oil in connected branches has a separate release allowance. |
The resource account includes the 6.8 m curb, overhead gas paths, local gas buffers, two cylinder pads and separate dry spill links. The new machine and receiver pickup assume a mobile surface residue of 0.1 mg/m². Post-failure escape of the bulk liquid remains a separate requirement.
| Test or component | Simulation result |
|---|---|
| Delivered product | Across 27,152 sale portions, 0 exceeded the modeled limits. The worst results were 0.6180% water, 3.4937 mg/kg chloride and 0.02031% solids. Both trains together admit 0.665048 L in the worst rolling hour against 0.699 L. |
| Both trains through hour 72 | Conditional exterior oil totals 0.999523 L, leaving 0.477 mL for all further escape. Raising residue on the new machine and buyer pickup to 10 mg/m² gives 1.000257 L. Letting even one percent of the intercepted downstream late transfer reach outdoors adds 0.292 L. |
| Site and equipment | Counted excavation is 72,112,952.4 m³ against 72,200,000. It includes an additional 57.6 m³ of machine pads. The buyer pickup fits on the assumed existing support. Additional surveyed foundations, if required, need a separate debit. |
| What remains open | A sudden loss while accepting oil gives a finite transfer before the shutoff responds. An unobserved downstream path, a leaking seat, new foundation movement or loss of the independent roof can defeat containment. A complete 72-hour end-to-end pass has not been demonstrated for any of the twenty cases. |
The three-cylinder arrangement retains the original 10 m rise. A cold gas charge and the resistance of the buyer displacement meter both affect the pressure available to push oil into the receiving equipment.
| Test or component | Simulation result |
|---|---|
| Buffer and buyer pressure | At 156 kPa absolute cold fill, the minimum computed pressure above the maximum buyer load is 2.054 kPa. The assumed production unit combines the wet regulator and receiving measurement into one restriction. |
| Work for 72 hours | The required healthy schedule uses 7.3525 GJ per buyer of 7.4052 GJ available. Peak continuous pump and charge draw is 29.335 kW against 30 kW. A permanent peak load has a different energy demand. |
| Fill tolerance | Cold settings from 155.5 to 156.5 kPa meet the scheduled work, power and pressure checks. At 158 kPa the scheduled work rises to 7.4121 GJ and exceeds the allowance. A hot sealed charge also fails the registered upper-pressure study. |
| Qualification under load | A rig must measure refill, the overlap between strokes, seat closure under pressure and the pressure drop across the complete receiving assembly on a common clock. The simulation assumes separate positive displacement and a finite amount of trapped oil. |
At second 20, oil is already crossing both original buyer inlets. Both scales report normal receipt after failure. The model measures all new crossing from the instant of loss, including oil that moves while the protection is responding.
| Test or component | Simulation result |
|---|---|
| Two independent observations | A finite seller cylinder must finish its stroke and earn a new transfer from actual receiving displacement. A second, dry linkage trips from liquid entering the protected spill chute. Oil reached the failed buyer even if it was subsequently captured. |
| Matched flow and cutoff | The 250 L cylinders deliver 80 hot L/s per buyer immediately before loss. When diverted oil still moved the buyer inlet meter but reached each spill flap, 27.28 reference L crossed after loss. Holding full flow until both seats closed instead gives 33.37 L in the same test. |
| Hidden downstream leak | If both scale and inlet displacement remained credible and the oil bypassed the spill chutes, 1.478095 m³ crossed before the residual motion ended. The original collar under its own 75 L/s waveform admitted 1.442857 m³. Healthy-looking instrumentation cannot distinguish these two physical paths before their signals diverge. |
| Time and location of measurement | The inlet meter measures what crosses its own location. A rupture downstream can leave that measurement correct while genuine delivery is zero. The protected chute detects only oil that actually reaches it. A retained bulk inventory and a stable weighing frame provide different information. |
A moving route selector can warn the buyer inlet while its receiving path is still intact. A sudden internal rupture can occur with the selector stationary and the inlet already passing oil. The original buyer boundary stays in the same place in every comparison.
| Test or component | Simulation result |
|---|---|
| A genuine advance signal | With 20 mm of intact sealing travel and a 0.20 m/s change, the valve seated before the route separated. New oil after loss was 0.000000 m³. At 1 m/s, 5.938 L crossed. Without advance motion the same selector permits the whole ten-second tail. |
| A finite 35 L piston | With false weight and the independent receiver motion actually stopped, the rigid-line result was 4.848 L. Including a compliant 5 L local oil volume per buyer raised the result to 8.610 L. The hard stop alone cannot remove stored fluid momentum. |
| Why a different fault gives a different answer | During any interval when the healthy and failed receivers produce the same physical inputs, a controller in the same starting state gives the same output. Positive inlet flow over that interval transfers a positive volume into either receiver. False weight removes one possible distinction. A downstream diversion can remove the inlet-motion distinction too. |
| Commercial decision | A rig can establish a credible maximum late volume by recording true failure, inlet flow, seat position, caught oil and pressure on one clock. The evidence supports a bounded-release research prototype. It does not establish zero transfer for a sudden loss at an already-flowing inlet. |
Each seller cylinder both fills and empties through separate ports. The cycle pays for opening, closure, handoff and the next charge. The coupled hydraulic calculation checks local pressure, peak drive, stored energy and the volume available at each minute boundary.
| Test or component | Simulation result |
|---|---|
| 35 L with serial handoffs | With a full start and stop for every stroke, 75 hot L/s peak and a 20 ms handoff, the best gross paired rate is 325.868 m³/h. This misses 400 before any water or other delivery losses. The smaller after-loss figure for this arrangement cannot qualify service. |
| 250 L working option | At 80 hot L/s peak, a 20 ms handoff, 156 kPa initial buffer pressure and 8 m lift, the modeled due-minute minimum is 400.203 m³/h. Each buyer requires 27.437 kW and 7.123 GJ. The calculated pressure head remaining is 1.949 kPa. |
| Slower proof | Lengthening the 250 L cylinder handoff to 250 ms limits gross delivery to 394.862 m³/h. A larger permitted dose can help throughput but increases the inventory outstanding when the receiver stops acknowledging. |
| Operating exposure | Six named cases owe 72 hours of delivery, five owe 60 hours followed by isolation and nine owe immediate isolation. Every case owes 72 hours of containment. The flow figures are full-minute averages. The 20 scheduled controller results and the zero-crossing mid-flow challenge are distinct tests. |
A collector-mounted plate deflects under the momentum of diverted liquid. It releases a local shutoff without using buyer weight or software. The model includes flight time across the chute, spring and damper response, linkage travel and the valve’s flow curve.
| Test or component | Simulation result |
|---|---|
| Transport delay | On the original 75 L/s waveform, full capture trips the linkage in 0.135 s and admits 25.57 L. An extra second before oil reaches the flap raises this to 168.43 L. |
| Partial capture and nuisance trips | At 10% capture, the original 1.443 m³ crosses. In a separate healthy case, a 20 L/s water stream triggered the plate and interrupted valid service. The plate responds to force and requires a reliably segregated spill route. |
| Oil outside the plant | Every litre crossing the buyer is counted against isolation. Its exterior fate depends on the guard. On the original waveform, letting one thousandth of the diverted hot oil escape adds 26.85 mL outside. The routed containment design has less than half a millilitre of unallocated exterior allowance. |
| Limit of the closure model | The rated 80 ms closure assumes an intact close-coupled hydraulic buffer and a specified discharge curve. Trapped liquid can keep moving, a loaded seat can stall, and the assumed jet may miss the plate. Qualification requires simultaneous measurement of original-plane flow, seat motion and the separately collected spill. |
At each buyer the oil stays on the supply side of the existing inlet. A spring-loaded mechanical gate returns to its seat once a minute. Three independent conditions govern the next transfer.
| Test or component | Simulation result |
|---|---|
| Catch and fresh travel | The upstream catch must allow delivery. A resettable collar on the dry drive shaft then requires 0.640 reference m³ of fresh forward movement per buyer. Stored entitlement to earlier oil cannot open the gate. The final clutch requires continuing forward motion. |
| Matched hidden loss | The catch was silent in both runs. The six-second hold admitted 1.136270 m³ after loss. With the collar the same ten-second residual stroke admitted 0.000000 m³ across the same two inlets. Both gates began the test seated. |
| Opening allowance | The largest residual was 0.565501 reference m³ per buyer. After shaft and index error, the remaining rejection allowance was 29.37 L per buyer. A sustained stroke lets sale begin between 10.57 and 12.16 seconds. |
| Service to a healthy buyer | Eight piston pairs are down per train. All 80 paired replays met their schedules. The lowest required full-minute average was 400.117616 m³/h. All 27,152 sale portions met the grade model. Flow pauses each minute while the gate earns permission to open. |
The candidate retains the existing buyer inlet. Below it, a recessed floor and 6.8 m wall contain hot oil and water. Gas flows through upward takeoffs in two staggered rings. A conventional side pipe would be wider than the gap over the wall.
| Test or component | Simulation result |
|---|---|
| Waves after receiver loss | At hour 60, oil concentrated on 65% of the usable floor drove the wave to 6.007 m. The 6.8 m wall retained the liquid and preserved 0.793 m freeboard. At 55% initial coverage the wave overtopped the same wall after 1.145 s. Beyond that point outside spill depends on the surviving enclosure. |
| Gas pressure at the same load | At 24 working overhead passages the modeled peak was 170.499 kPa absolute, below the 171.325 kPa ceiling. With seven passages it reached 231.595 kPa. The roof takeoffs and independent supports must survive for either routing assumption to apply. |
| Combined resource limits | With the dry collar, recessed floor, taller curb, pulse cells and overhead gas paths, counted cut is 72,112,894.8 m³ and worst-hour water is 0.665047 L. The conditional exterior oil total is 0.999504 L, leaving 0.496 mL. The three new floor and gas-path fills each assume at most 0.005 ppmv condensables including measurement error. |
| Commercial and physical limits | The 16 m pipe extensions alone add 25,876 tonnes of double-shell steel. The oil budget covers 137,885 m² of cleaned surfaces. The required roof survival, minute seal leakage and independent support behavior remain unverified. The calculations do not yet support deployment. |
Each test below measures new reference-volume oil crossing the existing inlet after true loss. Oil already inside the failed buyer, movement inside the seller catch and oil reaching the exterior have separate accounts.
| Test or component | Simulation result |
|---|---|
| Loss with the valve open | At second 20 with ten seconds of residual motion, 1.442857 m³ crossed. Disabling the clutch increased this to 2.050541 m³. The clutch must stop flow within 0.10 s after shaft motion ends. |
| Timing sweep | Of 240 equally spaced quarter-second loss timings, 3 had zero transfer. The largest was 1.442857 m³. These are deterministic design tests and supply no probability of an incident. |
| Longer residual or continuing drive | Twelve seconds of residual motion from reset admitted 0.219163 m³. With the shaft continuing just as at a healthy buyer, 6.786017 m³ crossed in the first full minute. The controller needs an independent physical difference between those two states to distinguish them. |
| Inlet restriction | Reducing the available port from 75 to 70 L/s per buyer lowered genuine delivery to 375.731 m³/h. Only 9 of 20 schedules passed. |
A design option alternates two four-cubic-metre seller cylinders. It compares dispensed oil with an independently supported buyer’s mass gain. A deficit trips a second isolation device.
| Test or component | Simulation result |
|---|---|
| Independent loss measurement | At second 20 the signal tripped 1.50 s after loss. New oil across the failed inlet fell from 1.442857 to 0.235224 m³. Among 240 offsets, 3 transferred zero. The largest was 0.242777 m³. |
| A loss already in progress | When stored buyer oil began draining before the inlet opened, the second interlock detected the imbalance and admitted 0.000000 m³ of new oil. Oil already in the failed receiver remains an independent containment load. |
| False proof | With continuing drive, independent weighing limited first-minute crossing to 0.225815 m³. A spill carried by the same support admitted 6.786017 m³. A jam in the isolation device also defeated the trip. |
| Scale and feasibility | The modeled mass-change uncertainty is 20 kg at each endpoint, about 1.47 parts per million of the full buyer oil mass. Heat, piping thrust, waves and foundation motion act on the same load links. The additional seals, pressure and lot timing require a combined test before this option can earn mission credit. |
Two dry index cabinets share the existing mechanical drive. Each uses an allowance for a two-by-three-metre foundation. Exterior oil combines all rated sources at the specified fluid purity.
| Test or component | Simulation result |
|---|---|
| Water at both buyers | Rated ingress stays at 0.648383 L in the worst rolling hour. A single additional 60 mL release in that hour gives 0.708383 L and exceeds 0.699. |
| Oil reaching the exterior | The dry cabinets and rated plant sum to 0.996368 L over 72 h. Only 3.632 mL remains. At 10 ppm condensable oil in escaping receiver gas the result is 1.028072 L. The rated calculation uses 1 ppm. |
| Earthworks and drive | The two foundations add 9.36 m³, for 72,070,621.90 m³ against 72,200,000 m³. Shaft loading assumes a 2 Nm limit per dry index. Actuating the loaded heads requires a separate local energy source. |
| Sealing acceptance | A closed seat leaking 0.1 mL/min at each buyer would transfer 0.864 L in 72 h. The zero-crossing run assumes tight seats and excludes trapped liquid beyond them. Measure seat seepage and weigh the independent buyers and catches on the same clock. |
A hydraulic option places two sealed nitrogen buffer cells upstream of each buyer gate. It retains a 14 m wet transfer line and a separate 315 m dry witness shaft. One 10 m³ gas cell per buyer may be unavailable.
| Test or component | Simulation result |
|---|---|
| Drive and storage | At 10 m rise, one working cell can accommodate the modeled charge before the late opening. The two buyers each need their own drive, buffer and shutoff. A rising line, a partly obstructed buffer throat or a mistimed crossover changes the required hardware. |
| Operating envelope | At the late opening, the pressure model uses a 0.25 m pulsed column. At 10 m rise its demand is 28.22 kW per buyer. Upstream and local faces have different pressure ratings. The model assumes the diaphragm moves freely and the gate can carry differential pressure. |
| Equipment ledger | The buffer layout gives 0.648394 L/h and 0.996461 L outside under rated assumptions. Its foundations add 134.4 m³ to the comparison installation. Dry-cabinet pads and any mass-balance upgrade require their own allowances. |
| Failed controls | One 75 mL wash pocket raises ingress to 0.723394 L/h. A one-square-micrometre effective opening at each buyer that also leaks outside gives 1.000492 L over 72 h. |
A physical inlet option uses a two-plunger meter with 35 L pockets. An interlocked distributor meters the oil and prevents a charged upstream buffer from emptying through a stopped gate.
| Test or component | Simulation result |
|---|---|
| Pressure and stored work | At 10 m rise the late-opening trial needs 7.327 GJ per buyer against 7.405 GJ available. At 15 m the same equipment needs 8.538 GJ. A lower usable stored energy or higher lift can end service early. |
| Switching speed | The two plungers switch 102 times per minute. The average additional interruption allowance is 2.312 ms per switch. At 20 ms, gross mechanical capacity falls to 393.353 m³/h before water, losses or valve ramps. |
| Inventory and collection | After filling the four cells, meter and new passages, the remaining unallocated source stock is at least 6.078 m³ per buyer. With one intact 80 m³ catch per buyer and an open route to it, static collection headroom is 24.862 m³ each. |
| Construction test | Cycle the distributor through a full delivery day with one buffer isolated. Measure the valve position, buffer pressure, pump work, buyer volume and every crossover interruption on the same time base. The assumed millisecond handoff and zero-flow seal are consequential procurement requirements. |
Cases 12, 18 and 19 lose a loaded receiver after sixty hours of sale. Each train, pressure rule and gas-access assignment was replayed to the moment of loss. The protective wall and its gas system must accept the same simultaneous event.
| Test or component | Simulation result |
|---|---|
| Inventory actually present | Each buyer had received up to 12,214.83 reference m³ before loss. At the specified hot expansion this is 12,825.57 m³. The model admits 1,531.37 m³ of separate intercepted water in the first two seconds. Unused seller stock stays upstream. |
| First two seconds | With the drains blocked the local structure needs 14,356.94 m³ of usable capacity per buyer. Even allowing the maximum gravity drainage throughout both seconds leaves at least 10,940.98 m³ locally. The gas trial conservatively holds all existing liquid. |
| Independent retaining wall | A 5.5 m wall within the 5,000 m² buyer footprint reserves 0.75 m freeboard and 600 m³ for debris. With 80% usable area, pooled liquid reaches 3.96 m. At 60% the wall cannot hold the modeled load with the required freeboard. Its roof and supports need independent load paths after the original vault fails. |
| Gas and structure | After debiting wall, debris and obstructions from gas space, a flush floor and 30 open gas passages peak at 167.832 kPa against 171.325 kPa. With 24 passages, pressure peaks at 178.866 kPa. At 36 passages with thermal contact lost, pressure and gas temperature exceed their limits. These results depend on an intact new shell. |
These totals book the 5.5 m retaining wall, 1.20 m floor recess, dry collar pads and four pulse cells together. All three nitrogen charges for the new floor volume are counted in the same hour. Separate failures can still defeat these resource limits.
| Test or component | Simulation result |
|---|---|
| Earthwork and water | The combined counted cut is 72,104,260.9 m³, leaving 95,739.1 m³. Rated ingress including the pulse cells and two purge fills is 0.654478 L in the worst hour. Both buyers share the 0.699 L limit. |
| Exterior oil | With each new floor gas charge limited to 0.010 ppmv condensables including analyzer error, plus the separate pulse cell, cabinet and liner charges, the total is 0.998779 L in 72 h. Only 1.221 mL remains for uncharged loss. This needs independent containment of every wetted surface after the event. |
| Work and delivery | The depressed-floor option at a 10 m supply rise needs 7.3277 GJ per buyer including dry index work, against 7.4052 GJ available. The calculated minimum static delivery-head margin is 2.018 kPa. Splash, entrained gas and peak transient pressure can still affect delivery. |
| Alternative floor level | With a flush floor, full inventory adds about 9.41 kPa at the buyer. At 10 m rise the calculated hardware can accept only 4.762 kPa above the original buyer pressure. An 8 m rise with 162 kPa gas fill passes the separate pressure, power and work calculation; siting the upstream supply at that elevation needs its own construction account. |
The proposed retaining structure displaces part of the operating pool. Its normal oil level and remaining gas space change the pressure required for delivery and for isolation.
| Test or component | Simulation result |
|---|---|
| Flush floor | At hour 60 the reduced area adds 7.820 kPa at the existing nozzle. The pulse-cell option has only 2.018 kPa spare. These configurations cannot inherit each other’s passing delivery result. |
| Depressed floor | Lowering the floor by 1.20 m keeps the healthy transfer nozzle and gas roof at their existing elevations. The static nozzle head is 3.477 kPa lower at hour 60 and 1.886 kPa lower at full source inventory. An initially unsubmerged nozzle can entrain gas and change product quality. |
| Gas acceptance | With the lowered floor and 30 open gas passages, the hour-60 pulse peaks at 162.908 kPa. With 24 it reaches 172.112 kPa and exceeds the 171.325 kPa limit. Foundation survival, local pressure waves and exterior leakage still determine the full mission. |
| Resources | The lowered-floor study books 72,104,127 m³ of paired cut. Its additional dry gas raises rated water to 0.650411 L/h. Pulse-cell foundations and wet inventories belong to a separate equipment account. Containment also depends on sealing the whole perimeter through hour 72. |
The twenty cases include six recoverable incidents requiring 72 hours of sale, five requiring 60 hours followed by isolation and nine requiring immediate isolation. Each also owes 72 hours of containment.
| Test or component | Simulation result |
|---|---|
| Registered operating checks | The selected collar met flow, sale grade and registered stop requirements in 20 of 20. Each of the 56 scheduled stopping variants also passed with the upstream pickup silent at reset. |
| Receiver collapse | Cases 12, 18 and 19 require coupled retention of liquid and gas. At the design full load of 16,678 m³ per buyer, at least 13,262 m³ must still be held locally after two seconds, even at the maximum assumed gravity rate. The amount on hand at incident time is a separate input. |
| Ground and fluid conditions | At +0.2°C and 25 mm of relative movement the modeled hot-water head is 1.341248 kPa above saturation. At 40 mm, cases 12, 18 and 19 miss the 1.33 kPa gate. Water, condensable oil and installation movement all affect the result. |
| Whole-mission score | 0 of 20 demonstrated every requirement. Seventeen have no assigned loaded-receiver collapse. Those cases still require a compatible pressure, support and exterior-release model on the selected installation. A model pass and a physical qualification are separate decisions. |
Six exposed gas passages serve two buyers. Each passage has two independently chilled, dry steel condensers. The model loses one condenser at every passage. External strain pickups sense the sale pipe through intact metal. Four water-filled instrument connections are eliminated.
| Test or component | Simulation result |
|---|---|
| Water at the buyer | At 88°C saturated inlet air and 10 Pa inward pressure, the six passages can admit 7.74 m³ of air per hour. Steel initially at 2°C stays below 10.9°C at the cold surface through a two-hour assay plus 72 h of service. Condensate settles in blind collection pots. |
| Severe rain and dry gas | The trial charges a 200 mm storm collected over 16 times the opening area, up to 10% of that rain in fine mist, 0.2 ppmv water in all added gas, and one part per million of the 161,196 L falling into the outer galleries. The combined worst hour is 0.648383 L. Shortening every dry outlet bore from 100 mm to 1 mm gives 0.699865 L. |
| Limits of the weather test | Doubling the gallery rain fraction gives 0.821 L. If all the vent rain remains as fine mist the total rises to 2.127 L. A downstream wet opening can bypass every condenser. |
| Actual product | Assigning the complete 6.763 L over the full exposure to each sold portion in turn, all 27,152 portions met the modeled grade. The highest water fraction was 0.6175%. The final stock allowance is 6.262 m³ per buyer in the limiting schedule. |
A four-metre enclosed extension over each buyer connects continuously to 48 pressure-matched gas passages. Twelve receiving shafts stay below each buyer for gravity capture. Thirty-six blind gas vessels move above grade and supply no gravity storage for oil.
| Test or component | Simulation result |
|---|---|
| The first two seconds | All gas spaces start at 105.825 kPa absolute. At the assigned 0.15% flash by mass, a full buyer peaks at 150.905 kPa with one passage unavailable. With 18 unavailable it reaches 168.167 kPa. The pressure ceiling is 171.325 kPa. |
| Failed pressure tests | With 24 unavailable the peak is 177.821 kPa. With all passages blocked it is 292.298 kPa. With 1% flash, pressure reaches 411.518 kPa and gas reaches 132.50°C. At 30 available passages the passing flash limit is close to the assigned 0.15%; the crude's actual gas release is unmeasured. |
| Liquid remaining at the buyer | After one deep shaft is lost, static capacity exceeds the hot-liquid allowance by 2,903 m³ per buyer. Even with 4 m of gravity head, moving all the hot oil takes at least 8.87 s. The successful native gas pulse starts with oil still held at the buyer. |
| A second basin | A separate closed 110 m square basin retained liquid for 9 s with drains blocked. Its corners intersect the selected gas-vessel ring. It needs 27,650 m³ of separate excavation and a compatible gas path. This basin earns no credit in the selected installation. |
A closed outer gallery surrounds the entire short product line and both end connections at each buyer. Cooling plates inside each gallery absorb heat without adding a pressure penetration. The same pair of galleries is used for the leakage, temperature, water and excavation accounts.
| Test or component | Simulation result |
|---|---|
| Blocked drains | The loaded guard and line send 56.232 m³ into one gallery. With the drains blocked, hot rain and all modeled steam heat included, a two-second pulse peaks at 1006.28 kPa absolute and 120.00°C. Losing half the thin-plate area raises the temperature to 147.01°C. |
| Exterior oil through 72 hours | At an assumed 2 ng/L condensable oil in the installed auxiliary water, the conditional total is 0.996368 L. It includes both short liquid leaks, one part per million of the gallery flash and one part per million by mass of the main receiver gas that escapes in the 72 h comparison. Its 2,853 kg of escaping light hydrocarbon makes composition decisive. |
| Failed environmental controls | Ten parts per million of the escaping main-receiver hydrocarbon condensing or carrying oil gives 1.028072 L. Retaining the original 5 ng/L auxiliary fill gives 1.030034 L even at one part per million. A continuously supplied path through all barriers releases 67.148 m³ in the separate 72 h control. |
| Acceptance threshold | Once the other listed charges are paid, 2.031 parts per million by mass of the escaping main-receiver hydrocarbon would exhaust the litre. The actual condensable and aerosol share and the installed liquid purity have not been measured. The 120°C replenished-gas comparison also exceeds the receiver pressure ceiling before hour 72. |
The real buyer port and the original qualified stock are retained. The mechanical shaft permits flow when the buyer appears able to accept it. An internal loss can leave the port engaged and show the same movement as a healthy buyer.
| Test or component | Simulation result |
|---|---|
| Every required delivery minute | Both gas-access assignments and both pressure rules were run with eight piston pairs unavailable on each train. The minimum genuine oil rate is 400.432 m³/h after water, solids, returned oil and two short exterior losses. Six incidents require all 72 h of service, five require 60 h, and nine require immediate isolation. |
| An unannounced loss | Cases 9 and 12 admit the same first 10 s of crank movement after hour 60. If receipt pressure and engagement also match, waiting for a difference limits the healthy minute to 348 m³/h on the original inlet. Meeting 400 then requires at least 0.867 m³ during that shared interval. |
| Two physical cutoff trials | A larger inlet with a periodic cam meets all registered delivery schedules when loss coincides with a reset. Moving the loss ten seconds into the cycle delivers 2.262 m³ late. A toothed displacement lock limits late delivery to 6 L when actual receipt motion stops. An internal leak that keeps the receipt piston moving defeats that limit. |
| Where run-on belongs | The registered stop requires zero new oil crossing into the failed buyer. Motion can continue into a finite seller-owned catch on the supply side. The simulation must show which route takes the oil. Crediting a sale or sending oil through a failed buyer cannot be corrected by relabeling it after the event. |
Relocating the blind gas storage reduces excavation while increasing the load on surface foundations. Pressure at the hot-water reference changes when the new foundations move relative to it.
| Test or component | Simulation result |
|---|---|
| Counted works | Across both trains and both buyers, the selected layout uses 72,070,613 m³ against 72,200,000 m³. Remaining allowance is 129,387 m³. It includes the closed gallery, cooling supports and all twelve condenser foundations. |
| Surface demand | The gas installation reserves 8.26 additional hectares of surface plot. The design identifies 57,248 tonnes of additional gas-system steel. The dry condenser stores add 720 tonnes of steel. Land, foundation motion and access remain material design constraints. |
| Hot-water pressure | The native floor is 2.099 kPa above saturation. A 0.2°C hotter film plus 25 mm of additional relative elevation leaves 1.341248 kPa, above 1.33 in 20 of 20 cases. With 40 mm the minimum falls to 1.194149 kPa and 3 cases miss. |
| What a site test must establish | Measure the pressure and level at the hot-water reference under the installed loads. Check the worst local elevation change against the thermal trial. The amount of excavated rock alone cannot establish that the water margin survives. |
A welded outer roof sheds water before it enters the gallery around the oil line. It has its own supports and four free discharge edges. The oil pipe and the gallery wall remain intact. This hydraulic trial compares a design option with the selected receiver.
| Test or component | Simulation result |
|---|---|
| Storm and openings | Each roof collects runoff from 443.3 m² at 200 mm in one hour. The modeled seam openings on each roof together have the area of a single 0.15 mm diameter hole. Every drop passing those openings is charged to the product. The calculation also retains 0.476 L from the other water sources. |
| Two working discharge edges | The total is 0.626802 L across both buyers. With one edge open it is 0.654420 L. Both are within 0.699 L. The one-edge case can accommodate an equivalent seam opening only up to 0.168 mm per roof. |
| Blocked edges or direct spray | All edges blocked gives 0.758700 L. One edge open with a 0.30 mm defect gives 1.189736 L. Adding 0.25 L of direct spray below the roof to the two-edge trial gives 0.876802 L. Each exceeds the limit. |
| What the trial covers | The simulation screens rain drainage and leakage over one hour. It leaves wind-driven entry, roof deflection, support loading, exterior residues and interference with the gas passages open. The selected excavation and 72-hour delivery figures exclude this optional roof. |
Oil movement, seller-side capture, crossing into the buyer and exterior release are four separate measurements. They can give different answers in the same shutdown.
| Test or component | Simulation result |
|---|---|
| Prescribed stop replay | The 56 stop comparisons recorded zero new buyer oil and up to 1.160 m³ in the seller-side catch. The underlying simulation switches routes when the event occurs. The physical equipment must direct oil to that same destination. |
| Port already blanked | A physical blank ahead of the failed port put 1.229 m³ of expanded liquid into the upstream catch and zero across the buyer boundary. This case assumes the blank is in place before loss and the catch is connected. |
| Hidden internal loss | A disappearing receipt signal with a finite spring closure admitted 11.40 L at reference conditions. If an internal leak kept the return moving, 1.171 m³ crossed into the failed buyer. The intact downstream enclosure retained the oil. A one-percent bypass of the guard would add 12.29 L outside. |
| An upstream trip signal | All 28 stopping train histories accrued over one litre of missed flow at the upstream station by five seconds. The enlarged buyer inlet leaves at most 8.29 s to transmit this signal after allowing for local closure. A hidden loss can preserve upstream flow. Signal travel and available pressure at the higher peak rate still need a combined test. |
A separate 110 m square basin receives liquid while the gas vessels move outward. Greater gas space reduces pressure, but it also puts more water-bearing gas next to the product.
| Test or component | Simulation result |
|---|---|
| Plan and earthwork | Shifting the ring clears the basin corners by 0.22 m in plan. The 16 m basin layout uses 72,127,710 m³ of counted excavation and leaves 72,290 m³. Construction tolerances, settlement and piping clearance remain open. |
| Short pulse | At least 13,262 m³ per buyer needs local storage after two seconds even at the upper gravity drain rate. The sealed 16 m basin reaches 214.95 kPa absolute and 167.41°C at full access. The limits are 171.325 kPa and 120°C. |
| Gas space and water | The closed equilibrium model needs 290,619 m³ of readily accessible gas space per buyer to meet both endpoints. With all that space reachable, water is 0.756 L at 0.2 ppmv moisture in the added gas and 0.659 L at 0.02 ppmv. |
| Partial access | If a quarter of the gas space can participate, the calculated total height rises to 182 m. Even the dry-fill endpoint reaches exactly 120°C. A larger structure, access to the gas within two seconds and its exterior containment through hour 72 remain unverified. The earthwork estimate above applies only to the 16 m option. |
The buyer valve closes at each minute boundary. A volume pickup in the upstream catch trips at one litre and latches shut. A six-second hold gives that signal time to reach the valve before it can open. The buyer needs a larger inlet to deliver the accumulated oil in the rest of the minute.
| Test or component | Simulation result |
|---|---|
| Input to the controller | All 28 stopping train histories exceeded one litre of catch inflow by five seconds. The cumulative catch inflow stayed at zero throughout all 22 train histories with service due. The comparison uses physical volume as its input. No incident number is sent to the controller. |
| Time to isolate | The compared pilot line is 300 m long. At 700 m/s the model allows 0.429 s for transmission and 0.047 s for local closure. The six-second hold leaves about 0.52 s after a five-second detection. These times assume that the pilot remains connected and the valve moves under load. |
| Prescribed duty | The controller met the flow, stop and lot checks in 20 of 20 registered cases. The lowest qualifying rate was 400.118 m³/h. The largest new transfer across a required stop was 0.000000 m³ at reference conditions. The screen charged sale-side losses and preserved the finite stock. |
| Outside the registered timing | The opening rule responds to fluid arriving at the upstream catch. A hidden loss confined to the buyer can keep this catch dry. A slow signal can also arrive after the valve opens. A whole-case claim requires the buyer, inlet drive, water barrier, modified foundations and exterior capture to work together through hour 72. |
Reference installation. 9 of 20 registered missions pass end to end. All eleven delivery cases meet their hydraulic schedules. Their 44 m³ lots still lack a verified limit on water entering during the two-hour assay, subsequent storage and transfer to the buyer. 20/20 support checks and 20/20 exterior-oil checks passed. With 73% gas access on either train, the lowest water margin is 2.099 kPa. The exterior oil allowance remaining is 1.280 mL across both trains.
Equipment comparison
The wet drive ends at a blind wall. A solid shaft transmits movement to a pump next to the buyer. Four sealed gauge capsules contain a finite amount of water even when all four fail.
Both buyers share a limit of 0.699 L in any rolling hour. The upper bound for an instantaneous burst is undetermined. The case selector below sets the operating duty.
| Case | Required delivery | Full receiver outcome |
|---|---|---|
| 01 | Immediate isolation | Open |
| 02 | Immediate isolation | Open |
| 03 | Immediate isolation | Open |
| 04 | Immediate isolation | Open |
| 05 | Immediate isolation | Open |
| 06 | Immediate isolation | Open |
| 07 | Immediate isolation | Open |
| 08 | Immediate isolation | Open |
| 09 | 72 hours | Open |
| 10 | 72 hours | Open |
| 11 | Immediate isolation | Open |
| 12 | 60 hours | Open |
| 13 | 72 hours | Open |
| 14 | 72 hours | Open |
| 15 | 60 hours | Open |
| 16 | 72 hours | Open |
| 17 | 60 hours | Open |
| 18 | 60 hours | Open |
| 19 | 60 hours | Open |
| 20 | 72 hours | Open |
These controls test excursions beyond the stated design assumptions. Each result identifies the measurement and where it applies.
Eight native runs cover both gas-access orientations and two pressure-control rules. Values are simulated. The installation-wide grade debit is shown separately in the pressure trial.
| Train | Gas access A/B | Pressure rule | Oil °C | Nitrogen °C | Water margin kPa | Stock at 72 h, m³ |
|---|
The wet drive ends at a blind pressure wall. Across 315 m, a solid shaft conveys piston movement through magnetic couplings. A weight at the buyer supplies the pumping work. Only a short, primed local pipe carries sale oil. Four sealed pressure gauges have no connection to a water supply.
| Component | Receiver model |
|---|---|
| Finite gauge inventory | Even if all four metal gauge capsules rupture together, their dimensions limit external water to 0.113 L across both buyers. The model also condenses the entire original and added nitrogen moisture charge, 0.170 L, into that hour. |
| Gas pressure through hour 72 | Three weighted holders per buyer begin with 1,300 extra m³ each. Two surviving holders can travel 3.8 m. Across 691,200 train-minutes the minimum cold gas reserve was 553 m³. A common wet pipe around the solid shaft would defeat the separation. |
| Rain and condensation | Dry weather gives 0.299 L in the worst rolling hour. The eight-times rain test gives 0.555 L; sixteen times gives 0.811 L. The limit is 0.699 L across both buyers in any rolling hour. The study assigns no instantaneous flow bound to a ruptured capsule. |
| Retained construction water | The eight-times rain trial leaves 144.2 mL for all other water that reaches the oil that hour. In a 72-hour preinstallation drying comparison, a 2 mm pool with a 10% open escape area dries; at 5% opening the modeled residue is 6.05 L. A closed pocket can release its entire contents later. |
Two solid timing shafts transfer a displacement signal. Two independent falling weights per buyer are charged before the incident. With one weight unavailable, the surviving weight drives the original authenticated stock through the actual buyer port.
| Component | Receiver model |
|---|---|
| Minimum genuine oil | Eight pairs are unavailable on each train. The 1.0048 drive ratio delivers at least 400.438 m³/h after charging the whole rain-hour ingress to one minute, the fluid assay tolerances, and oil seeping back into the guard. The working weight supplies 7.405 GJ against 6.439 GJ in the drive screen. |
| Original stock and quality | Both the line prime and 33.535 m³ of make-up per buyer come from original stock. With the articulated extension charged, 6.262 m³ remains in the limiting buyer. The one-hour storm gave 0.5296% water at most over 27,152 full or partial transfers. An independently primed portion exposed to an unaccounted 20 L exceeded the 1% specification. |
| Physical disconnect | The two flush heads close in 46.6 ms. With 0.20 m of retained travel, the 2.5 m/s pull leaves 33.4 ms and zero new sale in that separation trial. One closed catch per buyer can be lost. |
| Hidden endpoint loss | A loss inside the receiver can leave the port engaged. The shaft can then move 1.171 m³ across the two buyer ports after the required stop. Its motion alone cannot distinguish a buyer still accepting oil from a hidden loss. |
The candidate adds covered wet collectors, separate gas holders, double-shell catcher shafts, and closed flash-gas vessels. The total-loss test charges the exposed oil, displaced nitrogen and flash gas to the same receiving installation.
| Component | Receiver model |
|---|---|
| Construction | Identified excavation is 72,194,956 m³ across both buyers and both trains. That leaves 5,044 m³ for unbooked foundations, cooling hardware and site preparation. Extra rock removal can exceed the limit. |
| Exterior oil | Original oil sources, receiver and line surfaces, the new holder rims, and both sets of cooling plates total 0.999889 L before any new bulk oil or entrained vapor escapes. Only 0.111 mL remains. Oil left on a service-wetted pipe must be captured separately. |
| Two-second flash | With 3.4 million m² of dry plates per buyer, the two-region model at the specified heat transfer coefficient and insulation value of 0.025 W/m²K starts the plates at 44.3°C after 72 hours. Its 1% flash peaks at 131.0 kPa absolute and 120.0°C. With insulation at 0.10 W/m²K the gas reaches 147.1°C. |
| What prevents acceptance | The first small gas space at the buyer can heat and pressurize before the rest of the bank is accessible. The first seconds, the oil-wet exterior paths and hidden losses with the receiving key still engaged require evidence on this installation. |
The first gas space available at a loaded buyer is only 1,253 m³. The pressure in that space and oil crossing the outside of the transfer pipe determine whether the larger receiving banks can protect the installation.
| Component | Receiver model |
|---|---|
| Pressure in the first gas space | At full load, a two-second release with 0.15% flash by mass reaches 118.874 kPa absolute and 101.75°C when the modeled ports begin opening at 0.10 s. The limits are 171.325 kPa absolute and 120°C. At 0.30 s, pressure reaches 288.112 kPa. The measured opening response under load is unknown. |
| Transfer pipe jacket | One isolated compartment holds 42.10 m³. It contains the modeled line inventory with 6% flash at 970.7 kPa absolute against a 1,200 kPa limit. If the whole dock guard empties into it, the minimum space needed is 59.37 m³ even before flash. |
| Oil escaping both barriers | When the modeled oil path continues through both walls, 6.03 mL escapes before closure. The nominal oil headroom is only 0.111 mL, before the optional jacket contributes another 0.0006 mL of residue. On these inputs the one-litre limit is exceeded. |
| Evidence required | A full receiver test must record pressure at the first gas space and the opening delay, weigh everything crossing the exterior boundary, and independently measure what reaches a disabled endpoint while its transfer joint remains engaged. |
Each physical train was run once with 73% of its gas storage accessible and once with 100%. Two pressure-control rules were replayed separately for each assignment. The same two native incident records supplied the train histories.
| Test | Simulated result |
|---|---|
| Train A at 73%, train B at 100% | All 40 thermal states satisfied their limits. The pair supplied at least 403.492 m³/h across 87,840 due minutes, counting both pressure rules. No new volume crossed after a required stop. |
| Train A at 100%, train B at 73% | All 40 thermal states passed. The independently replayed minimum was 403.492 m³/h with zero missed due minutes. Both assignments included eight unavailable piston pairs per train. |
| Independent heat calculation | Refining the time step from 10 s to 2.5 s gave a peak of 116.068°C and 136.258 kPa absolute. The limits are 120°C and 150 kPa. The initial liner is 87°C and the outer boundary is held at 120°C. |
| Water at the exposed surface | The 16 mm comparison grid gives 1.34757 kPa in each orientation. With 8 mm supports, case 18 on the fully accessible train governs at 2.09922 kPa. The calculation combines the worst motions and pressure disturbances. |
The selected grid supports the dry side of a 96 mm pressure face. Its shorter unsupported span reduces motion transmitted to the exposed water. Redistributing the same steel keeps the modeled gas space, liquid volume and excavation constant.
| Test | Simulated result |
|---|---|
| Water pressure in the rated design | Free-surface margin rises from 1.348 to 2.099 kPa. The confined crown gives 2.382 kPa. All 20 cases pass at the specified air pressure, water-film temperature and backing stiffness. |
| Construction and exterior oil | The model needs 4.387 billion support contacts per train, with 0.298 mm net webs. The added 4,973,317 m² of metal is charged at 0.10 µg/m², adding 0.614 mL to the paired exterior total. |
| Common loss of support | When four adjacent spans bridge the missing contacts, free-surface margin falls to 0.898 kPa against 1.330 kPa required. The peak stress-to-allowable ratio is 2.706. All twenty fail this comparison. |
| Temperature and weather | A further 0.2°C rise leaves 1.586 kPa across all 20 cases. A 0.5°C rise or a separate 2.0 kPa drop in atmospheric pressure defeats cases 12, 18 and 19. At the rated temperature the model needs at least 100.556 kPa ambient. |
| Web thinning | A further 0.15 mm of metal loss leaves 1.935 kPa of water margin. The web buckles at a stress-to-allowable ratio of 1.246, failing the structural check in all twenty cases. |
The original water limit is 1% by volume in each assessed 44 m³ lot. A litre taken at the outlet can reveal a concentrated leak. This illustration compares local exposure with the result for a separate five-minute batch.
| Test | Simulated result |
|---|---|
| Five-minute batch transfer | Four 20 m³ cells per buyer, one unavailable. With immediate mixing and no retained water, all 44 flow and pressure combinations delivered at least 401.323 m³/h. The highest batch water content was 0.613%. |
| Same readings, different product | Both histories carry 70.670 L of water in the batch. Uniform mixing gives 0.420% locally. Concentrating 59.55 mL of incoming water into one litre gives 6.350%. Both histories report the same assay. |
| Retained water and queued oil | A delayed 100 L water release gives 1.0123% even after complete batch mixing. If its release mechanism keeps running after hour 60, the queue can deliver another 67.249 m³ across both buyers. |
| Oil-wet membrane | Of 180 ideal pore, viscosity and fouling combinations, 111 supported flow and water rejection at 500 Pa. The strongest ideal water barrier was 0.300 MPa. None held the direct 3.520 MPa water differential. A leak downstream also bypasses the membrane. |
Two charged circuits feed previously qualified product oil between the sale passage and its external water guard. A pressure advantage can keep water out while the fluid entering the sale passage still has the commissioned composition.
| Test | Simulated result |
|---|---|
| One working supply | With one circuit unavailable and 100 mm² of effective supply opening, the simulated junction holds 19.601 MPa against 16 MPa of water. No reverse water enters in this comparison. The surviving local circuit needs 67.85 L over 72 hours, including the oil used before the trip. Deducting guard oil from delivery gives 400.178 m³/h of original hydrocarbon in the favorable comparison. |
| Restricted supply at a wet joint | With only 2.5 mm² of effective feed, 80.45 mL enters at one buyer during the initial pulse. A one-litre sample then contains 8.431% water. Assessing the original 44 m³ lot requires accounting for all water reaching that lot. |
| Inventory and environmental exposure | The design needs 43,612 m³ of separately counted product oil to fill the protective system. A direct opening releases 20.43 mL during initial closure. Added to the selected installation this reaches 1.019148 L before any further losses. |
| Acceptance evidence | A positive result requires the minimum open supply area at the actual wet joint, independent pressure during closure, and capture at every outer exit. The coupon and storage calculations do not qualify the final buyer or provide new end-to-end passes. |
Some reserve oil finishes its two-hour assay before the incident, then waits for its turn to move. These trials follow the actual time each lot leaves storage and enters the customer. Each uses the same original oil and debits for retained water, gas moisture and upstream transfer.
| Test | Simulated result |
|---|---|
| The final partial delivery | In case 9, train A sells 16.172 m³ at the end of hour 72. After charging 20 L of retained water and the other modeled sources, only 50.35 L of additional water can reach that portion. |
| A leak that continues during storage | At the modeled differential pressure the limiting allowance is 0.699 L/h over 72 hours. An effective area of 0.003 mm² yields 0.974% water at worst. All 11 operating groups meet the chemistry limits at that area. |
| Six full-duration services miss | At 0.004 mm², 48 portions exceed the limit. Only the five groups ending service at hour 60 still meet it. At 0.10 mm², 23,896 of 27,064 portions fail and the worst is 10.149% water. |
| What decides the outcome | The effective areas represent flow at one specified pressure. They are sensitivity inputs. To close the eleven delivery cases, the model needs an independently supported upper bound on all water reaching the same sold portion and a pressure history that still delivers 400 m³/h. The customer retrofit must also retain the registered exterior and total-loss performance. |
Each real buyer receives the oil into its original tank. The design drains its water-backed equipment before service and collects the displaced dry nitrogen in weighted gas holders. The oil still crosses the buyer’s original inlet. The final partial delivery is scored on the amount sold.
| Test | Simulated result |
|---|---|
| Isolated lot and measured water | Across 27,064 replayed full and partial deliveries, 20 L of trapped water and a continuous equivalent opening of 0.10 mm² produced at most 0.964% water. All 11 operating cases met the modeled chemistry limits under this condition. |
| What still fails | A single 100 L pocket of retained wash water caused 48 portions to fail. Only 5 of 11 operating cases then met the chemistry limits. With the original wet opening under liquid-column pressure, 27,064 portions failed. An empty backing circuit still leaves other sources of water. |
| Acceptance at the buyer | The smallest sold portion was 16.172 m³. Its unassigned water budget, after charging moisture from both gas inventories, is 70.35 L. The collection test must include all trapped and newly admitted water through the two-hour hold and up to 14 minutes of discharge. |
| Total loss at the converted receiver | The air-filled enclosed catcher requires 157,335 m³ per buyer. A fully excavated pair exceeds the remaining cut by 12,688 m³ before access or lining. Gas storage, tank loads, stop behavior and exterior oil would need to pass on the converted installation. |
| Mild vacuum at startup | At 90 kPa absolute, each enclosed catcher needs 106,741 m³. Both fit with a 20% construction allowance and 45,804 m³ remaining. The shell must carry 11.325 kPa inward initially, local ground loads and 70 kPa outward in the hot-loss calculation. Vacuum retention and external water ingress remain open. |
A physical 44 m³ cell holds the original reserve for a two-hour quality check. Three one-litre samples represent that cell. Product identity and downstream additions must be traced to the actual buyer for each transfer, including the last partial lot.
| Test | Simulated result |
|---|---|
| Original reserve | Each buyer has 334 full indexed lots in the stock calculation. Case 20 drives the pistons with off-spec incoming oil. The sale side must contain only its authenticated original reserve and bounded additions. False samples and references cannot verify a broken separation. |
| Water, chloride and sediment | Across 27,064 sold portions in 11 operating cases, a two-second high-pressure exposure followed by density head yielded maxima of 0.927 vol% water, 2.982 mg/kg organic chloride and 0.0209 mass% solids. The limits are 1%, 5 mg/kg and 0.05%. |
| Water while the cell waits | With the wet connection open during the two-hour hold, maximum water rose to 8.242%. Sustained high pressure during discharge alone reached 9.620%. All 11 operating cases fail these alternatives. |
| A later slug reaches one lot | When 300 L of trapped water displaces oil containing 0.50% water in one 44 m³ lot, its mean rises to 1.178%. A tank average after the sale cannot certify what crossed the custody boundary earlier. |
The actual receiver begins with 16,400 m³ of backing water behind a diaphragm. Its transfer into sold oil is a separate possible source from the upstream guard leaks. The common-tear area and pressure across it remain unbounded in the selected installation.
| Test | Simulated result |
|---|---|
| Six cubic metres left in each tank | Six m³ of the original reserve at each actual buyer limits whole-tank water to 0.840% from the modeled field leaks alone. The starting charge earns zero delivery credit. This alternative needs a prospectively agreed tank assessment and independent protection from the receiver's backing water. |
| A subdivided water receiver | With 6 million independent water circuits per buyer, fully emptying 32 circuits releases 112.81 L. The model adds 61.94 L of new field water per swept lot. Starting at 0.50%, each 44 m³ lot tolerates 221.11 L of water substitution. |
| An obstructed return or a common tear | Only 46.36 L of additional, previously trapped water fits in that lot. A common connection between more circuits defeats the tested limit. The exterior-oil subtotal is already 0.999891 L before the remaining equipment is charged. |
| What the present register credits | All nine immediate-isolation cases meet their assigned gates. The six 72-hour recoveries and five delayed shutdowns still require a proven transfer of on-spec product at the actual buyer. These separate receiver trials add zero complete cases. |
Both devices use the original prequalified inventory once. Each needs a positive cutoff at the actual buyer when delivery must stop.
| Test | Simulated result |
|---|---|
| Finite starting stroke | Two 25 L spring-loaded cylinders per buyer were charged with 100 L across the site. With one unavailable per buyer, the surviving cylinder meters 19 L. After a two-second pressure pulse, all 44 operating comparisons delivered at least 400.366 m³/h of genuine original hydrocarbon. |
| Sustained inlet or jammed discharge | The same finite stroke gives only 367.392 m³/h under sustained high pressure. If one active discharge jams open on each side after shutdown, 50 L can cross the closed boundary. A separate physical disconnect is essential. |
| Matched cassette weights | A proposed mechanical comparator reweighs the actual sealed cargo before release. With oil density at most 900 kg/m³, the charged whole-batch bound is 0.902% water. At 920 kg/m³ it is 1.060%. The tighter case requires temperature matching within 0.05 K. |
| What could defeat the weighing test | An unobserved 100 L return after testing lifts the whole-batch water bound to 1.376%. Weighing cannot resolve dissolved organic chloride independently. Isolation, contamination identity, retained water and the loaded receiver stop require physical qualification. |
| Case | Registered event | Custody requirement | Rated exterior bound | Reference mission |
|---|---|---|---|---|
| 01 | Source closing energy lost and conventional valves jammed | Stop at onset | 0.9981 L | Pass |
| 02 | Terminal closing energy lost and conventional valves jammed | Stop at onset | 0.9981 L | Pass |
| 03 | Source and terminal closing energy lost with jammed conventional valves | Stop at onset | 0.9981 L | Pass |
| 04 | Trigger inlets blocked with jammed conventional valves | Stop at onset | 0.9981 L | Pass |
| 05 | Pilots blocked with jammed conventional valves | Stop at onset | 0.9981 L | Pass |
| 06 | Sleeves torn with jammed conventional valves | Stop at onset | 0.9981 L | Pass |
| 07 | Sleeve closing force tripled with jammed conventional valves | Stop at onset | 0.9981 L | Pass |
| 08 | 5 mm² seat gaps with jammed conventional valves | Stop at onset | 0.9981 L | Pass |
| 09 | Three route boundaries lost | Flow for 72 h | 0.9981 L | Open |
| 10 | Independent heat envelope penetrated | Flow for 72 h | 0.9981 L | Open |
| 11 | Closed catch boundary lost | Stop at onset | 0.9981 L | Pass |
| 12 | Loaded collapse and outer-vault loss at 60 h | Flow to hour 60 | 0.9987 L | Open |
| 13 | 100 mm source-gas wall breach | Flow for 72 h | 0.9981 L | Open |
| 14 | Gas heat transfer degraded | Flow for 72 h | 0.9981 L | Open |
| 15 | Catch heat transfer reduced at 60 h | Flow to hour 60 | 0.9981 L | Open |
| 16 | Local pocket outer boundary lost | Flow for 72 h | 0.9981 L | Open |
| 17 | Catch heat transfer lost at 60 h | Flow to hour 60 | 0.9981 L | Open |
| 18 | Enclosure gas starts at 86°C | Flow to hour 60 | 0.9987 L | Open |
| 19 | Catcher shield fully open | Flow to hour 60 | 0.9987 L | Open |
| 20 | All current quality evidence falsified | Flow for 72 h | 0.9981 L | Open |
The original 44 m³ lot has a 1% water limit. A one-litre sample can reveal an opening. A delayed 300 L water release makes the entire lot 1.178% water. Each design below has its own pressure, inventory and containment assumptions.
| Configuration | Result |
|---|---|
| Move the existing assayed stock | Moving 14,700 m³ per train to the customer and deducting the entire terminal nitrogen pulse gives 400.661 m³/h minimum. All 20 material and stop schedules pass. No additional sale stock is credited. |
| Low-pressure customer connection | A flywheel and a protected transfer head give 400.175 m³/h in the forward-flow test. A pressure wave at the actual inlet can interrupt delivery. The native customer requires positive liquid pressure throughout the event. |
| New receiver on the surface | The full-pulse support works and new water and gas would add at least 0.008638 L before all additional customer equipment. One compartment can retain the tested dirty gas and clean carrier at 3.694 MPa. |
| Buried receiver and rock supports | A 7 m internal radius and three entrances require 666,729 m³ for the two customers before the complete pressure arch and guard fittings. The 4 m gallery and 1,413 physical drives per train leave 69,976 m³ for those additions. |
| Gas barriers at working fittings | Across the straight panel, one live gas jacket gives 102.56 mm of gas along the limiting cut. A service intersection changes its direction twice. The flat panel alone cannot establish the gas length around an elbow, a hatch or a regulator. |
| Closed water inventory in a support | A sealed measured charge and a hollow rod give a 68.013 MPa high-side pressure. After new nitrogen and metal are charged, the paired oil reduction in this separate component comparison is 0.001366 L. The selected installation still counts the gross expansion housing. |
| Reinforced buried receiver | Distributed anchors and a steel pressure arch carry the modeled ground loads. The service head and pressure gear raise the extra local works to 62,954 m³ on top of the two main receivers. A closed curved cap provides 204 mm of gas. A working regulator and the adjoining loaded ring each need a continuous verified boundary. |
| Divide the actual buyer pool | With 32 of 768 pockets unavailable, 14 mm partitions displace 175.3 m³. The remaining water film is 0.0848 m against the 0.10 m minimum. Usable water-channel area is 46.25 m² against 48 m². |
| Rupture of the guard supply | Rupturing the entire 3,100 m³ nitrogen source at 38 MPa gives 37.617 MPa in its enclosure. The remaining guard holds 9.30 MPa. The four-metre gallery is short of 25,365 m³ even before excavation for portal frames. |
| Reduced gallery height and drive count | The 3.5 m route and 1,595 drives per train pass all 80 thermal states, peaking at 117.09°C. They leave 130,647 m³ after the main buyer bores. A complete expanded pressure vessel must fit this volume and the remaining oil budget. |
| Seam-free diagnostic body | A straight replacement body removes the drilled diagnostic branch. The simulation adds an independent ninth fault in every pickup. The unmodified shared guard cannot protect all 1,152 fault regions; the selected installation retains the original 0.27648 L allowance for its 128 blind instruments. |
| Rapid release into added expansion space | A 17,378 m³ enclosure settles at 8.859 MPa. In a 560-cell calculation the pressure at the wall peaks at 10.404 MPa after 94.2 ms. The surviving guard holds 9.30 MPa. The larger shell and all its initial fluid also count toward the oil and earthwork limits. |
| Raise the real buyer operating level | An additional 5,250 m³ of water per buyer gives 0.211 m of water film with 32 cells lost. The compartment can hold the scheduled oil. A water front at the actual wet joint requires 64.18 mm of uninterrupted opposing flow in this model. A 45° defect gives only 5.66 mm in one span. Guarded water transfer remains unbounded. |
| Smallest independent diagnostic retrofit | Two full gas supplies rupturing at one new diagnostic body can be contained at 3.543 MPa in the static calculation. Each modified site adds more than 24,000 tonnes, and the rapid response at its own foundation remains unproven. The case register claims zero oil savings from removing these branches. |
| Pressure space, supports and excavation together | The expanded-vessel study compared 1,200 geometry and support combinations. With 35% extra gas space, the highest wall pressure is 8.654 MPa against 9.30 MPa and the rock checks pass. The installation exceeds the excavation limit by 17,636 m³ before the raised buyer works. The minimum paired oil charge is 1.001601 L. |