What crossed into the failed buyer?
With the standby receiving port, the 3 s switch sustained a modeled lower bound of 400.030 m³/h over 72 hours. At 5 s that lower bound fell to 393.665 m³/h. The single failed buyer admitted 6.042 L with the supplementary feed included.
The measurement plane is the original wet inlet. A failed buyer retained zero saleable oil in these tests. Measuring oil in the catch or reading the buyer’s scales cannot establish how much crossed the inlet or how much escaped the site.
| Modeled condition | Result | Meaning |
|---|---|---|
| False weights alone, original shutoff | 1,442.857 L | Paired crossing after loss at second 80. The original interlock continued to admit oil. |
| False weights, working liquid witness | 11.676 L | Paired crossing. A prefilled float pocket and a calibrated liquid-volume linkage tripped in 39.75 ms. Closure and moving oil added to the crossing. |
| Only one buyer fails | 5.838 L | Crossing into that one failed buyer with the liquid witness working. The surviving port can continue receiving. |
| One failed buyer, standby receives remaining flow | 6.042 L | Forward crossing into the single failed buyer, including its small supplementary line. The modeled 3 s transfer to standby maintained 400.030 m³/h with a separately stocked, powered and intact receiving path. |
| Both weights and physical indications mimic receipt | 1,437.143 L | Paired crossing over the modeled 10.1 s fault episode. Genuine receipt at the failed buyers was zero. A longer hidden fault has no demonstrated bound here. |
| Controlled separation with both seats closed | 0 L | Both seats physically close before the receiving connection is released. This result requires the intended mechanical release sequence. |
Mechanical isolation at the connection
A separate mechanical link holds two independently sprung seats open at the original inlet. Loss of alignment releases them. A latch permits planned separation after both seats have closed and the trapped oil has been recovered. A separate linkage compares incoming oil with liquid accumulating in the receiving compartment. TODO describes closure before disconnection in its commercial TODO-MATIC range. The proposed geometry, flow response and quarantine system require independent tests. Manufacturer’s coupling description.
| Local test | Modeled result |
|---|---|
| Controlled separation or 140 ms mechanical warning | 0 L after loss in either specific trial. A seated valve before separation is a physically different condition from a sudden failure in a connected buyer. |
| Loss and independent frame trip at the same instant | 6.392 L. The positive inlet flow and finite valve travel persist after the local trigger. A 46.67 ms advance warning still allowed 1.072 L to cross. |
| False weights and delayed liquid trip with twin seats | 12.070 L. In this trial the twin-seat train passed slightly more oil during closure than the compact single-seat trial. |
| Both seats jam, drive unloads | 14.821 L forward and 27.772 L reverse over 0.45 s. Each direction is counted separately. With a blocked joint drain, the latch must hold the connection closed to departure. |
| Pressure and stocked oil | The healthy component screen gives 400.065 m³/h in the rolling-minute calculation, 88.383 Pa residual reversal head and only 0.894 reference L residual source stock per buyer. Assembly tolerances and a qualifying receiver are still required. |
| Trapped joint charge per buyer | 0.5505 hot L per jointly closed cycle. The model returns 0.544995 hot L to the seller and stores 0.005505 hot L in a separate quarantine cylinder. After 1,016 cycles that cylinder holds 5.593 hot L against 8 L working volume. |
At second 80 one open inlet carries 75 hot L/s. If an internal diversion leaves upstream pressure and indications unchanged for 1 ms, 0.07143 reference L crosses that failed inlet before a causal controller can distinguish the event. Catching that oil can protect the environment. It cannot erase its passage across the inlet.
Can one surviving buyer carry 40%?
A single installed nozzle can pass at most 257.143 m³/h even if it stays open. Its native pulsed schedule delivers 203.641 m³/h gross. The emergency target is 400 m³/h of genuine, on-spec oil through an intact receiving path.
One candidate provides a second independent inlet at a buyer able to retain the extra oil. A three-second switch during the modeled pulse displaces 214.29 L of gross delivery from the failed arm. Matching that pulse calls for that much working oil on the delivery side of the switch and upstream of the healthy inlet. The twin-seat model leaves only 0.894 L of source reserve per buyer. Additional funded stock, free receiving capacity, pressure and a verified route are prerequisites for this option.
Standby port simulation
With one original buyer lost, an independently primed spare and a continuous 0.20 m³/h net oil feed into the healthy buyer clear the 400 m³/h rolling-minute target in the 72-hour model. The delayed original inlet still admits oil to the failed buyer.
| Condition | Result |
|---|---|
| Timely 3 s takeover | 214.286 L from a separately charged 250 L chamber |
| 39.75 ms witness, no margin feed | 399.894 m³/h lower bound |
| 39.75 ms witness, 30 ms opening and healthy margin feed | 400.030 m³/h lower bound |
| Half-rate healthy margin feed | 399.930 m³/h lower bound |
| Five-second switch | 393.665 m³/h lower bound |
| Empty three-second bridge | 394.425 m³/h gross ceiling |
The trial assumes an additional intact receiver with 15,000 m³ free, a charged 250 L supply chamber, an empty 250 L recovery chamber and 14.4 m³ of additional on-spec oil per buyer. It charges the spare line with 476.19 reference L. The separate 30 kPa drive requires about 197.3 kWh over 72 hours at the assumed efficiency. A 15 kPa source misses the modeled 22.20 kPa opening requirement. Receiver integrity, power availability, product quality and final containment remain unverified.
72-hour duty and containment
The nominal registered cases include six 72-hour delivery duties, five deliveries with isolation at hour 60, and nine initial isolations. With eight pairs down per train the minimum clock-aligned qualified flow was 400.151 m³/h. A separate rolling-minute mixer test gave 400.067 m³/h. It fell to 399.979 m³/h with the mixer bypassed. Installed exterior retention remains open. The distributed leakage screen reached 1.002587 L against the 1 L limit. The costed nominal excavation was 72,186,722 m³ and modeled water ingress was 0.698480 L/h.
All 20 incident duties
Each operating state was checked at second 80. An already isolated case cannot demonstrate that the system detects a live buyer failure.
20 cases
| Case | Original duty | Buyer test at 80 s | Both failed inlets | Full mission |
|---|---|---|---|---|
| 1 Source closing energy lost and conventional valves jammed | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 2 Terminal closing energy lost and conventional valves jammed | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 3 Source and terminal closing energy lost with jammed conventional valves | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 4 Trigger inlets blocked with jammed conventional valves | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 5 Pilots blocked with jammed conventional valves | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 6 Sleeves torn with jammed conventional valves | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 7 Sleeve closing force tripled with jammed conventional valves | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 8 5 mm² seat gaps with jammed conventional valves | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 9 Three route boundaries lost | 72 h service | Live failure | 11.676 L | Unverifiedexterior oil, support integrity, wet separation |
| 10 Independent heat envelope penetrated | 72 h service | Live failure | 11.676 L | Unverifiedexterior oil, support integrity, wet separation |
| 11 Closed catch boundary lost | Immediate stop | Closed control | 0 L, closed | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity |
| 12 Loaded collapse and outer-vault loss at 60 h | Stop at 60 h | Live failure | 11.676 L | Unverifiedunannounced internal loss, loaded capture, total-loss containment, exterior oil, support integrity, wet separation |
| 13 100 mm source-gas wall breach | 72 h service | Live failure | 11.676 L | Unverifiedexterior oil, support integrity, wet separation |
| 14 Gas heat transfer degraded | 72 h service | Live failure | 11.676 L | Unverifiedexterior oil, support integrity, wet separation |
| 15 Catch heat transfer reduced at 60 h | Stop at 60 h | Live failure | 11.676 L | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity, wet separation |
| 16 Local pocket outer boundary lost | 72 h service | Live failure | 11.676 L | Unverifiedexterior oil, support integrity, wet separation |
| 17 Catch heat transfer lost at 60 h | Stop at 60 h | Live failure | 11.676 L | Unverifiedunannounced internal loss, total-loss containment, exterior oil, support integrity, wet separation |
| 18 Enclosure gas starts at 86°C | Stop at 60 h | Live failure | 11.676 L | Unverifiedunannounced internal loss, loaded capture, total-loss containment, exterior oil, support integrity, wet separation |
| 19 Catcher shield fully open | Stop at 60 h | Live failure | 11.676 L | Unverifiedunannounced internal loss, loaded capture, total-loss containment, exterior oil, support integrity, wet separation |
| 20 All current quality evidence falsified | 72 h service | Live failure | 11.676 L | Unverifiedexterior oil, support integrity, wet separation |
Film and simulation evidence
Buyer isolation during transfer