Service and containment
Emergency transfer after loss of normal service
The Haven Protocol is a proposed system for transferring crude to a buyer that can still receive it, while isolating damaged equipment and retaining the oil already on site.
How the system operates
Two trains use stored gas and piston pairs to move oil. Each buyer receives oil through a short rotary inlet into one of four compartments. A mechanical linkage compares the inlet movement with the rise of the actual liquid. A local valve closes on a detected mismatch. A seller-side bellows accepts some moving oil during closure. Secondary containment collects releases from the receiving yard.
What counts as delivery
A sale requires genuine retained oil at the original buyer inlet, with the specified water, chloride and solids limits. Oil directed into a damaged buyer, a seller-side catch or secondary containment does not earn delivery credit. All results in this proposal are simulations. No plant or hardware test is represented.
What the flow records establish
A registered minute begins on the controller clock. A rolling minute can begin at any instant during required service. Both are measured at the original buyer inlet.
Evidence needed at the inlet
The two adjacent minutes in the counterexample meet their scheduled requirements. Time-resolved measurements must establish where genuine oil, returned oil and measurement allowances fall within each pulse. A buffer downstream of the sale plane can smooth demand. It cannot establish how much crossed the original inlet.
A stronger physical calculation
With finite line inventory, ingress and film charged once per window, a stable composition of 0.50% water and 0.02% solids gives 400.139425 m³/h. Charging a further 0.020% scale error and 3 ms at each edge leaves 400.007968 m³/h. Moving 5 L of existing water to each side of a minute boundary, while preserving the two minute totals and the 44 m³ composite, lowers the once-only bound to 399.925976 m³/h. These are modeled lower bounds. Neither the timing of that water nor uniform composition has been measured.
Acceptance test
Record the two original inlet displacements, protected retained-volume measurements, grade, diverted flow and independent time references. Evaluate every 60-second window during service, including startup and the last full window before a scheduled isolation. Test hidden diversion and a falsely healthy mechanical indication with the same recording arrangement.
A finite mixing chamber for the rolling-flow requirement
A proposed chamber mixes oil before it crosses the original buyer inlet. The test shifts existing water between adjacent parts of the flow. Genuine oil still has to reach and remain in a healthy buyer.
What was purchased in the model
Each buyer uses 350 L of startup stock in the working chamber and 13.333 L in its necks, expressed at reference conditions. The conservative startup-pocket budget then leaves only 16.050 L per buyer. The drive calculation assumes a solid 70 mm member over 315 m, hot density of 2,100 kg/m³ and hot shear modulus of 26 GPa. Its one-sided displacement allowance is 18.401 L.
Where the design still fails
Forty millimetres of effective wet length at the assumed resistance costs 146.939 Pa out of 181.765 Pa available. Sixty millimetres costs 198.367 Pa and fails. The effective length must include the real chamber flow path. Mixing power, initial composition, the additional stored oil, pressure containment, seals and hot shaft couplings need independent evidence. The conditional rolling-flow pass adds no whole-installation passes.
Pressure margin and excavation
The selected support uses an 8 mm steel sheet and a 3 mm dry shim under the process piping. The model charges 0.5 mm of wear, a maximum 20 mm unsupported strip and finite heat stored in the new materials.
Installation assumptions
The selected sheet depends on the installed flatness, the maximum unsupported gap, at least 75% contact and the assumed substrate stiffness. The conditional water ingress is 0.698480 L/h against 0.699. If 1 microgram of additional water per square metre of counted bearing surfaces reached the buyer in one hour, ingress would rise to 0.701472 L/h. Actual moisture transport is unmeasured.
How the civil totals were combined
The buyer-yard vault and the process-train underfloor are separate excavation items. The applicable result subtracts the revised underfloor volume once and adds the buyer-yard construction allowance once. The calculation is conditional on both geometries being buildable at the site.
Detecting receipt from an empty compartment
The receiving cart has four compartments arranged around a fixed inlet. An initially dry compartment presents a specific problem for a level float. Oil can already be entering while the float is still resting on the floor.
Finite resources
After charging all the pocket liquid, 0.435 reference m³ of reserved oil remained per buyer. The modeled 72-hour yard energy was 87.246 kWh per buyer against 89.6 kWh available. The added cups must clear the moving dock and remain sealed under load. Their 0.796 m³ of installed oil is included as inventory at risk.
Measurement limit
The model corrects for the known central hub. It still assumes a 15 ms maximum tracking lag, bounded signed error and a calibrated volume curve throughout the usable depth. The installed curve must account for braces, deformation, liquid properties and draft. OIML R 71 describes the role of a calibration table in fixed storage tanks. It is a metrology reference for this proposal.
Containment and the incident register
The exterior limit is 1 litre across both trains over 72 hours. Internal oil held on the aisle, in a damaged cart or in the catch must be traced to an intact final boundary.
Leakage assumptions
The comparison uses an equivalent 2 µm diameter, 1 mm long through-pore and 2 mPa·s viscosity. These are specified trial conditions. Neither the number of actual through-paths nor the integrity of the external collection boundary has been measured. The pocket inventory is a separate potential bulk release.
Evidence that would change the verdict
The three loaded-yard cases are 12, 18 and 19. Their containment result depends on the supports and on the exterior boundary after oil reaches secondary containment. The remaining cases also require installed support and exterior integrity. The private case register lists the applicable requirements for every incident.
20-case register
The service column is the registered, clock-aligned minimum for the compact receiving system. Immediate-isolation cases owe zero sale.
20 incidents