The Haven Protocol

Emergency crude transfer, buyer isolation and exterior containment. All 20 incident duties are modeled. Full-installation verification remains open.

Service and containment

Emergency transfer after loss of normal service

The Haven Protocol is a proposed system for transferring crude to a buyer that can still receive it, while isolating damaged equipment and retaining the oil already on site.

How the system operates

Two trains use stored gas and piston pairs to move oil. Each buyer receives oil through a short rotary inlet into one of four compartments. A mechanical linkage compares the inlet movement with the rise of the actual liquid. A local valve closes on a detected mismatch. A seller-side bellows accepts some moving oil during closure. Secondary containment collects releases from the receiving yard.

Operating requirementEvidence
40% delivery for 72 hoursThe six recoverable cases sustained their modeled duties for 72 hours. The minimum across all due, clock-aligned minutes was approximately 400.151 reference m³/h. The design requires 400 m³/h over every 60-second interval.
Reduced gas and equipmentEach train had 152 working piston pairs and eight unavailable. Both gas assignments were tested: A at 73% with B at 100%, then A at 100% with B at 73%.
Pressure and earthworksThe hot-water calculation includes the heat stored in the bearing steel and shims. The selected nominal excavation is 72,186,722 m³ against a 72,200,000 m³ cap.
Safe containmentThe inlet closed at the registered stops. Site-wide exterior oil retention and installed support performance remain unverified. Zero of the 20 complete missions are verified.

What counts as delivery

A sale requires genuine retained oil at the original buyer inlet, with the specified water, chloride and solids limits. Oil directed into a damaged buyer, a seller-side catch or secondary containment does not earn delivery credit. All results in this proposal are simulations. No plant or hardware test is represented.

What the flow records establish

A registered minute begins on the controller clock. A rolling minute can begin at any instant during required service. Both are measured at the original buyer inlet.

TestResultScope
Aligned delivery400.151 m³/hMinimum over 175,680 paired due-minute replays. Four settings repeat 43,920 scheduled case minutes. Six incidents require 72 hours, five require service to hour 60.
Sales quality27,152 lotsAll modeled sale lots met the specified grade. With the proposed pockets the peaks were 0.5702% water by volume, 3.828 mg/kg organic chloride and 0.02025% solids by mass.
Shifted 60 s interval393.792 m³/hA possible assignment consistent with the aligned net-volume certificates puts deductions from adjacent minutes into one interval beginning at second 35. This establishes a limit on the certificate alone.
Instantaneous inlet flow0 during exchangeThe model needs 12.384 seconds with both inlets dry. Ideal continuous downstream demand would need at least 1.385 m³ of usable paired buffer capacity for the gross periodic waveform.

Evidence needed at the inlet

The two adjacent minutes in the counterexample meet their scheduled requirements. Time-resolved measurements must establish where genuine oil, returned oil and measurement allowances fall within each pulse. A buffer downstream of the sale plane can smooth demand. It cannot establish how much crossed the original inlet.

A stronger physical calculation

With finite line inventory, ingress and film charged once per window, a stable composition of 0.50% water and 0.02% solids gives 400.139425 m³/h. Charging a further 0.020% scale error and 3 ms at each edge leaves 400.007968 m³/h. Moving 5 L of existing water to each side of a minute boundary, while preserving the two minute totals and the 44 m³ composite, lowers the once-only bound to 399.925976 m³/h. These are modeled lower bounds. Neither the timing of that water nor uniform composition has been measured.

Acceptance test

Record the two original inlet displacements, protected retained-volume measurements, grade, diverted flow and independent time references. Evaluate every 60-second window during service, including startup and the last full window before a scheduled isolation. Test hidden diversion and a falsely healthy mechanical indication with the same recording arrangement.

A finite mixing chamber for the rolling-flow requirement

A proposed chamber mixes oil before it crosses the original buyer inlet. The test shifts existing water between adjacent parts of the flow. Genuine oil still has to reach and remain in a healthy buyer.

Same test, different equipment conditionRolling 60-second lower bound
350 L working mixer per buyer and specified lighter drive shaft400.066785 m³/h, including 0.020% volume-scale error and 3 ms at both window edges. The repeated water shifts, their two directions and startup are included.
Mixer completely bypassed399.978994 m³/h. The lighter shaft alone cannot remove the composition shift.
Only 10% of the chamber volume mixes399.987808 m³/h. Oil can pass through the chamber while most of its volume is inactive.
Hot shaft shear modulus falls to 20 GPa399.825138 m³/h. The reduced stiffness consumes the timing and displacement margin.

What was purchased in the model

Each buyer uses 350 L of startup stock in the working chamber and 13.333 L in its necks, expressed at reference conditions. The conservative startup-pocket budget then leaves only 16.050 L per buyer. The drive calculation assumes a solid 70 mm member over 315 m, hot density of 2,100 kg/m³ and hot shear modulus of 26 GPa. Its one-sided displacement allowance is 18.401 L.

Where the design still fails

Forty millimetres of effective wet length at the assumed resistance costs 146.939 Pa out of 181.765 Pa available. Sixty millimetres costs 198.367 Pa and fails. The effective length must include the real chamber flow path. Mixing power, initial composition, the additional stored oil, pressure containment, seals and hot shaft couplings need independent evidence. The conditional rolling-flow pass adds no whole-installation passes.

Pressure margin and excavation

The selected support uses an 8 mm steel sheet and a 3 mm dry shim under the process piping. The model charges 0.5 mm of wear, a maximum 20 mm unsupported strip and finite heat stored in the new materials.

ConditionModeled outcome
Nominal thermal and pressure calculationMinimum hot-water pressure above saturation was 2.411 kPa against 1.33 kPa. The 12 mm steel and 6 mm liner gave 2.287 kPa under the same heat and displacement calculation. Each gas assignment and pressure rule used its source history. The maximum source-gas temperature was 111.940 °C.
Lower ambient pressureA 2 kPa reduction in atmospheric pressure lowered the minimum water margin to 0.411 kPa on the frozen gas histories. Cases 12, 18 and 19 missed 1.33 kPa.
Nominal civil scope72,186,722 m³ paired excavation. The change to the process-floor support saves 5,069 m³ relative to the measured-model baseline.
Wider yard constructionWith a 1.5 m work strip, 25 m anchors and 12% overbreak, the combined excavation was 72,196,191 m³. This leaves 3,809 m³ under the cap.
Further work on the process floorThe same yard condition plus 9 mm additional average floor truing required 72,202,708 m³. This exceeds the cap by 2,708 m³.

Installation assumptions

The selected sheet depends on the installed flatness, the maximum unsupported gap, at least 75% contact and the assumed substrate stiffness. The conditional water ingress is 0.698480 L/h against 0.699. If 1 microgram of additional water per square metre of counted bearing surfaces reached the buyer in one hour, ingress would rise to 0.701472 L/h. Actual moisture transport is unmeasured.

How the civil totals were combined

The buyer-yard vault and the process-train underfloor are separate excavation items. The applicable result subtracts the revised underfloor volume once and adds the buyer-yard construction allowance once. The calculation is conditional on both geometries being buildable at the site.

Detecting receipt from an empty compartment

The receiving cart has four compartments arranged around a fixed inlet. An initially dry compartment presents a specific problem for a level float. Oil can already be entering while the float is still resting on the floor.

Receiver testObserved result
Dry start with a free floatWith an assumed 20 mm draft, 117.34 hot L must enter one selected compartment before the float lifts. The healthy-flow trial tripped after 2.40 hot L entered that buyer.
Prefilled recessed pocketA 90 mm diameter, 70 mm deep pocket starts the float at the floor datum. The healthy local trial continued. Each pocket holds 0.389 hot L. All 2,048 pockets contain 0.796 m³ hot oil across the installation.
Buyer fails at second 20Both weights stayed falsely healthy. A compartment area calculation that ignored the central hub allowed 27.53 reference L across the two inlets. Correcting the height-to-volume relation for the hub reduced crossing to 11.68 L. Neither failed buyer retained saleable oil.
Failure controlsLosing the pocket charge, a stuck float, a 40 ms tracking lag, or a 0.1% low volume calibration each shut down a healthy receiver in its own trial. Replayed physical follower movement remains capable of defeating detection.

Finite resources

After charging all the pocket liquid, 0.435 reference m³ of reserved oil remained per buyer. The modeled 72-hour yard energy was 87.246 kWh per buyer against 89.6 kWh available. The added cups must clear the moving dock and remain sealed under load. Their 0.796 m³ of installed oil is included as inventory at risk.

Measurement limit

The model corrects for the known central hub. It still assumes a 15 ms maximum tracking lag, bounded signed error and a calibrated volume curve throughout the usable depth. The installed curve must account for braces, deformation, liquid properties and draft. OIML R 71 describes the role of a calibration table in fixed storage tanks. It is a metrology reference for this proposal.

Containment and the incident register

The exterior limit is 1 litre across both trains over 72 hours. Internal oil held on the aisle, in a damaged cart or in the catch must be traced to an intact final boundary.

Conditional exterior testResult
Trace oil with the charged pockets0.999798439 L before any bulk oil escapes. Only 201.6 microlitres remain for all additional escape.
Sparse direct leakage paths0.999818 L in the pre-pocket compact layout with one selected sector path per buyer, charged rotor paths and the applicable loaded-loss paths.
Distributed direct leakage paths1.002587 L with a path at every wetted sector. Eleven selling cases exceed the allowance in the upper screen. The maximum modeled lower sum during normal exposure alone is 1.718 mL.

Leakage assumptions

The comparison uses an equivalent 2 µm diameter, 1 mm long through-pore and 2 mPa·s viscosity. These are specified trial conditions. Neither the number of actual through-paths nor the integrity of the external collection boundary has been measured. The pocket inventory is a separate potential bulk release.

Incident numbersRegistered dutyFull installation
9, 10, 13, 14, 16, 2072 hours of deliveryUnverified
12, 15, 17, 18, 1960 hours, then isolateUnverified
1, 2, 3, 4, 5, 6, 7, 8, 11Isolate immediatelyUnverified

Evidence that would change the verdict

The three loaded-yard cases are 12, 18 and 19. Their containment result depends on the supports and on the exterior boundary after oil reaches secondary containment. The remaining cases also require installed support and exterior integrity. The private case register lists the applicable requirements for every incident.

20-case register

The service column is the registered, clock-aligned minimum for the compact receiving system. Immediate-isolation cases owe zero sale.

20 incidents

CaseDutym³/hOpen installation requirements
10 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
20 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
30 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
40 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
50 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
60 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
70 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
80 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
972 h400.151Exterior oil, Support integrity, Isolation at the wet inlet
1072 h400.151Exterior oil, Support integrity, Isolation at the wet inlet
110 h—Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity
1260 h400.151Unannounced buyer loss, Loaded containment, Total-loss containment, Exterior oil, Support integrity, Isolation at the wet inlet
1372 h400.151Exterior oil, Support integrity, Isolation at the wet inlet
1472 h400.151Exterior oil, Support integrity, Isolation at the wet inlet
1560 h400.151Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity, Isolation at the wet inlet
1672 h400.151Exterior oil, Support integrity, Isolation at the wet inlet
1760 h400.151Unannounced buyer loss, Total-loss containment, Exterior oil, Support integrity, Isolation at the wet inlet
1860 h400.151Unannounced buyer loss, Loaded containment, Total-loss containment, Exterior oil, Support integrity, Isolation at the wet inlet
1960 h400.151Unannounced buyer loss, Loaded containment, Total-loss containment, Exterior oil, Support integrity, Isolation at the wet inlet
2072 h400.151Exterior oil, Support integrity, Isolation at the wet inlet