The Haven Protocol

Containment and recovery

Two crude-oil transfer trains over 72 hours. The panel replays simulated incidents using eight unavailable piston pairs per train. All oil limits cover both trains together.

The Haven Protocol

Emergency crude transfer and containment over 72 hours. The paired system combines movable buyer tanks, a dry drive, a shored catch beneath each loading yard and passive gas displacement.

Lowest genuine delivery
400.157 m³/h
Oil on one aisle at hour 72
3.175 m³
Complete simulated missions
0 / 20

Of 20 complete simulated missions, 0 passed, 0 failed and 20 remain unverified. The aisle measurement tracks oil inside one yard. The exterior limit covers both trains through hour 72.

When drainage fails

Bleeding directly into the pressurized catch left 74.889 m³ on the aisle. A 40 mm low spot left 42.328 m³. A 0.15% flash-mass control left 4,964.1 m³; the modeled level exceeds the assumed deck containment.

When both weights read healthy

A mechanically compelled disconnect seated before failure admitted zero. In the separate unexpected-loss test the dock latch admitted at most 34.53 L when both weights read healthy. False physical follower travel admitted 1,437.14 L.

Incident requirements

Case 01 · Source closing energy lost and conventional valves jammed

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 01
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 02 · Terminal closing energy lost and conventional valves jammed

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 02
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 03 · Source and terminal closing energy lost with jammed conventional valves

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 03
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 04 · Trigger inlets blocked with jammed conventional valves

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 04
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 05 · Pilots blocked with jammed conventional valves

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 05
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 06 · Sleeves torn with jammed conventional valves

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 06
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 07 · Sleeve closing force tripled with jammed conventional valves

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 07
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 08 · 5 mm² seat gaps with jammed conventional valves

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 08
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 09 · Three route boundaries lost

Complete mission Unverified

Recorded duty
72 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.160 kPa
Sale portions tested
2,672

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 10 pass · 3 unverified · 6 not applicable
Recorded duty and additional requirements for case 09
RequirementResult
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Original inlet at the scheduled stopNot applicable
Unannounced loss at the original inletNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Safe total-loss isolation and containmentNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 10 · Independent heat envelope penetrated

Complete mission Unverified

Recorded duty
72 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.160 kPa
Sale portions tested
2,672

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 10 pass · 3 unverified · 6 not applicable
Recorded duty and additional requirements for case 10
RequirementResult
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Original inlet at the scheduled stopNot applicable
Unannounced loss at the original inletNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Safe total-loss isolation and containmentNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 11 · Closed catch boundary lost

Complete mission Unverified

Recorded duty
Immediate isolation
Lowest genuine flow
No sale due
Hot-water pressure margin
4.160 kPa
Sale portions tested
0

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 8 pass · 4 unverified · 7 not applicable
Recorded duty and additional requirements for case 11
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Required flow or scheduled stopPass
Original inlet at the scheduled stopPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Genuine received oilNot applicable
Final sale qualityNot applicable
Finite stock, energy and movementNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Wet pathways separated from buyer inventoryNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 12 · Loaded collapse and outer-vault loss at 60 h

Complete mission Unverified

Recorded duty
60 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
2.410 kPa
Sale portions tested
2,224

Loaded-yard damage trial The registered incident assigns a loaded-capture duty. A separate yard model imposes simultaneous damage to the loaded vehicles at hour 60 and follows their oil through hour 72.

View 19 requirements 13 pass · 6 unverified
Recorded duty and additional requirements for case 12
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Loaded liquid and gas capture through hour 72Unverified
Safe total-loss isolation and containmentUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Original inlet at the scheduled stopPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Short loaded-roof pressure testPass
Loaded-yard oil and water mass balancePass
Case 13 · 100 mm source-gas wall breach

Complete mission Unverified

Recorded duty
72 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.160 kPa
Sale portions tested
2,672

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 10 pass · 3 unverified · 6 not applicable
Recorded duty and additional requirements for case 13
RequirementResult
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Original inlet at the scheduled stopNot applicable
Unannounced loss at the original inletNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Safe total-loss isolation and containmentNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 14 · Gas heat transfer degraded

Complete mission Unverified

Recorded duty
72 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.240 kPa
Sale portions tested
2,672

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 10 pass · 3 unverified · 6 not applicable
Recorded duty and additional requirements for case 14
RequirementResult
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Original inlet at the scheduled stopNot applicable
Unannounced loss at the original inletNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Safe total-loss isolation and containmentNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 15 · Catch heat transfer reduced at 60 h

Complete mission Unverified

Recorded duty
60 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.160 kPa
Sale portions tested
2,224

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 11 pass · 5 unverified · 3 not applicable
Recorded duty and additional requirements for case 15
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Original inlet at the scheduled stopPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Loaded-yard oil and water mass balanceNot applicable
Case 16 · Local pocket outer boundary lost

Complete mission Unverified

Recorded duty
72 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.160 kPa
Sale portions tested
2,672

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 10 pass · 3 unverified · 6 not applicable
Recorded duty and additional requirements for case 16
RequirementResult
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Original inlet at the scheduled stopNot applicable
Unannounced loss at the original inletNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Safe total-loss isolation and containmentNot applicable
Loaded-yard oil and water mass balanceNot applicable
Case 17 · Catch heat transfer lost at 60 h

Complete mission Unverified

Recorded duty
60 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.160 kPa
Sale portions tested
2,224

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 11 pass · 5 unverified · 3 not applicable
Recorded duty and additional requirements for case 17
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Safe total-loss isolation and containmentUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Original inlet at the scheduled stopPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Loaded-yard oil and water mass balanceNot applicable
Case 18 · Enclosure gas starts at 86°C

Complete mission Unverified

Recorded duty
60 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
2.394 kPa
Sale portions tested
2,224

Loaded-yard damage trial The registered incident assigns a loaded-capture duty. A separate yard model imposes simultaneous damage to the loaded vehicles at hour 60 and follows their oil through hour 72.

View 19 requirements 13 pass · 6 unverified
Recorded duty and additional requirements for case 18
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Loaded liquid and gas capture through hour 72Unverified
Safe total-loss isolation and containmentUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Original inlet at the scheduled stopPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Short loaded-roof pressure testPass
Loaded-yard oil and water mass balancePass
Case 19 · Catcher shield fully open

Complete mission Unverified

Recorded duty
60 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
2.411 kPa
Sale portions tested
2,224

Loaded-yard damage trial The registered incident assigns a loaded-capture duty. A separate yard model imposes simultaneous damage to the loaded vehicles at hour 60 and follows their oil through hour 72.

View 19 requirements 13 pass · 6 unverified
Recorded duty and additional requirements for case 19
RequirementResult
Unannounced loss at the original inletUnverified
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Loaded liquid and gas capture through hour 72Unverified
Safe total-loss isolation and containmentUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Original inlet at the scheduled stopPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Short loaded-roof pressure testPass
Loaded-yard oil and water mass balancePass
Case 20 · All current quality evidence falsified

Complete mission Unverified

Recorded duty
72 h delivery
Lowest genuine flow
400.156516 m³/h
Hot-water pressure margin
4.240 kPa
Sale portions tested
2,672

Loaded-yard damage trial The separate hour-60 loaded-vehicle damage trial is outside this registered incident’s assigned duty.

View 19 requirements 10 pass · 3 unverified · 6 not applicable
Recorded duty and additional requirements for case 20
RequirementResult
Oil crossing the site boundaryUnverified
Installed support responseUnverified
Wet pathways separated from buyer inventoryUnverified
Required flow or scheduled stopPass
Genuine received oilPass
Final sale qualityPass
Finite stock, energy and movementPass
Train losses and gas accessPass
Gallery gas temperature and pressurePass
Hot-water and pipe pressurePass
Rolling-hour water ingressPass
Counted paired excavationPass
Conditional exterior trace oilPass
Original inlet at the scheduled stopNot applicable
Unannounced loss at the original inletNot applicable
Short loaded-roof pressure testNot applicable
Loaded liquid and gas capture through hour 72Not applicable
Safe total-loss isolation and containmentNot applicable
Loaded-yard oil and water mass balanceNot applicable

Equipment and test conditions

From the loading aisle to the cellar

A 3.75 m deep shored cellar, sixteen gravity legs and a closed variable-volume nitrogen holder serve each buyer. Each leg starts dry. Liquid from the aisle pushes its initial gas into a finite primer pouch.

Starting the drains
The 16 pouches and a movable gas holder provide a finite destination for displaced gas. At 84% usable floor and the upper drive ratio, the legs primed in 5.22 s without adding fresh water. Peak catch pressure was 111.090 kPa absolute.
Where the oil went
At hour 60 the loaded vehicles failed. Twelve hours later, each buyer had 12,824.217 m³ in the catch, 2.262 m³ in the gravity legs, 3.1746 m³ on the aisle and 0.000 m³ in damaged vehicles. Earlier open-slot drainage left 636.923 m³ on the aisle for the same oil offer.
Residual film and floodwater
The last 3.1746 m³ equals the model's 3 mm residual layer across the aisle. Real floor slope, low spots and wetting determine that depth. The catch held 1,531.366 m³ of stormwater. The final oil and water discrepancies were below 0.0001 m³.
Pressure, foundations and flow

Both assignments of 73% and 100% gas access use the same twenty incident clocks with eight piston pairs unavailable per train. Ground preparation, gas charging and structures are included in the selected estimate.

Dry bearing seat
A 12 mm steel plate sits on a 6 mm shim. At 2 mm corrective machining, the seat reduces excavation by 2,896.7 m³ and ceramic by 9,024 tonnes. The new surface is charged to the contaminant budget.
Hot-water pressure
The minimum free-surface margin rose from 2.3156 to 2.3937 kPa, against 1.33 kPa required. At 2 kPa lower ambient pressure, cases 12, 18, 19 fall below the target and the minimum is 0.3937 kPa.
Flow and quality
Across 175,680 due minutes in the four settings, the minimum genuine flow was 400.156516 m³/h. All 27,152 sale portions met the modeled specification. Water reached 0.5687%, chloride 3.7853 mg/kg and sediment 0.02024%.
Excavation
The paired estimate is 72,191,791.0 m³, leaving 8,209.0 m³ to the cap. Using the 50% bulk construction allowance on the new vault depth gives 72,206,689.5 m³. Actual shoring, holder and pile connections still need a site load test.
What the exterior oil allowance covers

The one-litre limit applies to both trains together through hour 72. Oil on a loading aisle has a known location inside the model. Its eventual path across the site boundary requires separate evidence.

Gas purity and residue
At a bounded 0.65 ppbv gas charge, the conditional trace-oil total is 0.999570656 L. This leaves 0.429 mL for all bulk escape. Raw 5 ppbv gas takes the same layout to 1.00515036 L before bulk escape.
A continuous exterior path
With an assumed continuous 5 µm path per station, sustained differential pressure and the test viscosity, the paired leakage calculation adds 0.4374 mL. The modeled sum becomes 1.00000802 L. Installed leak paths and their true heads remain unmeasured.
Buyer water
Gas and surface charges total 0.698085544 L/h, leaving 0.914 mL/h for all additional paths. The normal prime uses storm liquid. Leakage from a wet path to the sale line can consume this margin.
Testing the remaining site margin

The two buyers share one exterior allowance. The timed leakage calculation follows the loaded carts from hour zero, then follows liquid pressure in the aisle and catch through hour 72. It assumes specified pore lengths, viscosity and geometry.

Floor and aisle pathways
At 2 mPa·s, the paired model with a 10 µm through-path at each aisle and each catch floor totals 0.999946739 L, with hot leak volume charged in full. Peak catch-floor pressure was 31.085 kPa above the exterior. The upper-bound time calculation used 12,163 steps.
An additional damaged cart
One additional direct path of the same size from a loaded cart at each buyer changes the total to 1.001677924 L. Neither assumed route count establishes the true number of simultaneous leaks.
Purifying the purchased gas
The linear sorption model gives 0.598 ppbv including assay uncertainty. Two 472.5 kg beds with a finite 350 mg/kg saturation capacity and an assumed uptake coefficient of 0.01/s give 0.618 ppbv. Over seven days the solid captures 5.104 g. The installed supply specification is 0.65 ppbv.
An exhausted or weaker bed
At 80 mg/kg the predicted gas upper limit reaches 0.696 ppbv and exceeds the purchase specification. Fully exhausted media increase the paired trace charge to 1.00534277 L. Real sorbent capacity, uptake and shipping cleanliness require measurement.
Supporting the loading aisle
The 900 mm girder reaches 148.10 MPa against a 160 MPa screen. A 750 mm girder reaches 186.67 MPa. The holder and its conduits require 1,922 m² of additional land. Actual pile capacities and connections remain unknown.

The Haven Protocol

Emergency crude transfer and containment after damage. The design target is to deliver 40% of normal flow for 72 hours to an intact buyer and stop delivery to a failed buyer while containing the oil already on site.

Complete simulated missions
0 / 20
Minimum genuine delivery
400.159 m³/h
Hidden diversion at the buyer
1.437 m³

Buyer fails during flow Both weights read healthy. The independent tank-level trip admitted 117.19 L. In a separate bench calculation a direct mechanical comparison limited transfer to 34.53 L. A mechanically compelled disconnect seated before loss admitted zero.

Equipment and fault evidence

What stops a failed buyer

The acceptance boundary is the original buyer inlet. Oil crossing after loss counts even if a downstream structure catches it. Volumes below are reference litres across both buyers.

Physical separation
The interlocked selector closed 38.43 ms before an intact disconnect opened. Zero crossed. At faster travel, the valve seated after loss and 5.94 L crossed. An internal break with no warning admitted 1,442.86 L.
Weights remain falsely healthy
The receiving level, independent of the weights, stopped the mobile-tank transfer after 117.19 L crossed. The shutoff remains valuable even though this misses the zero-transfer requirement.
Indistinguishable receivers
Two simulated buyers produced the same 18,021 observed records and commands. One retained 1,437.14 L. The other retained zero. The controller kept sending oil across the same boundary.
Why response time matters
At 400 m³/h, some 100 ms interval carries at least 11.11 L. The modeled pulse reached 14.29 L. An undetectable failure during that interval defeats an exact-zero reactive shutoff.
A mechanical trip independent of weight

A dock-mounted differential compares a shaft driven by actual inlet displacement with a follower on the liquid surface of the final tank. A magnetic pickup through a sealed wall transmits the follower motion to a spring latch. If delivered oil gets ahead of retained oil, the latch removes the inlet valve hold-open force. Weights and digital indications have no mechanical authority.

Full diversion with false weights
The final tank stopped gaining oil. At the flowing test instant, at most 34.53 reference L crossed both inlets, including both 5 L pressure pockets. The bound over 240 sampled start phases reached 34.57 L. No post-loss volume was credited to delivery.
Assumed mechanical performance
The liquid surface covers 20.25 m². The assumed latch gap is 0.25 mm, residual position error is at most 0.10 mm, follower lag is 15 ms and the spring valve seats in 80 ms. Flow is charged through the full travel. Stable tracking at these tolerances has not been demonstrated.
Controls that defeat the device
A falsely moving physical follower admitted 1,437.14 L. A 1 mm adverse position error tripped a healthy tank. At 160 ms seating, the full-diversion bound became 45.95 L. A small diversion can escape the deadband.
Qualification boundary
The comparison senses the final tank and preserves the original buyer inlet. The float, magnetic coupling, dock reset, calibration, trapped gas and pressure-pocket leakage need a loaded rig test. The bench device has no full-mission, energy or exterior-oil credit.
Three days on finite stock

A fixed dry drive ratio of 1.00510 meters customer-quality stock through three alternating cylinders. Two independent buyers receive the combined flow. Each pressure rule was tested with 73% gas access on either train and 100% on the other.

Actual sale
175,680 required paired minutes were replayed across four operating settings. The lowest genuine minute was 400.158531 m³/h. The stock calculation includes the dock debit. 1.207 m³ remained per buyer.
Buyer quality
Water peaked at 0.5684% by volume, organic chloride at 3.2861 mg/kg and sediment at 0.02019% by mass. Limits are 1%, 5 mg/kg and 0.05%. The calculation charges surface residues and fresh gas.
Power and motion
Each buyer required up to 29.401 kW and 7.368 GJ. The yard model had zero late tank preparations. Full independent power loss and mechanically damaged returns remain separate failure tests.
A faster drive
At a ratio of 1.00545, indicated service reached 400.299 m³/h, but each buyer exhausted the original stock by 3.899 m³. This setting fails.
Margins on the same installation

The 12 mm support plate, movable receivers and two pipe lengths are charged to one material and fluid budget. Each train carries eight unavailable piston pairs. Only the modeled layouts and pressure rules receive credit.

Hot water
The least hot-water pressure above saturation was 2.3156 kPa against the 1.33 kPa requirement. A larger bedding movement or lower ambient pressure can consume that margin.
Service measurement
With a further 0.020% scale error and a 3 ms error at either end of an arbitrarily phased minute, the lower bound remains above 400 m³/h. At 5 ms it falls below 400. These clock and scale errors are sensitivity inputs.
Cut-to-length gas pipes
Each buyer uses two groups of 18 pipes, at 37.9 and 37.2 m. Nominal roof pressure including the raised rack is 171.2915 kPa absolute. At the short tolerance it approaches 171.306 kPa against a 171.325 kPa limit. Concentrating the same oil on 42% of the pool floor wets roof openings earlier and raises pressure above 193 kPa.
Civil works and trace oil
Paired excavation is 72,151,681.8 m³ against 72,200,000. Water ingress is 0.669666 L/h. The conditional exterior charge is 0.999979743 L against 1 L, leaving 20.26 microlitres. This assumes zero additional bulk escape.
Where the oil goes after a common loss

Closing the dock isolates the parked vehicles from further supply. A common failure can still breach the oil they already contain. A separate whole-yard catch was tested with heat, displaced gas and finite return passages.

Stored stock at hour 60
At the nominal drive ratio, 12,829.399 m³ hot oil was present per buyer. Only 46.328 m³ was in the connected tank. Damage across parked tanks exposes a much larger inventory.
Liquid on the aisle
At the upper drive tolerance, with all 212 returns available, peak catch pressure was 111.760 kPa absolute. The model still held 636.923 m³ of oil on the aisle at hour 72. Neither the aisle nor a damaged vehicle is a verified exterior boundary.
Common loss with restricted gas
Blocking all return passages traps oil in vacuum-limited ruptured vehicles. Additional flash gas can leave over 6,200 m³ on the aisle. A lower catch pressure or smaller floor inventory alone cannot qualify final containment.
Fully charged catch option
Charging the catch and its headers gives 1.00362565 L of trace oil, above 1 L before bulk escape. It needs 72,199,902.8 m³ of excavation before gantry and footing costs. The combined margin cannot be credited by using the roof-only budget.
Incident outcomes · 20 cases 20 incidents
IncidentDelivery dutyLowest genuine flowWater pressure above saturationPeak gallery gasFull case
01 · Source closing energy lost and conventional valves jammedImmediate isolationNo sale due4.149 kPa115.828 °COpen
02 · Terminal closing energy lost and conventional valves jammedImmediate isolationNo sale due4.149 kPa115.828 °COpen
03 · Source and terminal closing energy lost with jammed conventional valvesImmediate isolationNo sale due4.149 kPa115.828 °COpen
04 · Trigger inlets blocked with jammed conventional valvesImmediate isolationNo sale due4.149 kPa115.828 °COpen
05 · Pilots blocked with jammed conventional valvesImmediate isolationNo sale due4.149 kPa115.828 °COpen
06 · Sleeves torn with jammed conventional valvesImmediate isolationNo sale due4.149 kPa115.828 °COpen
07 · Sleeve closing force tripled with jammed conventional valvesImmediate isolationNo sale due4.149 kPa115.828 °COpen
08 · 5 mm² seat gaps with jammed conventional valvesImmediate isolationNo sale due4.149 kPa115.828 °COpen
09 · Three route boundaries lost72 h400.158531 m³/h4.149 kPa115.828 °COpen
10 · Independent heat envelope penetrated72 h400.158531 m³/h4.149 kPa115.828 °COpen
11 · Closed catch boundary lostImmediate isolationNo sale due4.149 kPa115.828 °COpen
12 · Loaded collapse and outer-vault loss at 60 h60 h400.158531 m³/h2.333 kPa115.828 °COpen
13 · 100 mm source-gas wall breach72 h400.158531 m³/h4.149 kPa115.828 °COpen
14 · Gas heat transfer degraded72 h400.158531 m³/h4.229 kPa116.067 °COpen
15 · Catch heat transfer reduced at 60 h60 h400.158531 m³/h4.149 kPa115.828 °COpen
16 · Local pocket outer boundary lost72 h400.158531 m³/h4.149 kPa115.828 °COpen
17 · Catch heat transfer lost at 60 h60 h400.158531 m³/h4.149 kPa115.828 °COpen
18 · Enclosure gas starts at 86°C60 h400.158531 m³/h2.316 kPa115.828 °COpen
19 · Catcher shield fully open60 h400.158531 m³/h2.333 kPa115.828 °COpen
20 · All current quality evidence falsified72 h400.158531 m³/h4.229 kPa116.067 °COpen

Operating envelope

For the pipe supported on steel bearing plates, the model replayed the assigned delivery and isolation duties for all 20 incidents. The mobile buyer tank and outer catches have their own site and resource assumptions. All results are simulated. Every incident still has an open 72-hour requirement.

2.316 kPaLowest hot-water margin above saturation · requirement 1.330 kPa
400.044194Lowest genuine flow in a required minute · m³/h
0.999802 LConditional exterior oil in 72 h · paired limit 1 L
0 / 20Complete cases demonstrated in simulation

The bearing plates bring paired excavation from 72,112,952.4 to 72,130,332.5 m³. The worst rolling hour admits 0.665048 L of water across both installations.

A bearing plate keeps pressure above the hot-water limit

The pipe grid bears directly on 12 mm steel plates and solid shims. The model charges their weight, added resistance, surfaces and excavation. The original buyer and roof remain in this matched test.

Hot water and repeated duty
With a 0.2°C hotter water film and 25 mm relative rise, minimum free-surface pressure above saturation increases from 1.341 to 2.316 kPa. The requirement is 1.330 kPa. Both 73%/100% assignments and both pressure rules were replayed with eight pairs down per train.
Conditions that change the outcome
A 0.5°C hotter film and 40 mm rise gave 1.393 kPa. With ambient pressure 2 kPa lower the margin fell to 0.316 kPa. A 100 mm bedding gap gave 0.179 kPa. Cases 12, 18 and 19 fail with lower ambient pressure and with the wider bedding gap. The 0.5°C and 40 mm trial passes all 20.
Construction and cleanliness
The design uses 52,475 t steel and 18,049 t of shims. Paired excavation is 72,130,333 m³. At 0.10 µg/m² new surface residue, rated exterior oil is 0.999802 L. At ten times that residue it is 1.002307 L.
Buyer flow and quality
The 691,200 train-minute input replay gives 400.044194 m³/h at the limiting required minute. All 175,680 required paired minutes and 27,152 sale portions met their scheduled tests. The worst rolling-hour water ingress is 0.665048 L. Seat and foundation behavior still require installed tests.
All 20 matched incidents
IncidentSale dutyLowest genuine flowWater pressure above saturationPeak gallery gasFull 72-hour case
01 · Source closing energy lost and conventional valves jammed0 hNo sale due4.149 kPa115.828 °COpen
02 · Terminal closing energy lost and conventional valves jammed0 hNo sale due4.149 kPa115.828 °COpen
03 · Source and terminal closing energy lost with jammed conventional valves0 hNo sale due4.149 kPa115.828 °COpen
04 · Trigger inlets blocked with jammed conventional valves0 hNo sale due4.149 kPa115.828 °COpen
05 · Pilots blocked with jammed conventional valves0 hNo sale due4.149 kPa115.828 °COpen
06 · Sleeves torn with jammed conventional valves0 hNo sale due4.149 kPa115.828 °COpen
07 · Sleeve closing force tripled with jammed conventional valves0 hNo sale due4.149 kPa115.828 °COpen
08 · 5 mm² seat gaps with jammed conventional valves0 hNo sale due4.149 kPa115.828 °COpen
09 · Three route boundaries lost72 h400.044194 m³/h4.149 kPa115.828 °COpen
10 · Independent heat envelope penetrated72 h400.044194 m³/h4.149 kPa115.828 °COpen
11 · Closed catch boundary lost0 hNo sale due4.149 kPa115.828 °COpen
12 · Loaded collapse and outer-vault loss at 60 h60 h400.044194 m³/h2.333 kPa115.828 °COpen
13 · 100 mm source-gas wall breach72 h400.044194 m³/h4.149 kPa115.828 °COpen
14 · Gas heat transfer degraded72 h400.044194 m³/h4.229 kPa116.067 °COpen
15 · Catch heat transfer reduced at 60 h60 h400.044194 m³/h4.149 kPa115.828 °COpen
16 · Local pocket outer boundary lost72 h400.044194 m³/h4.149 kPa115.828 °COpen
17 · Catch heat transfer lost at 60 h60 h400.044194 m³/h4.149 kPa115.828 °COpen
18 · Enclosure gas starts at 86°C60 h400.044194 m³/h2.316 kPa115.828 °COpen
19 · Catcher shield fully open60 h400.044194 m³/h2.333 kPa115.828 °COpen
20 · All current quality evidence falsified72 h400.044194 m³/h4.229 kPa116.067 °COpen

Buyer receiver and transfer line

Six incidents require 72 hours of delivery. Five require 60 hours of delivery followed by isolation. Nine require immediate isolation. All twenty require containment through hour 72. An open case has one or more unverified conditions.

Three-cylinder transfer at the buyer inlet

Three 35 L cylinders at each buyer overlap their delivery strokes. At second 20, each original inlet carries 75 hot L/s. The buyer then loses incoming oil while its weight reading stays falsely healthy. The simulation counts all oil that crosses either inlet after the loss, including oil caught downstream.

400.044211Lowest genuine delivery in a required minute · m³/h
0 / 20Complete 72-hour cases demonstrated in simulation

Combined site budgets

Both installations togetherThree-cylinder simulationLimit
Water in the worst rolling hour0.665048 L0.699 L
Exterior oil over 72 hours · clean components0.999523 L1 L
Exterior oil with 10 mg/m² of mobile residue on the new equipment1.000257 L1 L · exceeds limit
Counted excavation72,112,952.4 m³72,200,000 m³
All 20 cases with three-cylinder transfer
IncidentDelivery hoursLowest genuine flow, m³/hOff-spec / tested lotsOutstanding checksFull case
01 · Source closing energy lost and conventional valves jammed0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
02 · Terminal closing energy lost and conventional valves jammed0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
03 · Source and terminal closing energy lost with jammed conventional valves0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
04 · Trigger inlets blocked with jammed conventional valves0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
05 · Pilots blocked with jammed conventional valves0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
06 · Sleeves torn with jammed conventional valves0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
07 · Sleeve closing force tripled with jammed conventional valves0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
08 · 5 mm² seat gaps with jammed conventional valves0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
09 · Three route boundaries lost72400.0440 / 2,672Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protectionOpen
10 · Independent heat envelope penetrated72400.0440 / 2,672Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protectionOpen
11 · Closed catch boundary lost0—No saleExterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meterOpen
12 · Loaded collapse and outer-vault loss at 60 h60400.0440 / 2,224Exterior oil and bulk spill retention · Response of the new foundations · Loaded liquid and gas containment · Unobserved loss past the receiver meter · Gas moisture and product protectionOpen
13 · 100 mm source-gas wall breach72400.0440 / 2,672Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protectionOpen
14 · Gas heat transfer degraded72400.0440 / 2,672Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protectionOpen
15 · Catch heat transfer reduced at 60 h60400.0440 / 2,224Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter · Gas moisture and product protectionOpen
16 · Local pocket outer boundary lost72400.0440 / 2,672Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protectionOpen
17 · Catch heat transfer lost at 60 h60400.0440 / 2,224Exterior oil and bulk spill retention · Response of the new foundations · Unobserved loss past the receiver meter · Gas moisture and product protectionOpen
18 · Enclosure gas starts at 86°C60400.0440 / 2,224Exterior oil and bulk spill retention · Response of the new foundations · Loaded liquid and gas containment · Unobserved loss past the receiver meter · Gas moisture and product protectionOpen
19 · Catcher shield fully open60400.0440 / 2,224Exterior oil and bulk spill retention · Response of the new foundations · Loaded liquid and gas containment · Unobserved loss past the receiver meter · Gas moisture and product protectionOpen
20 · All current quality evidence falsified72400.0440 / 2,672Exterior oil and bulk spill retention · Response of the new foundations · Gas moisture and product protectionOpen

Collar and containment comparison

A mechanical collar requires fresh shaft travel before oil can enter the buyer. Select when the receiver loses its ability to accept oil. The measured volume is the amount crossing the original buyer inlet after that loss, summed across both buyers.

20 / 20Registered schedules passed
0 / 20Complete simulated incidents
400.118Lowest genuine minute-average flow on scheduled delivery · m³/h
0.000 m³Failed-buyer transfer when loss coincides with reset
0.000 m³

The catch stays silent. Residual motion ends before the collar earns enough fresh travel to open. Both buyer inlets remain seated.

With the 6.8 m wall, overhead gas paths and pulse cells, the combined model budgets 0.665047 L/h of water, 0.999504 L of exterior oil in 72 h and 72,112,894.8 m³ of excavation. The oil total assumes the stated gas purity and retention of bulk oil. A wave overtopped the wall when the oil initially occupied 55% of the usable floor.

Fresh-travel collar results for all 20 incidents
IncidentDelivery duty, hLowest genuine flow, m³/hOff-spec / tested portionsOil after registered silent stop, m³Full incident
01 · Source closing energy lost and conventional valves jammed0—No sale0.000Open
02 · Terminal closing energy lost and conventional valves jammed0—No sale0.000Open
03 · Source and terminal closing energy lost with jammed conventional valves0—No sale0.000Open
04 · Trigger inlets blocked with jammed conventional valves0—No sale0.000Open
05 · Pilots blocked with jammed conventional valves0—No sale0.000Open
06 · Sleeves torn with jammed conventional valves0—No sale0.000Open
07 · Sleeve closing force tripled with jammed conventional valves0—No sale0.000Open
08 · 5 mm² seat gaps with jammed conventional valves0—No sale0.000Open
09 · Three route boundaries lost72400.1180 / 2,672—Open
10 · Independent heat envelope penetrated72400.1180 / 2,672—Open
11 · Closed catch boundary lost0—No sale0.000Open
12 · Loaded collapse and outer-vault loss at 60 h60400.1180 / 2,2240.000Open
13 · 100 mm source-gas wall breach72400.1180 / 2,672—Open
14 · Gas heat transfer degraded72400.1180 / 2,672—Open
15 · Catch heat transfer reduced at 60 h60400.1180 / 2,2240.000Open
16 · Local pocket outer boundary lost72400.1180 / 2,672—Open
17 · Catch heat transfer lost at 60 h60400.1180 / 2,2240.000Open
18 · Enclosure gas starts at 86°C60400.1180 / 2,2240.000Open
19 · Catcher shield fully open60400.1180 / 2,2240.000Open
20 · All current quality evidence falsified72400.1180 / 2,672—Open

Six-second pickup comparison

0 / 20Complete simulated cases
400.118Lowest minute-average flow with automatic hold · m³/h
0.996368 LExterior oil under specified conditions
72.0706 MCounted receiver excavation · m³

20 of 20 scheduled controller tests passed. The buyer inlet closes for six seconds each minute. The 40% flow target is assessed over each full minute. Hardware pressure and whole-site containment are separate checks.

Both buyers share a limit of 0.699 L in any rolling hour. With the six-second hold, the highest modeled water content of a sold portion was 0.6177%.

Outstanding checks for this incident
    All 20 combined case outcomes
    IncidentDelivery duty, hNo hold, m³/hSix-second hold, m³/hOff-spec / tested with holdRetained-key comparison, m³Full case
    01 · Source closing energy lost and conventional valves jammed0——No sale1.131Open
    02 · Terminal closing energy lost and conventional valves jammed0——No sale1.131Open
    03 · Source and terminal closing energy lost with jammed conventional valves0——No sale1.131Open
    04 · Trigger inlets blocked with jammed conventional valves0——No sale1.131Open
    05 · Pilots blocked with jammed conventional valves0——No sale1.131Open
    06 · Sleeves torn with jammed conventional valves0——No sale1.131Open
    07 · Sleeve closing force tripled with jammed conventional valves0——No sale1.131Open
    08 · 5 mm² seat gaps with jammed conventional valves0——No sale1.131Open
    09 · Three route boundaries lost72400.432400.1180 / 2,672—Open
    10 · Independent heat envelope penetrated72400.432400.1180 / 2,672—Open
    11 · Closed catch boundary lost0——No sale1.131Open
    12 · Loaded collapse and outer-vault loss at 60 h60400.432400.1180 / 2,2241.171Open
    13 · 100 mm source-gas wall breach72400.432400.1180 / 2,672—Open
    14 · Gas heat transfer degraded72400.432400.1180 / 2,672—Open
    15 · Catch heat transfer reduced at 60 h60400.432400.1180 / 2,2241.171Open
    16 · Local pocket outer boundary lost72400.432400.1180 / 2,672—Open
    17 · Catch heat transfer lost at 60 h60400.432400.1180 / 2,2241.171Open
    18 · Enclosure gas starts at 86°C60400.432400.1180 / 2,2241.171Open
    19 · Catcher shield fully open60400.432400.1180 / 2,2241.171Open
    20 · All current quality evidence falsified72400.432400.1180 / 2,672—Open
    Three small cylinders keep the buyer inlet supplied

    Each buyer has three finite 35 L seller cylinders. One empties, a second takes over as the first slows, and the third refills. Their flow overlaps for 120 ms. The gas buffer and pump stay at the original 10 m supply rise.

    Test or componentSimulation result
    Permission to deliverTwo physical authorizations limit how many seller strokes can be outstanding. A receipt must come from the buyer-side displacement meter before a third stroke begins. The 200 ms rolling comparison can trip the common valve earlier. A separate spill flap can trip that same valve if oil is lost beyond the meter. Neither channel uses the buyer’s weight.
    Service across the named casesWith eight piston pairs down per train, the lowest genuine full-minute rate was 400.044211 m³/h. All 175,680 required paired minutes across four settings passed. Six cases owe 72 hours of sale, five owe 60 hours and nine owe immediate isolation. A minute with the smallest margin has room for only 0.737 L of additional paired shortfall.
    A repeatable stopThe programmed seat lead is 20 ms before the minute reset, with ±5 ms allowed. Stored oil stays behind blanked outlets. A new minute needs fresh displacement and current permission. The system reserves 3.4 hot L per buyer at startup. If the seat closes after the reset, some oil can enter a failed receiver.
    Commercial loadEach of the three cylinders at each buyer undergoes about 146,880 cycles over a full 72 h service duty. The evidence includes refill and valve timing. Seal endurance, seating under pressure and installed performance remain untested.
    How much oil crosses with falsely healthy weights?

    The simulated loss starts while both buyer inlets are flowing at 75 hot L/s. Falling weight contributes no useful signal. The same 10 m installation, cylinder timing and original buyer boundary apply to each of the following locally observable and hidden losses.

    Test or componentSimulation result
    Diversion before the receiving pickupThe meter stops advancing and the common valve starts closing after 35 ms. The ideal crossing is 10.71 reference L. With the modeled trapped liquid and pipe response, 12.91 L crosses. All of it is counted as failed-buyer transfer.
    Diversion after the pickupThe scale still reads healthy and the real inlet meter keeps moving. When the spill reaches the independent flap, the linkage trips after 0.135 s. Including the same hydraulic closing response, 27.77 reference L crosses before isolation.
    Hidden internal pathA downstream diversion that also leaves the spill flap dry admits 1.437143 reference m³ through residual drive and closure. A continuing drive admitted 6.786017 m³ in a separate one-minute test. A motion signal can be truthful while actual receipt is zero.
    Jammed common seatWhen the buyer pickup stopped but the closing seat jammed, outstanding strokes admitted 117.23 reference L in the displacement test. Permitting a third unchecked stroke raised this to 183.76 L. Stored oil in connected branches has a separate release allowance.
    Product, excavation and exterior oil on the same layout

    The resource account includes the 6.8 m curb, overhead gas paths, local gas buffers, two cylinder pads and separate dry spill links. The new machine and receiver pickup assume a mobile surface residue of 0.1 mg/m². Post-failure escape of the bulk liquid remains a separate requirement.

    Test or componentSimulation result
    Delivered productAcross 27,152 sale portions, 0 exceeded the modeled limits. The worst results were 0.6180% water, 3.4937 mg/kg chloride and 0.02031% solids. Both trains together admit 0.665048 L in the worst rolling hour against 0.699 L.
    Both trains through hour 72Conditional exterior oil totals 0.999523 L, leaving 0.477 mL for all further escape. Raising residue on the new machine and buyer pickup to 10 mg/m² gives 1.000257 L. Letting even one percent of the intercepted downstream late transfer reach outdoors adds 0.292 L.
    Site and equipmentCounted excavation is 72,112,952.4 m³ against 72,200,000. It includes an additional 57.6 m³ of machine pads. The buyer pickup fits on the assumed existing support. Additional surveyed foundations, if required, need a separate debit.
    What remains openA sudden loss while accepting oil gives a finite transfer before the shutoff responds. An unobserved downstream path, a leaking seat, new foundation movement or loss of the independent roof can defeat containment. A complete 72-hour end-to-end pass has not been demonstrated for any of the twenty cases.
    Pressure and power at the original lift

    The three-cylinder arrangement retains the original 10 m rise. A cold gas charge and the resistance of the buyer displacement meter both affect the pressure available to push oil into the receiving equipment.

    Test or componentSimulation result
    Buffer and buyer pressureAt 156 kPa absolute cold fill, the minimum computed pressure above the maximum buyer load is 2.054 kPa. The assumed production unit combines the wet regulator and receiving measurement into one restriction.
    Work for 72 hoursThe required healthy schedule uses 7.3525 GJ per buyer of 7.4052 GJ available. Peak continuous pump and charge draw is 29.335 kW against 30 kW. A permanent peak load has a different energy demand.
    Fill toleranceCold settings from 155.5 to 156.5 kPa meet the scheduled work, power and pressure checks. At 158 kPa the scheduled work rises to 7.4121 GJ and exceeds the allowance. A hot sealed charge also fails the registered upper-pressure study.
    Qualification under loadA rig must measure refill, the overlap between strokes, seat closure under pressure and the pressure drop across the complete receiving assembly on a common clock. The simulation assumes separate positive displacement and a finite amount of trapped oil.
    250 L cylinder and chute comparison

    At second 20, oil is already crossing both original buyer inlets. Both scales report normal receipt after failure. The model measures all new crossing from the instant of loss, including oil that moves while the protection is responding.

    Test or componentSimulation result
    Two independent observationsA finite seller cylinder must finish its stroke and earn a new transfer from actual receiving displacement. A second, dry linkage trips from liquid entering the protected spill chute. Oil reached the failed buyer even if it was subsequently captured.
    Matched flow and cutoffThe 250 L cylinders deliver 80 hot L/s per buyer immediately before loss. When diverted oil still moved the buyer inlet meter but reached each spill flap, 27.28 reference L crossed after loss. Holding full flow until both seats closed instead gives 33.37 L in the same test.
    Hidden downstream leakIf both scale and inlet displacement remained credible and the oil bypassed the spill chutes, 1.478095 m³ crossed before the residual motion ended. The original collar under its own 75 L/s waveform admitted 1.442857 m³. Healthy-looking instrumentation cannot distinguish these two physical paths before their signals diverge.
    Time and location of measurementThe inlet meter measures what crosses its own location. A rupture downstream can leave that measurement correct while genuine delivery is zero. The protected chute detects only oil that actually reaches it. A retained bulk inventory and a stable weighing frame provide different information.
    What can deliver zero after loss?

    A moving route selector can warn the buyer inlet while its receiving path is still intact. A sudden internal rupture can occur with the selector stationary and the inlet already passing oil. The original buyer boundary stays in the same place in every comparison.

    Test or componentSimulation result
    A genuine advance signalWith 20 mm of intact sealing travel and a 0.20 m/s change, the valve seated before the route separated. New oil after loss was 0.000000 m³. At 1 m/s, 5.938 L crossed. Without advance motion the same selector permits the whole ten-second tail.
    A finite 35 L pistonWith false weight and the independent receiver motion actually stopped, the rigid-line result was 4.848 L. Including a compliant 5 L local oil volume per buyer raised the result to 8.610 L. The hard stop alone cannot remove stored fluid momentum.
    Why a different fault gives a different answerDuring any interval when the healthy and failed receivers produce the same physical inputs, a controller in the same starting state gives the same output. Positive inlet flow over that interval transfers a positive volume into either receiver. False weight removes one possible distinction. A downstream diversion can remove the inlet-motion distinction too.
    Commercial decisionA rig can establish a credible maximum late volume by recording true failure, inlet flow, seat position, caught oil and pressure on one clock. The evidence supports a bounded-release research prototype. It does not establish zero transfer for a sudden loss at an already-flowing inlet.
    Which receiving equipment can sustain 40% flow?

    Each seller cylinder both fills and empties through separate ports. The cycle pays for opening, closure, handoff and the next charge. The coupled hydraulic calculation checks local pressure, peak drive, stored energy and the volume available at each minute boundary.

    Test or componentSimulation result
    35 L with serial handoffsWith a full start and stop for every stroke, 75 hot L/s peak and a 20 ms handoff, the best gross paired rate is 325.868 m³/h. This misses 400 before any water or other delivery losses. The smaller after-loss figure for this arrangement cannot qualify service.
    250 L working optionAt 80 hot L/s peak, a 20 ms handoff, 156 kPa initial buffer pressure and 8 m lift, the modeled due-minute minimum is 400.203 m³/h. Each buyer requires 27.437 kW and 7.123 GJ. The calculated pressure head remaining is 1.949 kPa.
    Slower proofLengthening the 250 L cylinder handoff to 250 ms limits gross delivery to 394.862 m³/h. A larger permitted dose can help throughput but increases the inventory outstanding when the receiver stops acknowledging.
    Operating exposureSix named cases owe 72 hours of delivery, five owe 60 hours followed by isolation and nine owe immediate isolation. Every case owes 72 hours of containment. The flow figures are full-minute averages. The 20 scheduled controller results and the zero-crossing mid-flow challenge are distinct tests.
    How the spill trip responds to false weights

    A collector-mounted plate deflects under the momentum of diverted liquid. It releases a local shutoff without using buyer weight or software. The model includes flight time across the chute, spring and damper response, linkage travel and the valve’s flow curve.

    Test or componentSimulation result
    Transport delayOn the original 75 L/s waveform, full capture trips the linkage in 0.135 s and admits 25.57 L. An extra second before oil reaches the flap raises this to 168.43 L.
    Partial capture and nuisance tripsAt 10% capture, the original 1.443 m³ crosses. In a separate healthy case, a 20 L/s water stream triggered the plate and interrupted valid service. The plate responds to force and requires a reliably segregated spill route.
    Oil outside the plantEvery litre crossing the buyer is counted against isolation. Its exterior fate depends on the guard. On the original waveform, letting one thousandth of the diverted hot oil escape adds 26.85 mL outside. The routed containment design has less than half a millilitre of unallocated exterior allowance.
    Limit of the closure modelThe rated 80 ms closure assumes an intact close-coupled hydraulic buffer and a specified discharge curve. Trapped liquid can keep moving, a loaded seat can stall, and the assumed jet may miss the plate. Qualification requires simultaneous measurement of original-plane flow, seat motion and the separately collected spill.
    What keeps the failed buyer inlet closed?

    At each buyer the oil stays on the supply side of the existing inlet. A spring-loaded mechanical gate returns to its seat once a minute. Three independent conditions govern the next transfer.

    Test or componentSimulation result
    Catch and fresh travelThe upstream catch must allow delivery. A resettable collar on the dry drive shaft then requires 0.640 reference m³ of fresh forward movement per buyer. Stored entitlement to earlier oil cannot open the gate. The final clutch requires continuing forward motion.
    Matched hidden lossThe catch was silent in both runs. The six-second hold admitted 1.136270 m³ after loss. With the collar the same ten-second residual stroke admitted 0.000000 m³ across the same two inlets. Both gates began the test seated.
    Opening allowanceThe largest residual was 0.565501 reference m³ per buyer. After shaft and index error, the remaining rejection allowance was 29.37 L per buyer. A sustained stroke lets sale begin between 10.57 and 12.16 seconds.
    Service to a healthy buyerEight piston pairs are down per train. All 80 paired replays met their schedules. The lowest required full-minute average was 400.117616 m³/h. All 27,152 sale portions met the grade model. Flow pauses each minute while the gate earns permission to open.
    A taller containment wall with overhead gas passages

    The candidate retains the existing buyer inlet. Below it, a recessed floor and 6.8 m wall contain hot oil and water. Gas flows through upward takeoffs in two staggered rings. A conventional side pipe would be wider than the gap over the wall.

    Test or componentSimulation result
    Waves after receiver lossAt hour 60, oil concentrated on 65% of the usable floor drove the wave to 6.007 m. The 6.8 m wall retained the liquid and preserved 0.793 m freeboard. At 55% initial coverage the wave overtopped the same wall after 1.145 s. Beyond that point outside spill depends on the surviving enclosure.
    Gas pressure at the same loadAt 24 working overhead passages the modeled peak was 170.499 kPa absolute, below the 171.325 kPa ceiling. With seven passages it reached 231.595 kPa. The roof takeoffs and independent supports must survive for either routing assumption to apply.
    Combined resource limitsWith the dry collar, recessed floor, taller curb, pulse cells and overhead gas paths, counted cut is 72,112,894.8 m³ and worst-hour water is 0.665047 L. The conditional exterior oil total is 0.999504 L, leaving 0.496 mL. The three new floor and gas-path fills each assume at most 0.005 ppmv condensables including measurement error.
    Commercial and physical limitsThe 16 m pipe extensions alone add 25,876 tonnes of double-shell steel. The oil budget covers 137,885 m² of cleaned surfaces. The required roof survival, minute seal leakage and independent support behavior remain unverified. The calculations do not yet support deployment.
    What happens when the buyer fails during delivery?

    Each test below measures new reference-volume oil crossing the existing inlet after true loss. Oil already inside the failed buyer, movement inside the seller catch and oil reaching the exterior have separate accounts.

    Test or componentSimulation result
    Loss with the valve openAt second 20 with ten seconds of residual motion, 1.442857 m³ crossed. Disabling the clutch increased this to 2.050541 m³. The clutch must stop flow within 0.10 s after shaft motion ends.
    Timing sweepOf 240 equally spaced quarter-second loss timings, 3 had zero transfer. The largest was 1.442857 m³. These are deterministic design tests and supply no probability of an incident.
    Longer residual or continuing driveTwelve seconds of residual motion from reset admitted 0.219163 m³. With the shaft continuing just as at a healthy buyer, 6.786017 m³ crossed in the first full minute. The controller needs an independent physical difference between those two states to distinguish them.
    Inlet restrictionReducing the available port from 75 to 70 L/s per buyer lowered genuine delivery to 375.731 m³/h. Only 9 of 20 schedules passed.
    Can an independent buyer measurement reduce the transfer?

    A design option alternates two four-cubic-metre seller cylinders. It compares dispensed oil with an independently supported buyer’s mass gain. A deficit trips a second isolation device.

    Test or componentSimulation result
    Independent loss measurementAt second 20 the signal tripped 1.50 s after loss. New oil across the failed inlet fell from 1.442857 to 0.235224 m³. Among 240 offsets, 3 transferred zero. The largest was 0.242777 m³.
    A loss already in progressWhen stored buyer oil began draining before the inlet opened, the second interlock detected the imbalance and admitted 0.000000 m³ of new oil. Oil already in the failed receiver remains an independent containment load.
    False proofWith continuing drive, independent weighing limited first-minute crossing to 0.225815 m³. A spill carried by the same support admitted 6.786017 m³. A jam in the isolation device also defeated the trip.
    Scale and feasibilityThe modeled mass-change uncertainty is 20 kg at each endpoint, about 1.47 parts per million of the full buyer oil mass. Heat, piping thrust, waves and foundation motion act on the same load links. The additional seals, pressure and lot timing require a combined test before this option can earn mission credit.
    Water, exterior oil and construction

    Two dry index cabinets share the existing mechanical drive. Each uses an allowance for a two-by-three-metre foundation. Exterior oil combines all rated sources at the specified fluid purity.

    Test or componentSimulation result
    Water at both buyersRated ingress stays at 0.648383 L in the worst rolling hour. A single additional 60 mL release in that hour gives 0.708383 L and exceeds 0.699.
    Oil reaching the exteriorThe dry cabinets and rated plant sum to 0.996368 L over 72 h. Only 3.632 mL remains. At 10 ppm condensable oil in escaping receiver gas the result is 1.028072 L. The rated calculation uses 1 ppm.
    Earthworks and driveThe two foundations add 9.36 m³, for 72,070,621.90 m³ against 72,200,000 m³. Shaft loading assumes a 2 Nm limit per dry index. Actuating the loaded heads requires a separate local energy source.
    Sealing acceptanceA closed seat leaking 0.1 mL/min at each buyer would transfer 0.864 L in 72 h. The zero-crossing run assumes tight seats and excludes trapped liquid beyond them. Measure seat seepage and weigh the independent buyers and catches on the same clock.
    Can the pulsed inlet deliver at pressure?

    A hydraulic option places two sealed nitrogen buffer cells upstream of each buyer gate. It retains a 14 m wet transfer line and a separate 315 m dry witness shaft. One 10 m³ gas cell per buyer may be unavailable.

    Test or componentSimulation result
    Drive and storageAt 10 m rise, one working cell can accommodate the modeled charge before the late opening. The two buyers each need their own drive, buffer and shutoff. A rising line, a partly obstructed buffer throat or a mistimed crossover changes the required hardware.
    Operating envelopeAt the late opening, the pressure model uses a 0.25 m pulsed column. At 10 m rise its demand is 28.22 kW per buyer. Upstream and local faces have different pressure ratings. The model assumes the diaphragm moves freely and the gate can carry differential pressure.
    Equipment ledgerThe buffer layout gives 0.648394 L/h and 0.996461 L outside under rated assumptions. Its foundations add 134.4 m³ to the comparison installation. Dry-cabinet pads and any mass-balance upgrade require their own allowances.
    Failed controlsOne 75 mL wash pocket raises ingress to 0.723394 L/h. A one-square-micrometre effective opening at each buyer that also leaks outside gives 1.000492 L over 72 h.
    How tight is the drive and handoff margin?

    A physical inlet option uses a two-plunger meter with 35 L pockets. An interlocked distributor meters the oil and prevents a charged upstream buffer from emptying through a stopped gate.

    Test or componentSimulation result
    Pressure and stored workAt 10 m rise the late-opening trial needs 7.327 GJ per buyer against 7.405 GJ available. At 15 m the same equipment needs 8.538 GJ. A lower usable stored energy or higher lift can end service early.
    Switching speedThe two plungers switch 102 times per minute. The average additional interruption allowance is 2.312 ms per switch. At 20 ms, gross mechanical capacity falls to 393.353 m³/h before water, losses or valve ramps.
    Inventory and collectionAfter filling the four cells, meter and new passages, the remaining unallocated source stock is at least 6.078 m³ per buyer. With one intact 80 m³ catch per buyer and an open route to it, static collection headroom is 24.862 m³ each.
    Construction testCycle the distributor through a full delivery day with one buffer isolated. Measure the valve position, buffer pressure, pump work, buyer volume and every crossover interruption on the same time base. The assumed millisecond handoff and zero-flow seal are consequential procurement requirements.
    Where does the oil go at hour 60?

    Cases 12, 18 and 19 lose a loaded receiver after sixty hours of sale. Each train, pressure rule and gas-access assignment was replayed to the moment of loss. The protective wall and its gas system must accept the same simultaneous event.

    Test or componentSimulation result
    Inventory actually presentEach buyer had received up to 12,214.83 reference m³ before loss. At the specified hot expansion this is 12,825.57 m³. The model admits 1,531.37 m³ of separate intercepted water in the first two seconds. Unused seller stock stays upstream.
    First two secondsWith the drains blocked the local structure needs 14,356.94 m³ of usable capacity per buyer. Even allowing the maximum gravity drainage throughout both seconds leaves at least 10,940.98 m³ locally. The gas trial conservatively holds all existing liquid.
    Independent retaining wallA 5.5 m wall within the 5,000 m² buyer footprint reserves 0.75 m freeboard and 600 m³ for debris. With 80% usable area, pooled liquid reaches 3.96 m. At 60% the wall cannot hold the modeled load with the required freeboard. Its roof and supports need independent load paths after the original vault fails.
    Gas and structureAfter debiting wall, debris and obstructions from gas space, a flush floor and 30 open gas passages peak at 167.832 kPa against 171.325 kPa. With 24 passages, pressure peaks at 178.866 kPa. At 36 passages with thermal contact lost, pressure and gas temperature exceed their limits. These results depend on an intact new shell.
    What does the combined installation require?

    These totals book the 5.5 m retaining wall, 1.20 m floor recess, dry collar pads and four pulse cells together. All three nitrogen charges for the new floor volume are counted in the same hour. Separate failures can still defeat these resource limits.

    Test or componentSimulation result
    Earthwork and waterThe combined counted cut is 72,104,260.9 m³, leaving 95,739.1 m³. Rated ingress including the pulse cells and two purge fills is 0.654478 L in the worst hour. Both buyers share the 0.699 L limit.
    Exterior oilWith each new floor gas charge limited to 0.010 ppmv condensables including analyzer error, plus the separate pulse cell, cabinet and liner charges, the total is 0.998779 L in 72 h. Only 1.221 mL remains for uncharged loss. This needs independent containment of every wetted surface after the event.
    Work and deliveryThe depressed-floor option at a 10 m supply rise needs 7.3277 GJ per buyer including dry index work, against 7.4052 GJ available. The calculated minimum static delivery-head margin is 2.018 kPa. Splash, entrained gas and peak transient pressure can still affect delivery.
    Alternative floor levelWith a flush floor, full inventory adds about 9.41 kPa at the buyer. At 10 m rise the calculated hardware can accept only 4.762 kPa above the original buyer pressure. An 8 m rise with 162 kPa gas fill passes the separate pressure, power and work calculation; siting the upstream supply at that elevation needs its own construction account.
    Can the retaining wall coexist with delivery?

    The proposed retaining structure displaces part of the operating pool. Its normal oil level and remaining gas space change the pressure required for delivery and for isolation.

    Test or componentSimulation result
    Flush floorAt hour 60 the reduced area adds 7.820 kPa at the existing nozzle. The pulse-cell option has only 2.018 kPa spare. These configurations cannot inherit each other’s passing delivery result.
    Depressed floorLowering the floor by 1.20 m keeps the healthy transfer nozzle and gas roof at their existing elevations. The static nozzle head is 3.477 kPa lower at hour 60 and 1.886 kPa lower at full source inventory. An initially unsubmerged nozzle can entrain gas and change product quality.
    Gas acceptanceWith the lowered floor and 30 open gas passages, the hour-60 pulse peaks at 162.908 kPa. With 24 it reaches 172.112 kPa and exceeds the 171.325 kPa limit. Foundation survival, local pressure waves and exterior leakage still determine the full mission.
    ResourcesThe lowered-floor study books 72,104,127 m³ of paired cut. Its additional dry gas raises rated water to 0.650411 L/h. Pulse-cell foundations and wet inventories belong to a separate equipment account. Containment also depends on sealing the whole perimeter through hour 72.
    Which end-to-end cases have passed?

    The twenty cases include six recoverable incidents requiring 72 hours of sale, five requiring 60 hours followed by isolation and nine requiring immediate isolation. Each also owes 72 hours of containment.

    Test or componentSimulation result
    Registered operating checksThe selected collar met flow, sale grade and registered stop requirements in 20 of 20. Each of the 56 scheduled stopping variants also passed with the upstream pickup silent at reset.
    Receiver collapseCases 12, 18 and 19 require coupled retention of liquid and gas. At the design full load of 16,678 m³ per buyer, at least 13,262 m³ must still be held locally after two seconds, even at the maximum assumed gravity rate. The amount on hand at incident time is a separate input.
    Ground and fluid conditionsAt +0.2°C and 25 mm of relative movement the modeled hot-water head is 1.341248 kPa above saturation. At 40 mm, cases 12, 18 and 19 miss the 1.33 kPa gate. Water, condensable oil and installation movement all affect the result.
    Whole-mission score0 of 20 demonstrated every requirement. Seventeen have no assigned loaded-receiver collapse. Those cases still require a compatible pressure, support and exterior-release model on the selected installation. A model pass and a physical qualification are separate decisions.
    How water stays outside the sale line

    Six exposed gas passages serve two buyers. Each passage has two independently chilled, dry steel condensers. The model loses one condenser at every passage. External strain pickups sense the sale pipe through intact metal. Four water-filled instrument connections are eliminated.

    Test or componentSimulation result
    Water at the buyerAt 88°C saturated inlet air and 10 Pa inward pressure, the six passages can admit 7.74 m³ of air per hour. Steel initially at 2°C stays below 10.9°C at the cold surface through a two-hour assay plus 72 h of service. Condensate settles in blind collection pots.
    Severe rain and dry gasThe trial charges a 200 mm storm collected over 16 times the opening area, up to 10% of that rain in fine mist, 0.2 ppmv water in all added gas, and one part per million of the 161,196 L falling into the outer galleries. The combined worst hour is 0.648383 L. Shortening every dry outlet bore from 100 mm to 1 mm gives 0.699865 L.
    Limits of the weather testDoubling the gallery rain fraction gives 0.821 L. If all the vent rain remains as fine mist the total rises to 2.127 L. A downstream wet opening can bypass every condenser.
    Actual productAssigning the complete 6.763 L over the full exposure to each sold portion in turn, all 27,152 portions met the modeled grade. The highest water fraction was 0.6175%. The final stock allowance is 6.262 m³ per buyer in the limiting schedule.
    Pressure relief without waiting for a valve

    A four-metre enclosed extension over each buyer connects continuously to 48 pressure-matched gas passages. Twelve receiving shafts stay below each buyer for gravity capture. Thirty-six blind gas vessels move above grade and supply no gravity storage for oil.

    Test or componentSimulation result
    The first two secondsAll gas spaces start at 105.825 kPa absolute. At the assigned 0.15% flash by mass, a full buyer peaks at 150.905 kPa with one passage unavailable. With 18 unavailable it reaches 168.167 kPa. The pressure ceiling is 171.325 kPa.
    Failed pressure testsWith 24 unavailable the peak is 177.821 kPa. With all passages blocked it is 292.298 kPa. With 1% flash, pressure reaches 411.518 kPa and gas reaches 132.50°C. At 30 available passages the passing flash limit is close to the assigned 0.15%; the crude's actual gas release is unmeasured.
    Liquid remaining at the buyerAfter one deep shaft is lost, static capacity exceeds the hot-liquid allowance by 2,903 m³ per buyer. Even with 4 m of gravity head, moving all the hot oil takes at least 8.87 s. The successful native gas pulse starts with oil still held at the buyer.
    A second basinA separate closed 110 m square basin retained liquid for 9 s with drains blocked. Its corners intersect the selected gas-vessel ring. It needs 27,650 m³ of separate excavation and a compatible gas path. This basin earns no credit in the selected installation.
    Where the oil goes after a line break

    A closed outer gallery surrounds the entire short product line and both end connections at each buyer. Cooling plates inside each gallery absorb heat without adding a pressure penetration. The same pair of galleries is used for the leakage, temperature, water and excavation accounts.

    Test or componentSimulation result
    Blocked drainsThe loaded guard and line send 56.232 m³ into one gallery. With the drains blocked, hot rain and all modeled steam heat included, a two-second pulse peaks at 1006.28 kPa absolute and 120.00°C. Losing half the thin-plate area raises the temperature to 147.01°C.
    Exterior oil through 72 hoursAt an assumed 2 ng/L condensable oil in the installed auxiliary water, the conditional total is 0.996368 L. It includes both short liquid leaks, one part per million of the gallery flash and one part per million by mass of the main receiver gas that escapes in the 72 h comparison. Its 2,853 kg of escaping light hydrocarbon makes composition decisive.
    Failed environmental controlsTen parts per million of the escaping main-receiver hydrocarbon condensing or carrying oil gives 1.028072 L. Retaining the original 5 ng/L auxiliary fill gives 1.030034 L even at one part per million. A continuously supplied path through all barriers releases 67.148 m³ in the separate 72 h control.
    Acceptance thresholdOnce the other listed charges are paid, 2.031 parts per million by mass of the escaping main-receiver hydrocarbon would exhaust the litre. The actual condensable and aerosol share and the installed liquid purity have not been measured. The 120°C replenished-gas comparison also exceeds the receiver pressure ceiling before hour 72.
    How the receiver knows when to stop

    The real buyer port and the original qualified stock are retained. The mechanical shaft permits flow when the buyer appears able to accept it. An internal loss can leave the port engaged and show the same movement as a healthy buyer.

    Test or componentSimulation result
    Every required delivery minuteBoth gas-access assignments and both pressure rules were run with eight piston pairs unavailable on each train. The minimum genuine oil rate is 400.432 m³/h after water, solids, returned oil and two short exterior losses. Six incidents require all 72 h of service, five require 60 h, and nine require immediate isolation.
    An unannounced lossCases 9 and 12 admit the same first 10 s of crank movement after hour 60. If receipt pressure and engagement also match, waiting for a difference limits the healthy minute to 348 m³/h on the original inlet. Meeting 400 then requires at least 0.867 m³ during that shared interval.
    Two physical cutoff trialsA larger inlet with a periodic cam meets all registered delivery schedules when loss coincides with a reset. Moving the loss ten seconds into the cycle delivers 2.262 m³ late. A toothed displacement lock limits late delivery to 6 L when actual receipt motion stops. An internal leak that keeps the receipt piston moving defeats that limit.
    Where run-on belongsThe registered stop requires zero new oil crossing into the failed buyer. Motion can continue into a finite seller-owned catch on the supply side. The simulation must show which route takes the oil. Crediting a sale or sending oil through a failed buyer cannot be corrected by relabeling it after the event.
    Excavation and the hot-water limit

    Relocating the blind gas storage reduces excavation while increasing the load on surface foundations. Pressure at the hot-water reference changes when the new foundations move relative to it.

    Test or componentSimulation result
    Counted worksAcross both trains and both buyers, the selected layout uses 72,070,613 m³ against 72,200,000 m³. Remaining allowance is 129,387 m³. It includes the closed gallery, cooling supports and all twelve condenser foundations.
    Surface demandThe gas installation reserves 8.26 additional hectares of surface plot. The design identifies 57,248 tonnes of additional gas-system steel. The dry condenser stores add 720 tonnes of steel. Land, foundation motion and access remain material design constraints.
    Hot-water pressureThe native floor is 2.099 kPa above saturation. A 0.2°C hotter film plus 25 mm of additional relative elevation leaves 1.341248 kPa, above 1.33 in 20 of 20 cases. With 40 mm the minimum falls to 1.194149 kPa and 3 cases miss.
    What a site test must establishMeasure the pressure and level at the hot-water reference under the installed loads. Check the worst local elevation change against the thermal trial. The amount of excavated rock alone cannot establish that the water margin survives.
    A rain roof over the transfer gallery

    A welded outer roof sheds water before it enters the gallery around the oil line. It has its own supports and four free discharge edges. The oil pipe and the gallery wall remain intact. This hydraulic trial compares a design option with the selected receiver.

    Test or componentSimulation result
    Storm and openingsEach roof collects runoff from 443.3 m² at 200 mm in one hour. The modeled seam openings on each roof together have the area of a single 0.15 mm diameter hole. Every drop passing those openings is charged to the product. The calculation also retains 0.476 L from the other water sources.
    Two working discharge edgesThe total is 0.626802 L across both buyers. With one edge open it is 0.654420 L. Both are within 0.699 L. The one-edge case can accommodate an equivalent seam opening only up to 0.168 mm per roof.
    Blocked edges or direct sprayAll edges blocked gives 0.758700 L. One edge open with a 0.30 mm defect gives 1.189736 L. Adding 0.25 L of direct spray below the roof to the two-edge trial gives 0.876802 L. Each exceeds the limit.
    What the trial coversThe simulation screens rain drainage and leakage over one hour. It leaves wind-driven entry, roof deflection, support loading, exterior residues and interference with the gas passages open. The selected excavation and 72-hour delivery figures exclude this optional roof.
    Can a stopped buyer safely receive run-on?

    Oil movement, seller-side capture, crossing into the buyer and exterior release are four separate measurements. They can give different answers in the same shutdown.

    Test or componentSimulation result
    Prescribed stop replayThe 56 stop comparisons recorded zero new buyer oil and up to 1.160 m³ in the seller-side catch. The underlying simulation switches routes when the event occurs. The physical equipment must direct oil to that same destination.
    Port already blankedA physical blank ahead of the failed port put 1.229 m³ of expanded liquid into the upstream catch and zero across the buyer boundary. This case assumes the blank is in place before loss and the catch is connected.
    Hidden internal lossA disappearing receipt signal with a finite spring closure admitted 11.40 L at reference conditions. If an internal leak kept the return moving, 1.171 m³ crossed into the failed buyer. The intact downstream enclosure retained the oil. A one-percent bypass of the guard would add 12.29 L outside.
    An upstream trip signalAll 28 stopping train histories accrued over one litre of missed flow at the upstream station by five seconds. The enlarged buyer inlet leaves at most 8.29 s to transmit this signal after allowing for local closure. A hidden loss can preserve upstream flow. Signal travel and available pressure at the higher peak rate still need a combined test.
    Can a separate closed basin take the whole release?

    A separate 110 m square basin receives liquid while the gas vessels move outward. Greater gas space reduces pressure, but it also puts more water-bearing gas next to the product.

    Test or componentSimulation result
    Plan and earthworkShifting the ring clears the basin corners by 0.22 m in plan. The 16 m basin layout uses 72,127,710 m³ of counted excavation and leaves 72,290 m³. Construction tolerances, settlement and piping clearance remain open.
    Short pulseAt least 13,262 m³ per buyer needs local storage after two seconds even at the upper gravity drain rate. The sealed 16 m basin reaches 214.95 kPa absolute and 167.41°C at full access. The limits are 171.325 kPa and 120°C.
    Gas space and waterThe closed equilibrium model needs 290,619 m³ of readily accessible gas space per buyer to meet both endpoints. With all that space reachable, water is 0.756 L at 0.2 ppmv moisture in the added gas and 0.659 L at 0.02 ppmv.
    Partial accessIf a quarter of the gas space can participate, the calculated total height rises to 182 m. Even the dry-fill endpoint reaches exactly 120°C. A larger structure, access to the gas within two seconds and its exterior containment through hour 72 remain unverified. The earthwork estimate above applies only to the 16 m option.
    A six-second hold before buyer delivery

    The buyer valve closes at each minute boundary. A volume pickup in the upstream catch trips at one litre and latches shut. A six-second hold gives that signal time to reach the valve before it can open. The buyer needs a larger inlet to deliver the accumulated oil in the rest of the minute.

    Test or componentSimulation result
    Input to the controllerAll 28 stopping train histories exceeded one litre of catch inflow by five seconds. The cumulative catch inflow stayed at zero throughout all 22 train histories with service due. The comparison uses physical volume as its input. No incident number is sent to the controller.
    Time to isolateThe compared pilot line is 300 m long. At 700 m/s the model allows 0.429 s for transmission and 0.047 s for local closure. The six-second hold leaves about 0.52 s after a five-second detection. These times assume that the pilot remains connected and the valve moves under load.
    Prescribed dutyThe controller met the flow, stop and lot checks in 20 of 20 registered cases. The lowest qualifying rate was 400.118 m³/h. The largest new transfer across a required stop was 0.000000 m³ at reference conditions. The screen charged sale-side losses and preserved the finite stock.
    Outside the registered timingThe opening rule responds to fluid arriving at the upstream catch. A hidden loss confined to the buyer can keep this catch dry. A slow signal can also arrive after the valve opens. A whole-case claim requires the buyer, inlet drive, water barrier, modified foundations and exterior capture to work together through hour 72.

    Reference installation

    9 / 20Complete reference cases
    403.49Lowest native delivery · m³/h
    0.9987 LReference exterior oil
    71.898 MReference excavation · m³

    Reference installation. 9 of 20 registered missions pass end to end. All eleven delivery cases meet their hydraulic schedules. Their 44 m³ lots still lack a verified limit on water entering during the two-hour assay, subsequent storage and transfer to the buyer. 20/20 support checks and 20/20 exterior-oil checks passed. With 73% gas access on either train, the lowest water margin is 2.099 kPa. The exterior oil allowance remaining is 1.280 mL across both trains.

    Dry buyer receiver

    Equipment comparison

    The wet drive ends at a blind wall. A solid shaft transmits movement to a pump next to the buyer. Four sealed gauge capsules contain a finite amount of water even when all four fail.

    400.438Lowest genuine flow · m³/h
    0.530%Worst delivered-lot water in the storm
    0 / 20Complete dry-receiver cases

    Both buyers share a limit of 0.699 L in any rolling hour. The upper bound for an instantaneous burst is undetermined. The case selector below sets the operating duty.

    View all 20 dry receiver outcomes
    CaseRequired deliveryFull receiver outcome
    01Immediate isolationOpen
    02Immediate isolationOpen
    03Immediate isolationOpen
    04Immediate isolationOpen
    05Immediate isolationOpen
    06Immediate isolationOpen
    07Immediate isolationOpen
    08Immediate isolationOpen
    0972 hoursOpen
    1072 hoursOpen
    11Immediate isolationOpen
    1260 hoursOpen
    1372 hoursOpen
    1472 hoursOpen
    1560 hoursOpen
    1672 hoursOpen
    1760 hoursOpen
    1860 hoursOpen
    1960 hoursOpen
    2072 hoursOpen

    Incident record

    Onset36 h72 h

      Challenge the design

      These controls test excursions beyond the stated design assumptions. Each result identifies the measurement and where it applies.

      Train instruments for the selected incident

      Eight native runs cover both gas-access orientations and two pressure-control rules. Values are simulated. The installation-wide grade debit is shown separately in the pressure trial.

      TrainGas access A/BPressure ruleOil °CNitrogen °CWater margin kPaStock at 72 h, m³

      How does the buyer keep water out?

      The wet drive ends at a blind pressure wall. Across 315 m, a solid shaft conveys piston movement through magnetic couplings. A weight at the buyer supplies the pumping work. Only a short, primed local pipe carries sale oil. Four sealed pressure gauges have no connection to a water supply.

      ComponentReceiver model
      Finite gauge inventoryEven if all four metal gauge capsules rupture together, their dimensions limit external water to 0.113 L across both buyers. The model also condenses the entire original and added nitrogen moisture charge, 0.170 L, into that hour.
      Gas pressure through hour 72Three weighted holders per buyer begin with 1,300 extra m³ each. Two surviving holders can travel 3.8 m. Across 691,200 train-minutes the minimum cold gas reserve was 553 m³. A common wet pipe around the solid shaft would defeat the separation.
      Rain and condensationDry weather gives 0.299 L in the worst rolling hour. The eight-times rain test gives 0.555 L; sixteen times gives 0.811 L. The limit is 0.699 L across both buyers in any rolling hour. The study assigns no instantaneous flow bound to a ruptured capsule.
      Retained construction waterThe eight-times rain trial leaves 144.2 mL for all other water that reaches the oil that hour. In a 72-hour preinstallation drying comparison, a 2 mm pool with a 10% open escape area dries; at 5% opening the modeled residue is 6.05 L. A closed pocket can release its entire contents later.

      Can the last delivery still be sold?

      Two solid timing shafts transfer a displacement signal. Two independent falling weights per buyer are charged before the incident. With one weight unavailable, the surviving weight drives the original authenticated stock through the actual buyer port.

      ComponentReceiver model
      Minimum genuine oilEight pairs are unavailable on each train. The 1.0048 drive ratio delivers at least 400.438 m³/h after charging the whole rain-hour ingress to one minute, the fluid assay tolerances, and oil seeping back into the guard. The working weight supplies 7.405 GJ against 6.439 GJ in the drive screen.
      Original stock and qualityBoth the line prime and 33.535 m³ of make-up per buyer come from original stock. With the articulated extension charged, 6.262 m³ remains in the limiting buyer. The one-hour storm gave 0.5296% water at most over 27,152 full or partial transfers. An independently primed portion exposed to an unaccounted 20 L exceeded the 1% specification.
      Physical disconnectThe two flush heads close in 46.6 ms. With 0.20 m of retained travel, the 2.5 m/s pull leaves 33.4 ms and zero new sale in that separation trial. One closed catch per buyer can be lost.
      Hidden endpoint lossA loss inside the receiver can leave the port engaged. The shaft can then move 1.171 m³ across the two buyer ports after the required stop. Its motion alone cannot distinguish a buyer still accepting oil from a hidden loss.

      Can the retrofit contain a loaded loss?

      The candidate adds covered wet collectors, separate gas holders, double-shell catcher shafts, and closed flash-gas vessels. The total-loss test charges the exposed oil, displaced nitrogen and flash gas to the same receiving installation.

      ComponentReceiver model
      ConstructionIdentified excavation is 72,194,956 m³ across both buyers and both trains. That leaves 5,044 m³ for unbooked foundations, cooling hardware and site preparation. Extra rock removal can exceed the limit.
      Exterior oilOriginal oil sources, receiver and line surfaces, the new holder rims, and both sets of cooling plates total 0.999889 L before any new bulk oil or entrained vapor escapes. Only 0.111 mL remains. Oil left on a service-wetted pipe must be captured separately.
      Two-second flashWith 3.4 million m² of dry plates per buyer, the two-region model at the specified heat transfer coefficient and insulation value of 0.025 W/m²K starts the plates at 44.3°C after 72 hours. Its 1% flash peaks at 131.0 kPa absolute and 120.0°C. With insulation at 0.10 W/m²K the gas reaches 147.1°C.
      What prevents acceptanceThe first small gas space at the buyer can heat and pressurize before the rest of the bank is accessible. The first seconds, the oil-wet exterior paths and hidden losses with the receiving key still engaged require evidence on this installation.

      What happens during a sudden receiver loss?

      The first gas space available at a loaded buyer is only 1,253 m³. The pressure in that space and oil crossing the outside of the transfer pipe determine whether the larger receiving banks can protect the installation.

      ComponentReceiver model
      Pressure in the first gas spaceAt full load, a two-second release with 0.15% flash by mass reaches 118.874 kPa absolute and 101.75°C when the modeled ports begin opening at 0.10 s. The limits are 171.325 kPa absolute and 120°C. At 0.30 s, pressure reaches 288.112 kPa. The measured opening response under load is unknown.
      Transfer pipe jacketOne isolated compartment holds 42.10 m³. It contains the modeled line inventory with 6% flash at 970.7 kPa absolute against a 1,200 kPa limit. If the whole dock guard empties into it, the minimum space needed is 59.37 m³ even before flash.
      Oil escaping both barriersWhen the modeled oil path continues through both walls, 6.03 mL escapes before closure. The nominal oil headroom is only 0.111 mL, before the optional jacket contributes another 0.0006 mL of residue. On these inputs the one-litre limit is exceeded.
      Evidence requiredA full receiver test must record pressure at the first gas space and the opening delay, weigh everything crossing the exterior boundary, and independently measure what reaches a disabled endpoint while its transfer joint remains engaged.

      What changes when the gas loss swaps trains?

      Each physical train was run once with 73% of its gas storage accessible and once with 100%. Two pressure-control rules were replayed separately for each assignment. The same two native incident records supplied the train histories.

      TestSimulated result
      Train A at 73%, train B at 100%All 40 thermal states satisfied their limits. The pair supplied at least 403.492 m³/h across 87,840 due minutes, counting both pressure rules. No new volume crossed after a required stop.
      Train A at 100%, train B at 73%All 40 thermal states passed. The independently replayed minimum was 403.492 m³/h with zero missed due minutes. Both assignments included eight unavailable piston pairs per train.
      Independent heat calculationRefining the time step from 10 s to 2.5 s gave a peak of 116.068°C and 136.258 kPa absolute. The limits are 120°C and 150 kPa. The initial liner is 87°C and the outer boundary is held at 120°C.
      Water at the exposed surfaceThe 16 mm comparison grid gives 1.34757 kPa in each orientation. With 8 mm supports, case 18 on the fully accessible train governs at 2.09922 kPa. The calculation combines the worst motions and pressure disturbances.

      How much margin does the finer grid buy?

      The selected grid supports the dry side of a 96 mm pressure face. Its shorter unsupported span reduces motion transmitted to the exposed water. Redistributing the same steel keeps the modeled gas space, liquid volume and excavation constant.

      TestSimulated result
      Water pressure in the rated designFree-surface margin rises from 1.348 to 2.099 kPa. The confined crown gives 2.382 kPa. All 20 cases pass at the specified air pressure, water-film temperature and backing stiffness.
      Construction and exterior oilThe model needs 4.387 billion support contacts per train, with 0.298 mm net webs. The added 4,973,317 m² of metal is charged at 0.10 µg/m², adding 0.614 mL to the paired exterior total.
      Common loss of supportWhen four adjacent spans bridge the missing contacts, free-surface margin falls to 0.898 kPa against 1.330 kPa required. The peak stress-to-allowable ratio is 2.706. All twenty fail this comparison.
      Temperature and weatherA further 0.2°C rise leaves 1.586 kPa across all 20 cases. A 0.5°C rise or a separate 2.0 kPa drop in atmospheric pressure defeats cases 12, 18 and 19. At the rated temperature the model needs at least 100.556 kPa ambient.
      Web thinningA further 0.15 mm of metal loss leaves 1.935 kPa of water margin. The web buckles at a stress-to-allowable ratio of 1.246, failing the structural check in all twenty cases.

      Can the buyer separate a short water pulse?

      The original water limit is 1% by volume in each assessed 44 m³ lot. A litre taken at the outlet can reveal a concentrated leak. This illustration compares local exposure with the result for a separate five-minute batch.

      TestSimulated result
      Five-minute batch transferFour 20 m³ cells per buyer, one unavailable. With immediate mixing and no retained water, all 44 flow and pressure combinations delivered at least 401.323 m³/h. The highest batch water content was 0.613%.
      Same readings, different productBoth histories carry 70.670 L of water in the batch. Uniform mixing gives 0.420% locally. Concentrating 59.55 mL of incoming water into one litre gives 6.350%. Both histories report the same assay.
      Retained water and queued oilA delayed 100 L water release gives 1.0123% even after complete batch mixing. If its release mechanism keeps running after hour 60, the queue can deliver another 67.249 m³ across both buyers.
      Oil-wet membraneOf 180 ideal pore, viscosity and fouling combinations, 111 supported flow and water rejection at 500 Pa. The strongest ideal water barrier was 0.300 MPa. None held the direct 3.520 MPa water differential. A leak downstream also bypasses the membrane.

      Can matching crude act as the barrier fluid?

      Two charged circuits feed previously qualified product oil between the sale passage and its external water guard. A pressure advantage can keep water out while the fluid entering the sale passage still has the commissioned composition.

      TestSimulated result
      One working supplyWith one circuit unavailable and 100 mm² of effective supply opening, the simulated junction holds 19.601 MPa against 16 MPa of water. No reverse water enters in this comparison. The surviving local circuit needs 67.85 L over 72 hours, including the oil used before the trip. Deducting guard oil from delivery gives 400.178 m³/h of original hydrocarbon in the favorable comparison.
      Restricted supply at a wet jointWith only 2.5 mm² of effective feed, 80.45 mL enters at one buyer during the initial pulse. A one-litre sample then contains 8.431% water. Assessing the original 44 m³ lot requires accounting for all water reaching that lot.
      Inventory and environmental exposureThe design needs 43,612 m³ of separately counted product oil to fill the protective system. A direct opening releases 20.43 mL during initial closure. Added to the selected installation this reaches 1.019148 L before any further losses.
      Acceptance evidenceA positive result requires the minimum open supply area at the actual wet joint, independent pressure during closure, and capture at every outer exit. The coupon and storage calculations do not qualify the final buyer or provide new end-to-end passes.

      Will the last lot still qualify at hour 72?

      Some reserve oil finishes its two-hour assay before the incident, then waits for its turn to move. These trials follow the actual time each lot leaves storage and enters the customer. Each uses the same original oil and debits for retained water, gas moisture and upstream transfer.

      TestSimulated result
      The final partial deliveryIn case 9, train A sells 16.172 m³ at the end of hour 72. After charging 20 L of retained water and the other modeled sources, only 50.35 L of additional water can reach that portion.
      A leak that continues during storageAt the modeled differential pressure the limiting allowance is 0.699 L/h over 72 hours. An effective area of 0.003 mm² yields 0.974% water at worst. All 11 operating groups meet the chemistry limits at that area.
      Six full-duration services missAt 0.004 mm², 48 portions exceed the limit. Only the five groups ending service at hour 60 still meet it. At 0.10 mm², 23,896 of 27,064 portions fail and the worst is 10.149% water.
      What decides the outcomeThe effective areas represent flow at one specified pressure. They are sensitivity inputs. To close the eleven delivery cases, the model needs an independently supported upper bound on all water reaching the same sold portion and a pressure history that still delivers 400 m³/h. The customer retrofit must also retain the registered exterior and total-loss performance.

      Can the actual buyer run dry?

      Each real buyer receives the oil into its original tank. The design drains its water-backed equipment before service and collects the displaced dry nitrogen in weighted gas holders. The oil still crosses the buyer’s original inlet. The final partial delivery is scored on the amount sold.

      TestSimulated result
      Isolated lot and measured waterAcross 27,064 replayed full and partial deliveries, 20 L of trapped water and a continuous equivalent opening of 0.10 mm² produced at most 0.964% water. All 11 operating cases met the modeled chemistry limits under this condition.
      What still failsA single 100 L pocket of retained wash water caused 48 portions to fail. Only 5 of 11 operating cases then met the chemistry limits. With the original wet opening under liquid-column pressure, 27,064 portions failed. An empty backing circuit still leaves other sources of water.
      Acceptance at the buyerThe smallest sold portion was 16.172 m³. Its unassigned water budget, after charging moisture from both gas inventories, is 70.35 L. The collection test must include all trapped and newly admitted water through the two-hour hold and up to 14 minutes of discharge.
      Total loss at the converted receiverThe air-filled enclosed catcher requires 157,335 m³ per buyer. A fully excavated pair exceeds the remaining cut by 12,688 m³ before access or lining. Gas storage, tank loads, stop behavior and exterior oil would need to pass on the converted installation.
      Mild vacuum at startupAt 90 kPa absolute, each enclosed catcher needs 106,741 m³. Both fit with a 20% construction allowance and 45,804 m³ remaining. The shell must carry 11.325 kPa inward initially, local ground loads and 70 kPa outward in the hot-loss calculation. Vacuum retention and external water ingress remain open.

      Which lot reaches the buyer?

      A physical 44 m³ cell holds the original reserve for a two-hour quality check. Three one-litre samples represent that cell. Product identity and downstream additions must be traced to the actual buyer for each transfer, including the last partial lot.

      TestSimulated result
      Original reserveEach buyer has 334 full indexed lots in the stock calculation. Case 20 drives the pistons with off-spec incoming oil. The sale side must contain only its authenticated original reserve and bounded additions. False samples and references cannot verify a broken separation.
      Water, chloride and sedimentAcross 27,064 sold portions in 11 operating cases, a two-second high-pressure exposure followed by density head yielded maxima of 0.927 vol% water, 2.982 mg/kg organic chloride and 0.0209 mass% solids. The limits are 1%, 5 mg/kg and 0.05%.
      Water while the cell waitsWith the wet connection open during the two-hour hold, maximum water rose to 8.242%. Sustained high pressure during discharge alone reached 9.620%. All 11 operating cases fail these alternatives.
      A later slug reaches one lotWhen 300 L of trapped water displaces oil containing 0.50% water in one 44 m³ lot, its mean rises to 1.178%. A tank average after the sale cannot certify what crossed the custody boundary earlier.

      How much water can the buyer tolerate?

      The actual receiver begins with 16,400 m³ of backing water behind a diaphragm. Its transfer into sold oil is a separate possible source from the upstream guard leaks. The common-tear area and pressure across it remain unbounded in the selected installation.

      TestSimulated result
      Six cubic metres left in each tankSix m³ of the original reserve at each actual buyer limits whole-tank water to 0.840% from the modeled field leaks alone. The starting charge earns zero delivery credit. This alternative needs a prospectively agreed tank assessment and independent protection from the receiver's backing water.
      A subdivided water receiverWith 6 million independent water circuits per buyer, fully emptying 32 circuits releases 112.81 L. The model adds 61.94 L of new field water per swept lot. Starting at 0.50%, each 44 m³ lot tolerates 221.11 L of water substitution.
      An obstructed return or a common tearOnly 46.36 L of additional, previously trapped water fits in that lot. A common connection between more circuits defeats the tested limit. The exterior-oil subtotal is already 0.999891 L before the remaining equipment is charged.
      What the present register creditsAll nine immediate-isolation cases meet their assigned gates. The six 72-hour recoveries and five delayed shutdowns still require a proven transfer of on-spec product at the actual buyer. These separate receiver trials add zero complete cases.

      Can a measured stroke or a weigh lock close the gap?

      Both devices use the original prequalified inventory once. Each needs a positive cutoff at the actual buyer when delivery must stop.

      TestSimulated result
      Finite starting strokeTwo 25 L spring-loaded cylinders per buyer were charged with 100 L across the site. With one unavailable per buyer, the surviving cylinder meters 19 L. After a two-second pressure pulse, all 44 operating comparisons delivered at least 400.366 m³/h of genuine original hydrocarbon.
      Sustained inlet or jammed dischargeThe same finite stroke gives only 367.392 m³/h under sustained high pressure. If one active discharge jams open on each side after shutdown, 50 L can cross the closed boundary. A separate physical disconnect is essential.
      Matched cassette weightsA proposed mechanical comparator reweighs the actual sealed cargo before release. With oil density at most 900 kg/m³, the charged whole-batch bound is 0.902% water. At 920 kg/m³ it is 1.060%. The tighter case requires temperature matching within 0.05 K.
      What could defeat the weighing testAn unobserved 100 L return after testing lifts the whole-batch water bound to 1.376%. Weighing cannot resolve dissolved organic chloride independently. Isolation, contamination identity, retained water and the loaded receiver stop require physical qualification.

      Reference installation · all twenty incidents

      CaseRegistered eventCustody requirementRated exterior boundReference mission
      01Source closing energy lost and conventional valves jammedStop at onset0.9981 LPass
      02Terminal closing energy lost and conventional valves jammedStop at onset0.9981 LPass
      03Source and terminal closing energy lost with jammed conventional valvesStop at onset0.9981 LPass
      04Trigger inlets blocked with jammed conventional valvesStop at onset0.9981 LPass
      05Pilots blocked with jammed conventional valvesStop at onset0.9981 LPass
      06Sleeves torn with jammed conventional valvesStop at onset0.9981 LPass
      07Sleeve closing force tripled with jammed conventional valvesStop at onset0.9981 LPass
      085 mm² seat gaps with jammed conventional valvesStop at onset0.9981 LPass
      09Three route boundaries lostFlow for 72 h0.9981 LOpen
      10Independent heat envelope penetratedFlow for 72 h0.9981 LOpen
      11Closed catch boundary lostStop at onset0.9981 LPass
      12Loaded collapse and outer-vault loss at 60 hFlow to hour 600.9987 LOpen
      13100 mm source-gas wall breachFlow for 72 h0.9981 LOpen
      14Gas heat transfer degradedFlow for 72 h0.9981 LOpen
      15Catch heat transfer reduced at 60 hFlow to hour 600.9981 LOpen
      16Local pocket outer boundary lostFlow for 72 h0.9981 LOpen
      17Catch heat transfer lost at 60 hFlow to hour 600.9981 LOpen
      18Enclosure gas starts at 86°CFlow to hour 600.9987 LOpen
      19Catcher shield fully openFlow to hour 600.9987 LOpen
      20All current quality evidence falsifiedFlow for 72 h0.9981 LOpen

      Customer equipment trials

      The original 44 m³ lot has a 1% water limit. A one-litre sample can reveal an opening. A delayed 300 L water release makes the entire lot 1.178% water. Each design below has its own pressure, inventory and containment assumptions.

      ConfigurationResult
      Move the existing assayed stockMoving 14,700 m³ per train to the customer and deducting the entire terminal nitrogen pulse gives 400.661 m³/h minimum. All 20 material and stop schedules pass. No additional sale stock is credited.
      Low-pressure customer connectionA flywheel and a protected transfer head give 400.175 m³/h in the forward-flow test. A pressure wave at the actual inlet can interrupt delivery. The native customer requires positive liquid pressure throughout the event.
      New receiver on the surfaceThe full-pulse support works and new water and gas would add at least 0.008638 L before all additional customer equipment. One compartment can retain the tested dirty gas and clean carrier at 3.694 MPa.
      Buried receiver and rock supportsA 7 m internal radius and three entrances require 666,729 m³ for the two customers before the complete pressure arch and guard fittings. The 4 m gallery and 1,413 physical drives per train leave 69,976 m³ for those additions.
      Gas barriers at working fittingsAcross the straight panel, one live gas jacket gives 102.56 mm of gas along the limiting cut. A service intersection changes its direction twice. The flat panel alone cannot establish the gas length around an elbow, a hatch or a regulator.
      Closed water inventory in a supportA sealed measured charge and a hollow rod give a 68.013 MPa high-side pressure. After new nitrogen and metal are charged, the paired oil reduction in this separate component comparison is 0.001366 L. The selected installation still counts the gross expansion housing.
      Reinforced buried receiverDistributed anchors and a steel pressure arch carry the modeled ground loads. The service head and pressure gear raise the extra local works to 62,954 m³ on top of the two main receivers. A closed curved cap provides 204 mm of gas. A working regulator and the adjoining loaded ring each need a continuous verified boundary.
      Divide the actual buyer poolWith 32 of 768 pockets unavailable, 14 mm partitions displace 175.3 m³. The remaining water film is 0.0848 m against the 0.10 m minimum. Usable water-channel area is 46.25 m² against 48 m².
      Rupture of the guard supplyRupturing the entire 3,100 m³ nitrogen source at 38 MPa gives 37.617 MPa in its enclosure. The remaining guard holds 9.30 MPa. The four-metre gallery is short of 25,365 m³ even before excavation for portal frames.
      Reduced gallery height and drive countThe 3.5 m route and 1,595 drives per train pass all 80 thermal states, peaking at 117.09°C. They leave 130,647 m³ after the main buyer bores. A complete expanded pressure vessel must fit this volume and the remaining oil budget.
      Seam-free diagnostic bodyA straight replacement body removes the drilled diagnostic branch. The simulation adds an independent ninth fault in every pickup. The unmodified shared guard cannot protect all 1,152 fault regions; the selected installation retains the original 0.27648 L allowance for its 128 blind instruments.
      Rapid release into added expansion spaceA 17,378 m³ enclosure settles at 8.859 MPa. In a 560-cell calculation the pressure at the wall peaks at 10.404 MPa after 94.2 ms. The surviving guard holds 9.30 MPa. The larger shell and all its initial fluid also count toward the oil and earthwork limits.
      Raise the real buyer operating levelAn additional 5,250 m³ of water per buyer gives 0.211 m of water film with 32 cells lost. The compartment can hold the scheduled oil. A water front at the actual wet joint requires 64.18 mm of uninterrupted opposing flow in this model. A 45° defect gives only 5.66 mm in one span. Guarded water transfer remains unbounded.
      Smallest independent diagnostic retrofitTwo full gas supplies rupturing at one new diagnostic body can be contained at 3.543 MPa in the static calculation. Each modified site adds more than 24,000 tonnes, and the rapid response at its own foundation remains unproven. The case register claims zero oil savings from removing these branches.
      Pressure space, supports and excavation togetherThe expanded-vessel study compared 1,200 geometry and support combinations. With 35% extra gas space, the highest wall pressure is 8.654 MPa against 9.30 MPa and the rock checks pass. The installation exceeds the excavation limit by 17,636 m³ before the raised buyer works. The minimum paired oil charge is 1.001601 L.

      How the installation works