WEBVTT

1
00:00:00.000 --> 00:00:07.750
Even counting four small buyers, the tanks receive less than three hundred thirty-four cubic metres per hour in this changeover. The target is four hundred.

2
00:00:07.750 --> 00:00:16.750
At second eighty, one buyer fails. The lift pump waits five point one six seconds, then needs fifteen seconds to reach full flow.

3
00:00:16.750 --> 00:00:25.000
Only a sealed, disconnected cart rises. Its new parking deck and the catch basin below it rise together. The oil inlet stays at the original level.

4
00:00:25.000 --> 00:00:32.250
With one lift and one battery available, each exchange finishes in time. When both lifts jam, delivery through that yard stops.

5
00:00:32.250 --> 00:00:40.250
At half the planned contact area, the rig and supports stay below the soil-pressure limit. At thirty-five percent contact, the pressure is too high.

6
00:00:40.250 --> 00:00:47.750
The water starts at eighty-eight degrees. Two of three ice banks supply the modeled cooling, including the replacements needed over seventy-two hours.

7
00:00:47.750 --> 00:00:55.000
Four interleaved strip families load each sealed tile. The model loses one family and one insulating vacuum and still retains water pressure.

8
00:00:55.000 --> 00:01:03.250
The same internal balance fits zero or two reference litres outside. The actual exterior oil volume is unknown.

9
00:01:03.250 --> 00:01:11.750
When the water and oil remain separated, the ingress test clears its limit. Connecting all cold and receiving interfaces contaminates the modeled flow beyond that limit.

10
00:01:11.750 --> 00:01:20.750
Eleven schedules begin in service. Nine start isolated. A shared transfer waveform tests a separate buyer loss. None of the twenty complete missions is verified.

11
00:01:20.750 --> 00:01:29.250
At peak flow, two point eight four litres cross each inlet in the first forty milliseconds. Even an immediate response after that observation cannot take the oil back.

12
00:01:29.250 --> 00:01:38.500
With misleading scales, the independent liquid trip limits the two inlets to eight and a half litres. When that signal also appears healthy, fourteen hundred thirty-seven litres cross.

13
00:01:38.500 --> 00:01:48.250
Disconnect both original inlets before service and those faces can stay dry. Oil sent to a different buyer earns delivery credit when it actually enters the surviving tank.

14
00:01:48.250 --> 00:01:57.000
The upstream chamber gives 400.339. At the buyer tanks the total is 333.928.

15
00:01:57.000 --> 00:02:05.250
Four working cells supply three hundred seventy-four cubic metres over three days. The two yards together need eight hundred sixty more cubic metres of hot starting oil.

16
00:02:05.250 --> 00:02:14.000
The original sources shut down in sixty-five seconds. Adding modeled leakage leaves a small allowance. A single jammed cell exceeds the entire cutoff on its own.

17
00:02:14.000 --> 00:02:24.500
If the existing structure carries the roof, excavation leaves seven hundred seventy-seven cubic metres. A new full-area foundation would exceed the limit by about ten thousand.

18
00:02:24.500 --> 00:02:34.750
One lost strip family leaves enough pressure. Losing two drops the margin below the limit. Opening the water reference also fails cases twelve, eighteen and nineteen.

19
00:02:34.750 --> 00:02:44.500
At the slower withdrawal speed, both valves close before the coupling separates. Double the speed and oil still crosses. A hidden internal failure gives the connector no advance motion.

20
00:02:44.500 --> 00:02:54.250
The prelocked, empty inlet sees zero new oil. On the moving track, five point seven six litres cross the failed inlet inside a sealed carrier.

21
00:02:54.250 --> 00:03:05.000
The fourfold heat test and added resistance preserve the source strokes. Case twenty still needs independently qualified seller oil at the actual buyer tank.

22
00:03:05.000 --> 00:03:16.250
An immediate start helps. Even removing the ramp entirely leaves the buyer tanks below four hundred. More oil must reach the destination within the same sixty seconds.

23
00:03:16.250 --> 00:03:28.500
Four healthy feeds give a modeled floor of 400.247. With three, the lower bound of 398.960 no longer certifies the target.

24
00:03:28.500 --> 00:03:40.250
The first oil through the tank inlet must be seller-owned and on grade. Four feeds must reach that tank. Half the starter gas charge fails the hydraulic test. No complete mission is verified.

25
00:03:40.250 --> 00:03:53.000
At one hundred fifteen slots per minute, the slower response still clears the delivery target. One more missed carrier puts the bound below target. Fifty-three litres cross the failed inlet inside moving carriers.

26
00:03:53.000 --> 00:04:03.000
Three off-grade loads cut eligible tank receipts to 399.033 ref m³/h. Qualified replacement oil raises the floor to 404.379 ref m³/h.

27
00:04:03.000 --> 00:04:15.750
One lane needs 833.93 ref m³ of clean opening stock. 850 covers six full duties if the historical supply remains accessible to the seller.

28
00:04:15.750 --> 00:04:28.500
200 kW of continuous station heat leave a modeled 1.584 kPa water-pressure reserve. The original source strokes are preserved.

29
00:04:28.500 --> 00:04:41.750
At 35 mm preparation, the yard and drain total 72,199,924.379 m³, leaving 75.621 m³. At 50 mm they exceed the cap by 75.184 m³.

30
00:04:41.750 --> 00:04:54.500
With full removal, ingress is 0.698963402 L/h against a 0.699 L/h cap. Removing only 75% of the old area gives 0.699003609 L/h and fails.

31
00:04:54.500 --> 00:05:10.000
One jam gives 0.953 L. Two give 10.477720 L. Removing the service pipe first gives 0.952628 L with an intact source blank, or 1.070315 L with a 5 mm defect.
