WEBVTT

1
00:00:00.000 --> 00:00:11.750
With one switch, one lost cell, proved meters and tighter grade, The Haven Protocol models 400.443 cubic metres per hour of usable oil. The duty is 400.

2
00:00:11.750 --> 00:00:25.000
Each failed inlet must stay within 200 actual litres over seventy-two hours. The target is 150. The whole-site exterior limit is 1 litre. All twenty complete missions remain unverified.

3
00:00:25.000 --> 00:00:35.000
A receiver must confirm each fresh stroke across the original inlet. For complete diversion, the simulated upper bound is 54.208 hot litres.

4
00:00:35.000 --> 00:00:45.250
In a partial split, 501.830 hot litres crossed the inlet while only 16.728 diverted. The gross crossing exceeds the cap.

5
00:00:45.250 --> 00:00:55.000
With the existing seventy-five cubic metres per bank, water at an idle outlet reached at least 2.824 percent, above the 0.62 percent limit.

6
00:00:55.000 --> 00:01:08.750
With 462 cubic metres of buyer-owned oil per bank and 1.2 litres per second of exchange per cell, 16 schedules stayed at or below 0.6103 percent. Prior oil earns no new sales.

7
00:01:08.750 --> 00:01:19.250
Filling the chambers in sequence needs 849.985 of eight hundred fifty reference cubic metres. Only 14.998 reference litres are left.

8
00:01:19.250 --> 00:01:28.500
Simultaneous filling needs 850.033 cubic metres and fails. The new drives also require 30 more battery cabinets.

9
00:01:28.500 --> 00:01:37.750
With ten raised bays, two metres of rain, both guard streams and double the response water leave 113.296 cubic metres free.

10
00:01:37.750 --> 00:01:47.750
At two point four metres of rain, 131.504 cubic metres overflows locally. Oil crossing the property line remains unmeasured.

11
00:01:47.750 --> 00:02:00.500
For the same two-litre-per-second split, flush-mounted faces reduced gross crossing from 501.830 to 72.870 hot litres. Only 2.429 litres diverted.

12
00:02:00.500 --> 00:02:13.750
The measured upper bound is 114.467 litres, or 178.404 with one second of uncertain onset. Smaller splits and misrouting after capture can still exceed the cap.

13
00:02:13.750 --> 00:02:24.000
The Haven Protocol must measure and contain at most 200 actual hot litres per failed original inlet over 72 hours. The design target is 150 litres.

14
00:02:24.000 --> 00:02:35.250
The separate site-wide limit is 1 litre of oil outside containment. The zero-crossing trials in this film are diagnostic stress tests. All twenty complete missions remain unverified.

15
00:02:35.250 --> 00:02:46.250
With false weights, 1,442.857 reference litres, about 1.443 cubic metres, cross the two original inlets.

16
00:02:46.250 --> 00:02:55.000
A working independent trip limits paired crossing to 8.539 L. If it also reads healthy, 1,437.143 L cross.

17
00:02:55.000 --> 00:03:04.500
Four chambers per lane each discharge 1.5 reference litres. Each repeats every 104.35 ms, one quarter-cycle apart.

18
00:03:04.500 --> 00:03:16.250
A fresh confirmation of captured oil authorizes one more stroke. The model assumes a 20 ms return and rejects replayed confirmations.

19
00:03:16.250 --> 00:03:25.750
At second 80, 4.222 reference litres cross one failed inlet. Two simultaneous failures give 8.444 litres.

20
00:03:25.750 --> 00:03:36.000
Across all timings, forced discharge spans 3.750 to 5.250 litres per inlet. Every live case misses strict zero.

21
00:03:36.000 --> 00:03:43.750
Add 0.080 L of nozzle oil, 0.020 L from expansion and 0.005 L/h of seat leakage for 72 hours. The inlet bound becomes 5.710 L.

22
00:03:43.750 --> 00:03:49.500
These are assumed leakage allowances. Total oil escaping the site remains unknown.

23
00:03:49.500 --> 00:04:01.250
With continually false capture proof, 580.775 L cross one failed inlet in 10.1 s. The paired total is 1,161.551 L.

24
00:04:01.250 --> 00:04:09.250
If the charging and discharge valves open together, bulk oil can bypass the chamber limit. A leak past the witness can also go unseen.

25
00:04:09.250 --> 00:04:21.000
The healthy alternate gives a conditional 406.173 ref m³/h after one extra 30 L loss. The 40% target is 400.

26
00:04:21.000 --> 00:04:29.500
At 60 ms proof return, paired gross flow falls to 207 m³/h. One unavailable chamber also misses 400.

27
00:04:29.500 --> 00:04:40.750
Six schedules require 72 hours of delivery, five run for 60, and nine begin closed. The eleven flowing cases fail strict zero.

28
00:04:40.750 --> 00:04:53.500
Each chamber faces 2,484,000 strokes in 72 h. Stock, power, fatigue and physical capture remain unverified. Zero of 20 complete missions qualify.

29
00:04:53.500 --> 00:05:01.000
One independent dry proof per chamber allows a 1.5 L quarantine trial. A stale proof permits zero strokes.

30
00:05:01.000 --> 00:05:11.750
A loss after a valid proof lets four pilot doses send 6 L across the failed inlet. A forged return sends 150 L in 100 strokes.

31
00:05:11.750 --> 00:05:22.250
Two transient interruptions at fixed 115 give 398.396 ref m³/h in the first minute. The 40% requirement is 400.

32
00:05:22.250 --> 00:05:33.250
A two-minute burst gives 405.311 with one interruption and 400.820 with two, before any later inventory write-off.

33
00:05:33.250 --> 00:05:43.500
At hour 71, losing a whole buyer leaves 15,110.942 ref m³ usable at hour 72, far below the 28,800 m³ target.

34
00:05:43.500 --> 00:05:54.250
If exactly one of 40 independent sectors fails, 29,433.169 ref m³ remains. The fate of lost inventory outside the buyer is unresolved.

35
00:05:54.250 --> 00:06:04.000
Writing off one sector leaves a conditional retained-oil floor of 400.947 ref m³/h, including 2% maldistribution.

36
00:06:04.000 --> 00:06:13.000
Two sectors give 395.721 ref m³/h and miss 400. The partitions, loading balance and independent capture still require testing.

37
00:06:13.000 --> 00:06:24.000
At 100 mm preparation, the three stations add 189.376 m³. Omitting ten genuinely unbuilt mats leaves 79.475 m³.

38
00:06:24.000 --> 00:06:34.500
Omitting only nine exceeds the cap by 5.197 m³. Built mats earn no excavation credit; the retrofit exceeds the cap by 767.245 m³.

39
00:06:34.500 --> 00:06:47.250
After charging 1,920 new piles for the forty-sector receivers, 50 mm of preparation leaves 497.172 m³. At 100 mm the project exceeds its cap by 91.528 m³.

40
00:06:47.250 --> 00:06:57.500
Under 25% hydrotest load concentration, demand reaches 8,288 kN against 7,680 kN available per sector. Installed pile capacity and spacing are unverified.

41
00:06:57.500 --> 00:07:07.750
With drier holder gas and 0.02 nL for both directions of a plunger cycle, all listed water entering product totals 0.698685534 L/h.

42
00:07:07.750 --> 00:07:17.750
Original gas moisture gives 0.699704756 L/h. Even with dry gas, 0.10 nL per cycle gives 0.699576414 L/h. Both fail.

43
00:07:17.750 --> 00:07:29.500
For one interruption, deduct up to 5.272 ref m³/h of later single-sector loss from the cold-start receipt floor. The result is 400.039.

44
00:07:29.500 --> 00:07:40.500
With two interruptions the bound is 395.548 ref m³/h. The longer route and fixed failed inlet remain unqualified. No complete mission passes.

45
00:07:40.500 --> 00:07:51.750
Each adjacent bank needs 172.788 hot L of eligible prefill. Dry branches cap the first minute at 393.815 ref m³/h, even with ideal credit.

46
00:07:51.750 --> 00:08:06.750
At 20–50 ms arrival, holding 115 gives 399.969 ref m³/h. Holding 115.1 gives a conditional 400.070 after one interruption and one sector loss. No complete mission passes.

47
00:08:06.750 --> 00:08:20.750
A 24 m feeder crosses the original buyer inlet and supplies a local buffer. Only genuine capture at the buyer sectors earns credit.

48
00:08:20.750 --> 00:08:35.500
Qualified prefill leaves 0.424 ref m³ of seller stock. One interruption and one lost sector retain 400.070 ref m³/h. A fully dry first minute cannot exceed 322.756.

49
00:08:35.500 --> 00:08:48.250
Stopping on loss of hub capture still admits 99.922 hot L through one original failed inlet. Named pockets and assumed 72 h seat seep bring the pair to 203.706 hot L.

50
00:08:48.250 --> 00:08:59.750
A 120 reference-litre buffer may continue issuing genuine end receipts after a feeder break. True local receipts alone cannot prove the whole feeder is intact.

51
00:08:59.750 --> 00:09:11.750
At second 80 a real hub capture stop admits 91.800 ref L. With a full feeder break and the collar unavailable, continuing true receipts allow 207.300 ref L.

52
00:09:11.750 --> 00:09:24.000
Complete collar interception gives 104.611 hot L, or 110.894 with a jammed near seat. An unobserved part-flow leak loses 120 ref L in one minute while sales continue.

53
00:09:24.000 --> 00:09:34.500
The active bank has 161.433 kWh left at hour 72. At the higher viscosity it runs 0.765 kWh short.

54
00:09:34.500 --> 00:09:45.000
With a closed cover at 350 kW the minimum water-pressure margin is 1.582 kPa. At 300 kW an open cover fails cases 12, 18 and 19.

55
00:09:45.000 --> 00:09:56.500
Including the feeder and containment, 75 mm of ground preparation leaves 127.179 m³ of excavation. Two reused sites and ten genuinely unbuilt mats are required.

56
00:09:56.500 --> 00:10:06.500
At 100 mm preparation the works exceed the cap by 170.263 m³. Existing foundations and soil tolerances need a physical survey.

57
00:10:06.500 --> 00:10:15.250
All listed water transfer into oil reaches 0.698690 L/h against a 0.699 L/h limit.

58
00:10:15.250 --> 00:10:23.000
An additional 1 mL/h liquid crossover raises the total to 0.699690 L/h and fails.

59
00:10:23.000 --> 00:10:34.750
If 88.263 m³ of outgoing guard water carried 0.75 ppm oil by volume, it would carry 0.0662 L of oil. This is a concentration scenario.

60
00:10:34.750 --> 00:10:47.500
The whole-site oil upper bound is unknown. Eleven active cases fail strict zero and nine initially isolated cases remain open. Zero of twenty complete missions passes.

61
00:10:47.500 --> 00:10:56.250
With a sustained 2 ref L/s split, the two end meters can command closure within 0.764274 s even while the buyer receives oil.

62
00:10:56.250 --> 00:11:05.750
The valve takes 3 s to close. Up to 135.856 ref L cross the original inlet. Up to 4.755 hot L are diverted if the split tapers with closure.

63
00:11:05.750 --> 00:11:14.000
The jacket alone may need 14.349 hot L displacement. With full interception it commands by 7.139 s. The line still contains 753.982 hot L.

64
00:11:14.000 --> 00:11:26.250
The 3,610.491 hot L stress needs 56.124 hot L/s. The far-end path carries at most 30.293. A one-path near catch reaches 145.291 kPa absolute. A 1 s delay gives 162.470, over 150.

65
00:11:26.250 --> 00:11:34.000
The meter and catch works leave 87.358 m³ spare at 75 mm preparation. At 100 mm they exceed the cap by 210.285 m³.

66
00:11:34.000 --> 00:11:45.250
Both detectors can miss 1.2 hot L over 72 h. Total exterior release remains unknown. The independent wet standby retains 5.320 ref L of its opening 120 L during the overlap test.

67
00:11:45.250 --> 00:11:57.250
Overlapping standby commissioning and old-feeder closure conditionally retains 400.070 ref m³/h after one interruption and one sector loss. Waiting for closure gives 395.455 forward. Zero complete passes.

68
00:11:57.250 --> 00:12:07.250
False weights with real capture lost gave an upper bound of 112.708 litres with one seat jammed. A preclosed inlet gave 8.857.

69
00:12:07.250 --> 00:12:22.250
With independent onset timing, a two-litre per second split bounded at 155.817 litres. A one-second onset bracket gave 217.647 litres. That record cannot establish compliance.

70
00:12:22.250 --> 00:12:33.000
Physical separation triggered the dry withdrawal detector, giving 112.834 litres with one seat jammed. A fixed rupture with blind sensors missed that protection.

71
00:12:33.000 --> 00:12:46.500
The simulated actual total reached 225.879 litres. Reopening the same inlet can give 215.912. Keep the trip latched through loss of power and use a separate standby.

72
00:12:46.500 --> 00:13:03.250
The complete charged package is 3,659.628 hot litres. The local catch peaks at 145.291 kilopascals absolute. Delaying it gives 162.470, above the trial limit.

73
00:13:03.250 --> 00:13:14.250
Funding both inlet reserves leaves 0.261 reference cubic metres in the limiting seller. Continuing service depends on overlap with a charged standby and genuine buyer receipts.

74
00:13:14.250 --> 00:13:26.000
With one or two of the four stronger strips lost, minimum water pressure is 1.710 and 1.383 kilopascals. A fully open cover drops to 0.915.

75
00:13:26.000 --> 00:13:39.000
This requires dry preconditioning and load-bearing support. At one pascal second viscosity, a separate 150 kilowatt-hour cabinet leaves 45.897 kilowatt-hours after instrument power.

76
00:13:39.000 --> 00:13:54.750
With two reused yards and ten unbuilt deep lowerings replaced, the 100 millimetre preparation case retains 2,031.544 cubic metres. Keeping all already-built deep cuts instead exceeds the cap by 1,027.315.

77
00:13:54.750 --> 00:14:06.750
All twenty primary simulated inlet-volume fixtures meet two hundred litres. The one-litre exterior limit remains unverified. None of the twenty complete missions has been validated at an installation.

78
00:14:06.750 --> 00:14:20.750
The receiver registers 400.070 reference cubic metres per hour of bulk liquid. Deducting water and solids at the modeled starting grade gives only 397.990 cubic metres per hour of saleable oil.

79
00:14:20.750 --> 00:14:28.750
An attainable late fault gave 398.604 net. The requirement is four hundred in every rolling minute.

80
00:14:28.750 --> 00:14:43.250
With positive meter bias at or below 0.25 percent, water at or below 0.62 percent, solids at or below 0.03 percent, and chloride within its limit, the modeled floor is 400.443 net.

81
00:14:43.250 --> 00:15:01.750
The second-eighty switch gives 403.777. Allowing product at the full contract limits gives a realisable late-fault result of 399.446, below duty. The limiting seller needs 849.739 of eight hundred fifty reference cubic metres.

82
00:15:01.750 --> 00:15:19.250
A nearby complete tear to low backpressure operated an independent mechanical breaker. With one seat jammed, the simulated actual total was 118.054 hot litres. The conservative upper was 132.570, within the one hundred fifty litre target.

83
00:15:19.250 --> 00:15:31.500
A rupture that preserved local pressure missed that trip. The lower bound was 213.159 litres, beyond the two hundred litre maximum. These are original-inlet measurements.

84
00:15:31.500 --> 00:15:46.500
In nine initially isolated cases, the modeled guard water carried 0.066197 litres of oil on one pass. A hypothetical repeated return gave 1.152 litres of outward crossings and zero final exterior inventory.

85
00:15:46.500 --> 00:16:02.750
Separate guard capture retained 30.669 cubic metres of local storage margin in the tested power and lift failure. Two guards sharing one basin overflowed by 13.462 cubic metres. Whole-site release and all twenty complete missions remain unverified.
