WEBVTT

1
00:00:00.000 --> 00:00:08.500
Six cases need flow for seventy-two hours. Five stop at hour sixty. Nine start closed. Each train loses eight piston pairs.

2
00:00:08.500 --> 00:00:15.750
At second eighty, the buyer fails while the scales still look healthy. The new chamber receives oil before a separate pump lifts it to storage.

3
00:00:15.750 --> 00:00:25.000
False scales let fourteen hundred litres cross. Faster seats cut paired crossing below nine litres. If the physical witness also lies, most of the loss returns.

4
00:00:25.000 --> 00:00:32.000
Larger charged chambers preserve forty percent flow with one tube lost. A longer detection and opening delay takes delivery below target.

5
00:00:32.000 --> 00:00:39.750
Two powered bays lift oil into the filling tank. Its remaining space is about three hundred sixty cubic metres. A single bay cannot finish.

6
00:00:39.750 --> 00:00:46.750
At the original grade, the hot start clears the pressure limit. Raising the floor to save excavation fails three pressure cases.

7
00:00:46.750 --> 00:00:53.000
A profiled vault floor keeps the process grade and fits the modeled cut limit. Over-excavation erases the saving.

8
00:00:53.000 --> 00:00:59.500
With separate spill bays and thick sealed joints, the model stays just below one litre. A thinner joint exceeds the limit.

9
00:00:59.500 --> 00:01:04.750
Moving gas holders can contain a blocked vapor route. A fixed roof or a jammed holder fails.

10
00:01:04.750 --> 00:01:13.750
Eleven cases were flowing at the injected fault. Nine had already closed. All twenty source schedules ran. No complete installation has been verified.