THE HAVEN PROTOCOL
Narrated industrial simulation

What the system must keep running
Every scheduled minute has its own delivery or isolation requirement.
The Haven Protocol is a proposed emergency transfer system for crude oil and produced fluids. Two separate trains connect finite source, collection and customer inventories. This study tests twenty assigned damage conditions. Six cases require at least four hundred cubic metres per hour for seventy two hours. Five require delivery until hour sixty and then isolation. Nine require immediate isolation. Each case also faces common limits on foundation response, escaped oil and excavation.
40% of 1,000 m³/h
Eight pairs lost per train
20 assigned cases

Can a short residual stroke open the buyer?
The valve requires fresh drive travel. A clutch closes it when forward drive stops.
The buyer still receives oil at the same inlet. A mechanical collar starts closed each minute. The drive must take up a set distance to open it. A separate clutch drops out when forward drive stops. With a silent catch and ten seconds of residual drive at the minute boundary, the timer alone let 1.136 cubic metres through. The collar and clutch let 0.000 cubic metres through. All 20 scheduled controller cases met their modeled duties. The lowest full-minute average was 400.118 cubic metres per hour with eight piston pairs unavailable on each train. Both inlets pause during the minute. A longer moving stroke can still open the collar. Its timing matters.
1.136 m³ timer alone
0.000 m³ with collar
400.118 m³/h minimum

Follow one barrel of oil
Two transfer trains have separate drive and sale circuits.
Shutters limit how much oil a damaged section can feed. A jacket and enclosed catcher take leakage to a retaining basin. Oil in the drive cylinder pushes a piston. A dry link moves a second piston holding previously qualified oil. The customer is farther downstream. A leak in the sale pipe can change what finally reaches the buyer.

A fixed stroke ratio protects the reserve
160 paired stations per train • eight pairs parked before startup
The drive piston is just under three metres across. A fixed sale to drive area ratio of one point zero zero eight sets the delivered volume. Each available pair starts with at least ninety nine percent of its charged travel. The model subtracts the starting offset and the adverse alignment allowance. Oil behind the eight parked pairs stays locked.
32.4 mm travel left
49.8 m³ stock margin

How much liquid do the pistons move?
The model counts the lower bound in each minute before checking grade at the buyer.
In six recovery cases the pistons moved at least four hundred and three point five reference cubic metres of liquid per hour for seventy two hours. At least twenty nine thousand and fifty one cubic metres crossed the original meter. Further checks subtract water and sediment and test the oil at the actual customer connection. A separate run starting at only ninety eight percent charge missed thirty four minutes.
403.49 m³/h at meter
29,051 m³ in 72 h
34 short minutes

An explosion interrupts delivery
Case 12 • assigned industrial receiver damage at hour 60
This illustration assigns damage from an industrial explosion at hour sixty. The loaded receiving spout and its vault are lost. The flash marks the change in equipment state. Physical disconnection ends customer receipt. Residual stroke enters closed cups. The upstream source met its shutdown threshold in sixty five seconds, and the final twelve hours recorded zero customer delivery. A common loss of the replacement supports and foundations is a separate simulation. That more severe condition can drive liquid over containment.

What stops oil from returning?
A finite holding chamber separates the incident branch from normal customer delivery.
If the receiving side stays pressurized, it can push oil back toward a reopened source branch. The branch starts parked. Three shutter planes and two closed wells intercept leakage. The normal delivery route passes separately. Each well holds one hundred twenty cubic metres. In the loaded test with a sixty three kilopascal pressure difference, the first well retained sixteen and a half cubic metres, and no bulk oil returned to the donor. If the path starts open, a ten millisecond pressure rise sends ten point seven cubic metres back before closure.
16.50 m³ caught
0 m³ bulk return
10.72 m³ reverse

Can gas cross a dry opening?
Stored vacuum and a separate nitrogen pocket keep gas moving away from the source branch.
Oil remaining below a sill does not stop gas. At a dry reopening, the parked wet assembly alone returned six point two kilograms of gas. Adding a sealed, low pressure tank on the donor side and nitrogen on the collector side prevented bulk return in the rated seventy two hour dry test. A second vacuum tank is a separate option. It kept bulk gas from returning with any one of four partitions opened. A combined opening, reduced vacuum volume and enlarged defects returned just over one kilogram of tagged collector gas. Even a small assumed mixing rate can move traces upstream without reverse bulk flow.
6.18 kg without dry guard
4/4 single partitions
1.035 kg tagged return

What moves when the floor lifts?
The containment wall and the liquid metering rails respond on different supports.
A pressure pulse pushes on the containment wall. The wall loads a transfer frame. Opposed gas springs at the shoes move in either direction as the load changes. Their geometry and the stiffness of the bed determine the reaction under each support. The receiving station and its hot water pressure reference have their own support rails. Movement still travels through the ground. A rail can lose enough usable head to interrupt a due delivery even while the frame stays upright.
Finite spring travel
Distributed rock contact
Independent process rails

How far does the ground move?
Matched output from the weak-ground run during the first thirty-two seconds.
This is the modeled movement as it happens. The green curve follows the ground beneath the center pickup. The brown curve follows the surface one thousand and fifty metres away. In this particular run their greatest downward movements are 70.6 and 3.3 millimetres. The structure and the ground move by different amounts. The model follows both, then calculates how much the supported oil and water rails move. The ground at an actual site could respond differently.
70.6 mm at pickup
3.3 mm at distance
1 GPa upper rock layer

How does the moving wall cross the pipe?
Two independent sliding enclosures surround the stationary process lines.
Each pickup has two guarded crossings. The moving sleeve slides around a stationary pipe trunk. Clean liquid feeds two narrow sealing lands. A blind receiver holds leakage from each side. The process pipe and its instrument reference stay together on their own rails. The thirty metre sleeve allows six metres of travel in each direction. The lands have thirteen and a half metres of separation, so a wetted patch stays clear of the outside lip through a full twelve metre reversal. A shortened sleeve, jammed guide, lost pressure supply or excessive clearance can defeat the guard.
30 m sleeve
±6 m axial stroke
13.5 m lip separation

How does the finer grid protect hot water?
A dry support grid beneath the water face distributes pressure across smaller spans.
An eight millimetre grid uses the same steel stock with more contact points. Its free-water pressure margin rises from 1.348 to 2.099 kilopascals. Both gas orientations and all twenty flow or isolation schedules passed the pressure replay. Four adjacent unsupported spans drop that margin to 0.898 and exceed the structural limit. The fine support needs verified bonds and clean surfaces. The combined rock reaction is 1.893 megapascals against a limit of two.
1,241 Pa at transfer
2.09922 kPa water
1.893 MPa on rock

Where does oil go during disconnection?
A charged, blind surge cylinder stays on the local process side of each disconnector.
The customer outlet disconnects locally. A separate cylinder can take oil in or push commissioned oil back into its own line as pressure changes. A sealed pilot uses stored nitrogen and a private gas receiver. Four cylinders can move without reconnecting the customer. The full modeled surge moves thirteen point two cubic metres in either direction. Sixteen cubic metres in each cylinder at the start leaves two point eight cubic metres at the low point. Starting with six cubic metres exhausts the supply. A seized gas pilot also fails the pressure check.
16 m³ initial oil
13.21 m³ surge
6 m³ prime fails

How does the remote gas blower keep moving?
Each pickup receives a finite hydraulic drive with its own stored nitrogen and returned-water receiver.
A cold, charged nitrogen chamber moves clean water through a hydraulic motor. The motor turns the gas blower that cools the remote inventory. The return water stays in its own receiver. The normal customer line uses its original pair of metering pistons. The blower starts in 128 seconds on the modeled clock. Temperature and pressure stay within limits across eighty gas states. A stuck shaft, a loss of pressure, or excessive heating can defeat the cooling system.
Finite drive charge
128 s startup delay
80 gas conditions

What changes when the gas loss swaps sides?
One train retains 73% of its gas storage. The other retains 100%. Then the two assignments switch.
Each direction passed forty gas checks on a two and a half second clock. Peak gas reached 116.068 degrees Celsius on the seventy three percent side. With the sixteen millimetre reference grid, the tightest water margin came on the fully accessible side in case eighteen. All twenty schedules held in each direction. We checked every required minute with eight piston pairs disabled on each train. Both pressure assumptions used the same two underlying train records.
116.068°C peak gas
1.34757 kPa reference
40/40 gas states each way

How does the catcher manage displaced vapor?
A separate closed gas space on each side accepts the short pulse and the three-day thermal load.
Liquid entering the isolated collector displaces gas. Separate sealed spaces receive vapor from the donor and dirty sides. A broad local crown gives the donor gas somewhere to expand before vapor travels through the longer pipe. All 20 case clocks stay inside the 120 degrees Celsius and 70  kilopascals gauge limits. The refined donor reaches 117.48 degrees Celsius and the refined catcher 114.20 degrees Celsius. Loss of segregation of the water exits sends the donor to 122.10 degrees Celsius.
12 s rapid pulse
120°C temperature limit
72 h mass and energy

Where can escaped oil go?
The same one-litre limit covers both trains over the full seventy-two hours.
Oil reaching the outermost site boundary is charged across both trains. The calculation tracks bulk liquid, traces carried in guard and service water, dirty gas, internal receiver overfill and oil dragged on a moving sleeve. Each wall opening has its own guard. A bypass that reaches the outside directly defeats inner collection. The project needs a complete inventory of penetrations and functioning protection at each one. The guards also consume pressure, space and clean water.
Both trains combined
All guarded penetrations
1 L over 72 hours

How much oil reaches the outside?
Both trains share a one-litre exterior limit over seventy-two hours.
The largest assigned system-wide exterior oil bound is 0.998720 litres. There are 1.280 millilitres left across both trains. This includes the added grid surface, trapped oil and trace contamination in the guard and support fluids. Two separate failed trials open a path through all protective layers. A continuous common opening gives a site bound of 14.142 litres. If one part per million of the oil passes every layer, the bound becomes 128.383 litres.
0.998720 L assigned
14.142 L common opening
128.383 L through all layers

Can the receiver trust the readings?
Case 20 assigns false readings and false references while actual chemistry changes.
All three chloride displays appear normal. Their reference samples also give false readings. The blind drive cylinder takes the incoming out of specification oil. Its piston moves a separate batch that was assayed before the incident. A false starting assay defeats this mechanism. Water entering the sale pipe downstream also requires a separate test at the buyer.

Which customer equipment keeps water out?
A filter, a clean-oil pressure guard and isolated batches each face a damaged connection.
Of 180 filter settings, 111 passed at low water pressure and 0 at full wet pressure. With one supply lost, a clean-oil guard held 19.60 megapascals. A restricted feed let 8.431 percent water reach one litre. A direct opening lifted total exterior oil to 1.019148 litres. A local litre reached 6.35 percent water. That sample exposes a route for contamination. Its size differs from the original quality lot. A timer that continued after hour sixty released 67.25 cubic metres after shutdown. Two twenty five litre oil cylinders per buyer were tested with one jammed on each side. The available strokes kept genuine flow at 400.366 cubic metres per hour after a two second pressure pulse. Sustained high pressure reduced flow to 367.392, below four hundred.
111/180 low pressure
0/180 full pressure
6.35% local water

What can the buyer actually accept?
Each indexed 44 m³ lot retains its identity through the original two-hour quality hold.
At each buyer, six cubic metres of authenticated oil left in the tank held bulk water to 0.840 percent with only the upstream leaks. This stock earns no delivery credit. Indexing the original lots gave 0.927 percent with brief pressure exposure. Extending the wet exposure through the two hour hold gave 8.242 percent. A delayed three hundred litre dose alone gives 1.178 percent in one whole lot, over the one percent limit. A separate trial divides each buyer’s backing water into six million closed circuits. With thirty two circuits emptied, a fully swept lot can accept only 46.36 more litres held over from earlier transfers. The preliminary exterior account already reaches 0.999891 litres. A common connection can empty more circuits. The eleven delivery cases still need protection at the actual buyer.
0.927% brief exposure
8.242% wet hold
1.178% delayed dose

What if the sample says the oil is clean?
Case 20 falsifies both current samples and their references.
A water guard can keep oil inside while pushing water toward the customer line. A hidden opening in the model admits sixteen litres in the first pulse. The pressure pockets and masks preserve a lower bound of four hundred point three nine cubic metres per hour of actual hydrocarbon reaching the station. Water gets no flow credit. The installed separation passes 9 of twenty assigned quality duties. The matched crude starts at 401.7 cubic metres of dry hydrocarbon per hour before leaks. A dirty litre reveals a local exposure. The original quality decision concerns the composite of an isolated forty four cubic metre lot, held for two hours. Three one litre samples can all mislead. Damage between the release cell and the actual buyer can still change the lot.
44 m³ original quality lot
2 h isolated assay hold
3 × 1 L sample witnesses

What if the buyer drains its backing water?
A closed nitrogen space replaces the water at each actual buyer. New oil enters the buyer through its original bottom inlet.
The dry receiver trial followed 27,064 portions of the original stock. With twenty litres of wash water and a one tenth square millimetre opening exposed during the two hour hold and transfer, maximum water was 0.963884 percent. All eleven operating cases met grade under those assumptions. A single hundred litre pocket failed 48 portions. Only 5 of eleven groups passed. A connected water source through the original opening failed all eleven even at density head. Some prequalified oil waits for nearly seventy two hours. The two hour hold alone cannot bound contamination while those cells wait. Opening that same path from incident onset raised water to 10.149 percent. 23,896 portions failed. None of eleven groups met grade. Reducing the opening to three thousandths of a square millimetre gave 0.974 percent and eleven grade passes. At four thousandths, only 5 groups passed. The limiting portion was 16.172 cubic metres at hour seventy two. A catcher starting at atmospheric pressure needs at least 12,688 cubic metres more excavation than allowed across the site. Starting at ninety kilopascals absolute leaves 45,804 cubic metres inside the limit, including a twenty percent construction allowance. External loads, leakage and automatic shutdown still need proof. The complete score stays at nine.
0.974% at 0.003 mm²
10.149% at 0.10 mm²
12,688 m³ over

What changes with a larger receiver?
The wall sees a brief pressure peak before the larger gas volume equilibrates.
The three and a half metre gallery passes all eighty blower heat tests. With 17,378 extra cubic metres, buyer pressure settles at 8.859 megapascals. It briefly reaches 10.404 after 94 milliseconds. The guard supplies 9.30. A larger receiver keeps the peak to 8.654 megapascals in the five hundred and sixty cell model. That pressure test passes. The design still exceeds excavation by 17,636 cubic metres before the final buyer connection. Its modeled oil bound is 1.001601 litres, above the one litre limit. Neither receiver passes the full mission.
8.654 MPa larger case
17,636 m³ over
1.001601 L oil

What would this take to build?
The excavation budget and the space needed above ground describe different parts of the project.
There are one hundred and twenty eight pickup yards. Their support footprints alone add up to 27.2 square kilometres before extra roads and clearances. Total tied materials and charge across their foundations reach about 1.23 billion tonnes. That includes ballast, equipment and fluid. The modeled excavation is 71.898 million cubic metres. Staying within the digging limit leaves major questions about land, materials, construction and whether a smaller system can do the same job.
27.15 km² of yards
1.229 billion t tied
71.898M m³ cut

How does the buyer keep its water supply finite?
Sealed-gauge comparison. Each gauge can empty only its own contents.
The buyer has two sealed gauges. Each has its own pinched and welded fill stem. Both buyers together hold 0.113 litres in all four gauges. The original counterwater is drained. A separate closed vessel receives wet utility leaks and keeps the displaced gas inside. Counting gas moisture and diffusion, all four capsules can empty in the same hour and give 0.299 litres. Rain collected from eight times the open area raises that to 0.555. Sixteen times gives 0.811, above the two-buyer limit of 0.699 litres. Water left from washing, direct spray and reversed gas pressure must also be counted.
0.299 L sealed sources
0.555 L with rain
0.811 L adverse

How does the drive avoid carrying contaminated liquid?
A dry shaft transmits movement. Separately stored oil travels twelve metres into the actual buyer.
The wet drive ends at a blind pressure wall. Magnetic couplings move a solid shaft across the three hundred and fifteen metre gap. A local drive pushes the original qualified stock through a short oil line. A physical coupling at the actual buyer must interrupt that motion when the buyer disappears. With seat leakage, eightfold rain collection and the dock gas moisture, all 44 operating comparisons reached at least 400.438 cubic metres per hour. A clean separation at two point five metres per second stopped delivery. If the outer key still looked engaged while an internal port ruptured, 1.171 cubic metres could still reach that opening, even when the indicated flow looked normal.
400.438 m³/h trial
160 gas traces
1.171 m³ retained-port fault

Can the catcher take a sudden flash?
Hot oil can release vapor faster than a pipe can carry it to a storage sphere.
One comparison adds thirty vacuum spheres per buyer. With one isolated and one percent of the hot oil flashing, the fully connected and cooled banks settle at 81.6 kilopascals absolute. In an insulated two second release, the local gas reaches 437.4 kilopascals before the remote space can help. The limit is 171.3. The full receiver trial flashes zero point one five percent of its hot oil. Forty seven ports opening after a tenth of a second, cold shafts and 3.4 million square metres of metal fins per buyer held peaks to 118.874 kilopascals and 101.75 degrees Celsius. Waiting three tenths of a second gave 288.112 kilopascals and failed. The model assumes distributed gas contact with clean, cold fins.
437.4 kPa local
118.874 kPa with fins
288.112 kPa delayed

Where does rainwater go?
Three gas passages per buyer each have two cold air boxes. One box at every passage is unavailable.
Pressure pickups on the outside of the pipe remove the water-filled gauge ports. Cold sloping steel drains moisture into closed pots. Across six exposed passages, rain and humid air gave 0.430 litres in the worst hour before the new gas charge and gallery water. Starting the boxes hot gave 3.605 litres. Letting one percent of collected water re-enter the air also exceeded the limit.
0.430 L cold
3.605 L hot
2.896 L with carryover

What if the pressure buffer is already connected?
Passages connect the space above the oil to closed vessels held at the same initial pressure.
The gas has room to expand immediately. With eighteen of forty eight passages unavailable, pressure peaked at 168.2 kilopascals, below the 171.3 limit. Halving the effective heat transfer raised pressure to 171.5. When one percent of the hot oil flashed, it reached 411.5. These are simulated transient pressures.
168.2 kPa peak
171.5 kPa half contact
411.5 kPa at 1% flash

Can the outer chamber hold a full dock spill?
A sealed chamber around the dock retains line and guard oil even when every drain is blocked.
In the static test, 56.2 cubic metres of oil plus rain reached 897 kilopascals. With only a quarter of the vessel connected, oil alone exceeded its twelve hundred kilopascal limit. An opening that continues through both buyers to the outside can release 67.1 cubic metres in seventy two hours. Thin cooling plates took the full heat released by condensing steam. The wet two second test reached 1006.33 kilopascals and 120 degrees Celsius. With half the cooling surface reachable, gas reached 147.01 degrees and exceeded the temperature limit.
1006.33 kPa wet pulse
147.01°C half area
67.1 m³ outside

What if the buyer fails between clock ticks?
The buyer port stays in the same place in each trial. Previously earned movement can still deliver fresh oil.
A larger inlet can repay every required minute in all twenty schedules when loss falls on the clock boundary. Moving one loss ten seconds later allows 2.262 cubic metres through after shutdown. An alternative mechanical receipt device limits metered run-on to 6 litres if the buyer piston stops. A hidden drain can keep that piston moving.
20 aligned schedules
2.262 m³ after loss
6 L finite movement

Case register   1–5
Each row is scored against its own duty and all shared mission limits.
Cases 1 through 5. All five meet their assigned service, containment and construction gates.
1  |  Source closing energy lost and conventional valves jammed  |  Isolate immediately  |  Pass
2  |  Terminal closing energy lost and conventional valves jammed  |  Isolate immediately  |  Pass
3  |  Source and terminal closing energy lost with jammed conventional valves  |  Isolate immediately  |  Pass
4  |  Trigger inlets blocked with jammed conventional valves  |  Isolate immediately  |  Pass
5  |  Pilots blocked with jammed conventional valves  |  Isolate immediately  |  Pass

Case register   6–10
Each row is scored against its own duty and all shared mission limits.
Cases 6 through 10. 3 of these five meets every modeled gate. The table gives each case's required delivery or isolation time.
6  |  Sleeves torn with jammed conventional valves  |  Isolate immediately  |  Pass
7  |  Sleeve closing force tripled with jammed conventional valves  |  Isolate immediately  |  Pass
8  |  5 mm² seat gaps with jammed conventional valves  |  Isolate immediately  |  Pass
9  |  Three route boundaries lost  |  Deliver for 72 h  |  Open
10  |  Independent heat envelope penetrated  |  Deliver for 72 h  |  Open

Case register   11–15
Each row is scored against its own duty and all shared mission limits.
Cases 11 through 15. 1 of these five meets every modeled gate. The table gives each case's required delivery or isolation time.
11  |  Closed catch boundary lost  |  Isolate immediately  |  Pass
12  |  Loaded collapse and outer-vault loss at 60 h  |  Deliver 60 h, then isolate  |  Open
13  |  100 mm source-gas wall breach  |  Deliver for 72 h  |  Open
14  |  Gas heat transfer degraded  |  Deliver for 72 h  |  Open
15  |  Catch heat transfer reduced at 60 h  |  Deliver 60 h, then isolate  |  Open

Case register   16–20
Each row is scored against its own duty and all shared mission limits.
Cases 16 through 20. 0 of these five meets every modeled gate. The table gives each case's required delivery or isolation time.
16  |  Local pocket outer boundary lost  |  Deliver for 72 h  |  Open
17  |  Catch heat transfer lost at 60 h  |  Deliver 60 h, then isolate  |  Open
18  |  Enclosure gas starts at 86°C  |  Deliver 60 h, then isolate  |  Open
19  |  Catcher shield fully open  |  Deliver 60 h, then isolate  |  Open
20  |  All current quality evidence falsified  |  Deliver for 72 h  |  Open

How many cases passed the full mission?
The reference installation and the redesigned buyer have separate full-case results.
The final register credits 20 of twenty flow or isolation duties. Across all assessed gates, 9 of twenty cases pass. Excavation in the selected model is 71.898 million cubic metres. The exterior account records 0.998720 litres on the modeled loss paths. The dry receiver geometry requires 72.195 million cubic metres of excavation. All 27,152 simulated product portions passed the modeled quality checks. All twenty delivery and isolation schedules for the dry receiver met the timing requirement when the actual buyer disconnected as designed. The registered installation has 9 full passes. The dry receiver earns zero additional full passes. A common opening through the sleeve leaked 6.03 millilitres, beyond its remaining allowance. Wash water and a retained key can also defeat the design.
20/20 flow duties
9/20 complete
71.898M m³ cut

Where does the liquid go?
A closed square basin surrounds each buyer. Gas vessels sit farther out.
The test releases all 16,678 cubic metres of oil and water into a lined enclosure. Even at the highest modeled drain rate, at least 13,262 cubic metres must stay near the buyer after two seconds. With the drains shut, the nine-second wave calculation conserves liquid and reaches 3.12 metres at the outer wall. Moving the gas vessels clears the basin corners in plan. Counted excavation reaches 72.128 million cubic metres for the sixteen-metre-high basin. When the full local gas charge arrives, pressure reaches 215 kilopascals and temperature reaches 167 degrees Celsius. Both exceed the existing limits.
16,678 m³ released
3.12 m wall depth
215 kPa sealed gas

How dry must the new gas be?
Keeping the full gas charge inside trades local storage volume against water ingress.
Without a remote exhaust or extra heat removal, 290,619 cubic metres of accessible gas volume per buyer just meets the temperature limit. That is equivalent to a 45.6-metre basin if all of it is available, or 182 metres if only one quarter is connected. To stay within the water limit, the new gas must contain at most 0.094 parts per million water by volume with full access, or 0.025 with one-quarter access. At zero point zero two parts per million, the harder calculation gives 0.689 litres in the hour. At zero point two, it gives 1.050 litres and fails. Roof strength, ground settlement and gas travel time must still be established on this layout.
290,619 m³ accessible
0.689 L at 0.02 ppm
1.050 L at 0.2 ppm

Can the roof keep rain out?
A sloped roof over the closed dock sheds water through four open edges.
Simulated rain falls at two hundred millimetres in an hour. With a zero point one five millimetre equivalent opening in each roof, two open edges give 0.627 litres and one open edge gives 0.654 litres. Both are below the zero point six nine nine litre limit. Block all edges and total water reaches 0.759 litres. Double the opening with one edge still available and water reaches 1.190 litres. Spray under the roof also defeats the weather cover. Roof performance needs its own combined test with the buyer.
0.627 L / two edges
0.759 L / blocked
1.190 L / wider seam

When does a delivery count?
A registered stop ends sale credit. Liquid can still move within the protected system.
Follow one portion from source to buyer. Only movement that reaches the accepting buyer boundary and meets grade counts as a sale. At a registered stop, no new portion is credited. Fluid already moving may run into a system-owned guard. Its volume must stay within the guard on the same timeline. A concealed downstream loss can produce the same piston movement and pressure as accepted delivery. Those signals alone cannot settle custody. The model needs a physical route from each disputed portion to a verified receiver or to containment. An upstream catch provides a physical signal. At five seconds, accumulated catch volume distinguishes all assigned stops from healthy operation, including the five hour-sixty losses. The calculation bounds healthy movement from its cumulative counter. A signal travelling three hundred metres at the assumed wave speed and the closing seat leave seven point eight six seconds of the larger inlet's optimistic time allowance.
Buyer receives oil
Guard contains run-on
Hidden loss unresolved

Does the complete receiver qualify?
The six full-duration duties require 400 m³/h for 72 hours with eight piston pairs down per train.
The cold vents and connected gas vessels give 0.648 litres of water in the tested hour. Genuine minimum flow is 400.432 cubic metres per hour. All 27,152 portions met modeled grade. The highest water content was 0.618 percent. With two nanograms per litre of oil in the treated utility water and one part per million of escaped main hydrocarbon ending up outside as oil, the total is 0.9964 litres. At ten parts per million it reaches 1.0281 litres and fails. Identified excavation is 72.071 million cubic metres. With a further zero point two degrees of heating and twenty five millimetres of elevation change, hot water retained 1.341 kilopascals of margin. At forty millimetres, 3 cases missed. Hidden buyer failure still leaves zero of twenty complete redesign cases established.
0.648 L in one hour
400.432 m³/h
0/20 full buyer cases

Can the buyer wait six seconds?
A mechanical interlock holds each stroke until the interval opens for sale.
Across all 20 assigned cases, the six-second interlock met the modeled flow, stop and grade checks. The lowest due minute delivered 400.118 cubic metres per hour. All 27,152 portions met modeled grade. In all 56 registered stop variants, zero new oil passed into a failed buyer. Held movement stayed on the system side. In a separate hidden-loss test with a silent catch, 1.136 cubic metres entered the failed buyer. No sale was earned. The fourteen-metre oil line and the dry mechanical shaft have different duties. Pump and auxiliary demand rises from 25.13 to 29.03 kilowatts for the faster inlet. Modeled mission energy is 6.615 gigajoules per buyer with 7.405 available. Stroke pressure, peak power capacity and containment of unobserved losses still need a combined test. The full-installation pass count remains unestablished.
400.118 m³/h minimum
0 m³ at 56 registered stops
1.136 m³ silent catch

What if flow continues into a hidden loss?
The clutch shortens discharge. Forward travel after a real loss can still open the inlet.
Move the loss twenty seconds into the minute. The collar alone lets 2.051 cubic metres through. Adding the clutch cuts that to 1.443. Only 3 of 240 timing offsets gave zero. At reset a twelve-second tail still passes 0.219 cubic metres. A drive that keeps moving just like a healthy buyer passes 6.786 cubic metres in its first minute. Oil at a failed buyer can enter internal containment or reach the exterior. At one part per million condensable gas, the exterior allowance has just 3.632 millilitres left. Cases twelve, eighteen and nineteen still need gas, liquid and supports simulated together. All 27,152 scheduled sale portions met their modeled grade. Zero of twenty cases have complete installation evidence.
0.000 m³ at reset
1.443 m³ at 20 s
6.786 m³ first minute

Can weighing the buyer catch diverted oil?
A separate load measurement compares the oil leaving the seller with the mass gained by the buyer.
With a separate scale and a forty-five kilogram trip, the twenty-second loss passes 0.235 cubic metres before closure. The collar and clutch alone pass 1.443. The assumed load accuracy still needs an installed test. Now let the drive keep moving and the spill land on the same weighed support. The scale still sees the oil. In the first minute, 6.786 cubic metres crosses the failed inlet and zero reaches the buyer as genuine sale.
1.443 m³ without scale
0.235 m³ separate catch
6.786 m³ shared support

Can the receiver hold the hour-60 flood?
A 5.5 m perimeter wall and 1.25 m foundation mat fit within the modeled receiver footprint.
In cases twelve, eighteen and nineteen, with eighty percent of the area usable and the drains blocked, the liquid stands 3.96 metres deep. The wall leaves room above the liquid. At sixty percent usable area, it misses the required freeboard. With thirty gas routes open, the peak is 167.832 kilopascals, below the 171.325 limit. With twenty-four routes, 178.866 exceeds it. Loads on the supports and exterior leakage remain open.
3.96 m at 80% area
167.832 kPa, 30 routes
178.866 kPa, 24 routes

What if the liquid starts on one side?
The buyer inlet stays in place. A lower floor, a 6.8 m curb and upward roof pipes give the liquid and gas separate paths.
Starting the oil over sixty-five percent of the floor gives a 6.007 metre peak, leaving 0.793 metres to the top. Concentrate it on fifty-five percent and it overtops at about 1.145 seconds. Twenty-four open roof pipes give 170.499 kilopascals against a 171.325 limit. Seven give 231.595 and fail. This layout projects 0.999411 litres of exterior oil only with the stated clean gas and intact containment. No complete installation case is established.
0.793 m to crest
1.145 s to overtop
0.999411 L conditional

What stops oil when a flowing buyer fails?
A false weight can hide diversion. Each trial follows where the oil physically goes.
At second twenty, 75 hot litres per second flow into each buyer. Oil diverts onto the weighed platform. Weight rises. Genuine sale stops. We count reference litres across both inlets. A thirty-five litre stroke checks inlet movement. Without it, 4.85 litres cross with a rigid line, or 8.61 with an elastic line. Oil diverted beyond the pickup still moves it. The ten-second drive tail passes 1,443 litres. All the spill hits a separate flap. The seat closes in 0.219 seconds after 25.57 litres cross. Collect only a tenth and the flap misses the fault. Runoff can trip a healthy unit. A slowly moving selector can shut the valve before separation. That gives zero crossing. The serial stroke tops out at 325.87 cubic metres per hour, below four hundred. Three overlapping cylinders per buyer reach 400.044 cubic metres per hour at ten metres of lift in simulation. On this waveform, stopping inlet movement limits crossing to 12.91 litres, including line elasticity. If the pickup keeps moving, intercepting the spill limits crossing to 27.77 litres. Miss both checks and 1,437 litres cross. Genuine sale is zero. No complete installation is validated.
4.85 L inlet check
25.57 L spill trip
1,442.86 L bypass

On-screen results
Before the fault. 75 hot L/s per inlet. The fault starts twenty seconds into the minute. Both inlets are already open.
The spill still loads the scale. 0 L genuine sale. Oil reaches the catch on the weighed platform. The scale continues to show a gain.
Independent inlet measurement. 4.85 L at a rigid stop. A 35 L seller stroke needs matching movement at the inlet. Allowing stored oil to expand in the test line raises crossing to 8.61 L.
A fault beyond the inlet pickup. 1,442.86 L crosses. Oil moves the inlet pickup and then diverts. The scale and the inlet pickup both appear healthy.
Separate spill chute and flap. 25.57 L crosses. Trip at 0.135 s. Fully shut at 0.219 s. Holding full flow until then gives 31.29 L.
Oil misses the chute. 1,442.86 L crosses. Collecting only 10% gives too little force. Clean runoff onto the flap can also stop healthy delivery.
Progressive selector movement. 0 L after separation. The intact selector moves at 0.20 m/s. Sudden internal diversion gives the valve no such advance travel.
Normal delivery with the 35 L stroke. 325.87 m³/h gross ceiling. The serial 35 L stroke misses 400 m³/h with ramps and handoff. A separate 250 L design meets its service screen at 8 m lift.
Three overlapping 35 L cylinders. 400.044 m³/h. Minimum across 175,680 due minutes at 10 m lift. All 27,152 reconstructed sale lots met modeled grade.
The combined design catches a spill. 27.77 L crosses. Both the scale and the inlet pickup still appear healthy. The oil reaches the independent trip. If inlet movement stops first, 12.91 L crosses in the elastic-line trial.
The last pickup can still be fooled. 1,437.14 L crosses. Stopped pickup at second 20 gives 10.71 L with ideal closure or 12.91 L in the elastic-line trial. A downstream loss still drives the pickup. Genuine receipt is zero.

What can the receiver actually hold?
Final tank level, thermal backing and overflow are tested against separate limits.
A sealed buyer tank docks at the original inlet. If diverted oil moves the meter and loads the scale, a flat tank level limits crossing to 117.2 reference litres. A falsely rising level allows 1,437. Genuine sale is zero. With two empty tanks staged, 254 changes per buyer sustain 400.038 cubic metres per hour in the model. All 27,152 lots meet grade. Steel plates on fitted shims raise the hot-water pressure margin from 1.341 to 2.316 kilopascals. A hundred-millimetre gap drops it to 0.179, below the requirement. Spread the oil in a ribbon across sixty-five percent of the receiver floor and none crosses the curb. Start it in a corner over the same area and 54.34 cubic metres crosses before modeled wall-to-roof contact. In a forty-five percent corner trial, a roof branch jams after the pressure peak. The maximum stays below the limit. Closing that branch from the start gives 172.404 kilopascals and fails. The outer catch can hold the routed pulse, but a horizontal sheet can travel 4.31 metres across a 4 metre catch. Combining mobile tanks and backing also exceeds the one-litre exterior oil allowance at the stated cleanliness. No complete installation is qualified.
117.194 L at tank proof
2.316 kPa backed
54.34 m³ over curb

On-screen results
What reaches final storage? 117.194 L crosses. An independent follower measures the oil surface in the docked tank. At second 20 neither the weights nor the inlet meter registers the diversion.
Can the tanks change during service? 400.038 m³/h. 255 of 256 tanks per buyer are used. Two empty tanks start at the dock. The model charges the added neck, seals, storage and changeovers.
What does continuous backing buy? 2.316 kPa margin. At +0.2°C and 25 mm elevation shift, the required margin is 1.330 kPa. The 12 mm backed-panel replay delivers 400.044 m³/h. Rated exterior oil is 0.999802 L at the assumed cleanliness.
Where does the liquid first collect? 54.34 m³ over the curb. One receiver, the same oil volume and 65% initial floor coverage. The quantity shown is hot oil before the first resolved wall–roof contact in the corner case.
When does a roof branch close? 170.472 kPa at late closure. In a separate 45% corner trial, one of 24 available gas branches jams at 1.526 s. The pressure peak occurs earlier. A branch shut from the outset gives 172.404 kPa.
Can the outer catch intercept the overflow? 4.31 m sheet range. The routed pulse stays below the rim, but a horizontal sheet can jump the catch. Separately, the modeled exterior oil for backing plus mobile tanks is 1.000227 L against a 1 L limit.

What can a scheduled stop prove?
Buyer faults, stored oil and continuous delivery in the same 72-hour model.
All 14 scheduled stops admit zero new graded oil. Disconnection also admits zero if a moving selector closes the valve first. Faster movement admits almost six litres. A sudden diversion admits 117 reference litres with a working tank gauge. When every reading stays identical, 1,437 litres cross and the failed buyers retain none. With false weights, a working mechanical follower limits crossing to thirty-five litres. A jam restores the full loss. One millimetre of error stops healthy service. Shorter roof pipes meet the pressure limit. Their nominal oil allowance has only twenty microlitres to spare, before any bulk spill. Opening the parked tanks’ gas returns controls catch pressure. More than six hundred cubic metres of oil still occupies the aisle at hour seventy-two. Adjusted gearing supplies 400.159 cubic metres per hour. Higher gearing exhausts stock. No complete installation has qualified.
14 scheduled stops
18,021 identical readings
At most 34.568 L across 240 sampled starts
20.26 µL to spare
212 tank gas returns available
27,152 lots meet grade

On-screen results
When does the valve close? Advance warning 0 L across. Faster movement 5.94 L across. 14 scheduled stops. No new graded oil crosses at the scheduled stops. In the moving-selector test, the dot marks valve closure and the tick marks disconnection.
Can the instruments tell which tank received the oil? Working buyers 1,437.143 L kept. Failed buyers 0 L kept. 18,021 identical readings. Crossing with a working final gauge is 117.194 reference litres. At 400 m³/h, some blind 100 ms interval must carry at least 11.11 L.
Can a mechanical follower detect lost oil? Working follower 34.524 L across. Follower mimics motion 1,437.143 L across. At most 34.568 L across 240 sampled starts. Bench candidate with ±0.10 mm tracking, 15 ms lag and 80 ms valve closure. A 1 mm error stops healthy service.
Can the tank and backing share the oil allowance? Nominal exterior oil 0.999980 L. Short-pipe pressure 171.306 kPa. 20.26 µL to spare. Nominal ducts run 37.9 and 37.2 m. The pressure test shortens both by 50 mm. The 171.325 kPa limit holds. Bulk oil escape is unresolved.
Where does oil from parked tanks end up? With gas returns 111.76 kPa. Oil still on the aisle 636.9 m³. 212 tank gas returns available. The 3.075 m catch has 5.61 m³ to spare after warming by 32°C. The flow replay leaves oil on the aisle at hour 72.
How much delivery margin remains? Revised gearing 400.159 m³/h. Required flow 400 m³/h. 27,152 lots meet grade. The revised ratio leaves 1.207 m³ per buyer. A higher ratio exhausts stock. Roof and storage still require qualification.

Where does the oil end up?
Case duties, under-deck drainage and load-bearing seats in the 72-hour simulation.
The register covers twenty cases. Eleven require delivery and fourteen require a stop. Three also require capture after an hour-sixty loss. The vault has 250 cubic metres to spare with eighty-four percent of the floor usable. At eighty-two percent, the full-stock test overfills it. The primer starts the drains in 5.2 seconds. At hour seventy-two, 3.2 cubic metres remain on the aisle. A jammed bleed leaves nearly seventy-five. With trapped flash gas, pressure stays within its limit while 4,964 cubic metres of oil remain on the aisle. The thinner shim maintains the required water-pressure margin. A separate wide-gap trial with a thicker shim fails three cases. The installed foundations still need a load test. At the assumed gas cleanliness, modeled trace oil stays below one litre. The original gas condition exceeds it. No complete installation has qualified.
Loaded catch required in cases 12, 18 and 19
3.75 m clear depth
Drains start after 5.22 seconds
Trapped gas from 0.15% flashed mass
1.330 kPa required pressure margin
0 of 20 complete installations qualified

On-screen results
Which cases need a loaded catch? Delivery due 11 cases. Scheduled stop 14 cases. Loaded catch required in cases 12, 18 and 19. 9 stop immediately, 5 deliver for 60 hours, and 6 deliver for 72 hours. The delivery and stop groups overlap.
Does the vault have enough room? 84% usable floor 249.5 m³ spare. 82% usable floor 168.7 m³ short. 3.75 m clear depth. One buyer, full 72-hour stock. The static volume includes storm water, 32°C warming, space for debris and freeboard.
Can the downcomers start without added water? Working primer 3.175 m³ on aisle. Jammed bleed 74.889 m³ on aisle. Drains start after 5.22 seconds. One loaded buyer, 12 hours after the stop. With working primers, 12,824.2 m³ is in the catch and 2.26 m³ in the downcomers.
Does a passing pressure test ensure capture? Catch pressure 166.871 kPa. Oil on aisle 4,964 m³. Trapped gas from 0.15% flashed mass. The gas pressure stays below 171.325 kPa. Gas from the liquid still displaces oil onto the aisle. Its final exterior destination is unverified.
What does the revised bearing achieve? Rated 6 mm shim 2.394 kPa. Separate gap trial 0.179 kPa. 1.330 kPa required pressure margin. The rated 12 mm plate assumes at least 75% bearing. The separate adverse trial uses a 12 mm shim and a 100 mm bedding gap.
Which limits remain open? 0.65 ppbv gas 0.999571 L oil. 5 ppbv gas 1.005150 L oil. 0 of 20 complete installations qualified. At 0.65 ppbv, only 0.429 mL remains for bulk escape. The model delivers about 400.157 m³/h and requires 72.192 million m³ of excavation.

What changes when the buyer tank has four strips?
Spill still loads the scale. The original drive passes 1,443 litres across both inlets. The buyers retain none. Each strip fills in turn. Faster level sensing cuts crossing from twenty-one litres to under fourteen. A seller-side bellows catches some oil during closure. The bench simulation still passes nearly eleven litres. The compact feed passes 11.68 new litres. The buyers retain none. The filled passages already hold another 152 litres that could drain. If the mechanical follower falsely keeps moving too, 1,437 litres cross. The buyers retain none. With a one-percent leak, most oil still reaches storage. Of 375 litres crossing, at most 3.76 litres are diverted. Zero crossing occurred when the valve seated before disconnection. The four-strip receiver remains a bench proposal.

On-screen results
What happens when a flowing buyer fails? Original collar and clutch. 1,442.86 L crossed. At second 20, each buyer takes 75 hot L/s. Ten seconds of residual drive follows the loss. Volumes are reference litres for both buyers.
Four strips measure the final tank level With four strips, same inlet. 13.587 L crossed. The full-width tank passes 21.409 L in the same bench model. The 2.25 m feed to these straight strips fails its operating-pressure test.
The bellows takes oil on the seller’s side Local hydraulic bench model. 10.980 L crossed. The level trips after 39.75 ms. A 12 L bellows per seller buffers oil behind the inlet. No oil reaches final storage.
What changes with a compact center feed? Modeled service near 400.151 m³/h. 11.68 L crossed. Zero reaches storage. If 0.76 mm of frame motion shifts the gauge, it can stop healthy flow or raise crossing to 19.18 L.
What if the follower keeps moving? False weight and false follower travel. 1,437.143 L crossed. The diverted oil never enters final storage. The modeled drive keeps its permission through the residual-motion interval.
A small leak gives a different result At most this much was diverted. 3.7531 L. The one-percent leak case admits up to 375.31 L across the inlets. Most of that oil still reaches the buyer.
When did the crossing actually reach zero? Preclosed selector test. 0 L crossed. The valve had already shut before a slow, mechanically sequenced disconnect. The four-strip design has no physical qualification.